Hard and Deeply Buried Target Defeat System (HDBTDS) Program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $14.9M |
| FY25 | $139.4M |
| FY26 | $144.1M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $62.0M | $52.7M | $39.7M | $41.3M | $111.5M | $53.0M | $12.8M | $113.6M | $14.9M | ||
| Enacted | $54.6M | $74.3M | $17.4M | $36.7M | $113.1M | $52.8M | $12.9M | $141.8M | $19.3M | $139.4M | ||
| Request | $74.3M | $17.4M | $71.5M | $113.1M | $52.9M | $15.9M | $106.8M | $19.3M | $154.4M | $144.1M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2019 book requested $71.5M for FY2019; the PB2021 book reported $41.3M as actual total obligation authority — $30.2M below the request. 41.3 − 71.5 = -30.2 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Direct Strike Penetrator Systems
The Direct Strike Penetrator Systems program develops and modifies a family of advanced precision-guided penetrator munitions to include evaluation of integrated technologies for the development/integration of advanced position, navigation, and timing (PNT) capabilities (i.e., Global Positioning System (GPS), non-GPS, optical, passive, active, etc.) and smart fuze systems, and all penetrator components, that will provide the Air Force with improved ability to attack Hard and Deeply Buried Targets (HDBT), such as bunker and tunnel facilities, using air-to-surface conventional munitions. Systems developed include, but are not limited to Massive Ordnance Penetrator (MOP), GBU-72 Advanced 5,000-lb Penetrator Weapon System (A5K), and Section 804 Rapid Prototype/Rapid Fielding activities. Systems developed will be integrated onto current and future platforms to reduce the number of weapons required to hold HDBTs at risk and will result in more targets engaged per mission flown. Direct Strike Penetrators will provide critical global strike capability not met by inventory conventional weapons and will hold at risk the best protected high value assets essential to an enemy's war fighting ability. The project also provides an opportunity to quickly insert emerging technologies into existing and developing aircraft munitions and fuzes. A Hard Target Munitions (HTM) Analysis-of-Alternatives (AoA) was conducted in 2014 to determine the best weapons and/or development efforts for addressing the HDBT mission area. The HTM AoA determined that it was necessary to develop a family of HTMs in order to apply effects to the entire range of HDBT sets. The Air Force is using the AoA to develop, produce and modify HDBT weapons identified as the most effective and affordable. Modeling and simulation is used to assess and characterize current inventory and to drive design and explore the utility of new classes of penetrator munitions. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605829F, 0605831F, 0605833F, or 0605898F. In FY 2024 0.0M was expended for civilian pay expenses in this program element. In FY 2025 and FY 2026, $1.5M each is forecasted for civilian pay expenses in this program element. This program leverages digital acquisition tenets of open, agile, and digital. Common component development, in collaboration with other weapon systems, to reduce redundant costs between systems with similar subsystems requirements. Invests in analytical, information management, data management, digital environments, networks, facilities, and security infrastructure upgrades directly supporting development and sustainment of this program's capabilities, while leveraging DoD and DAF enterprise IT solutions. This effort includes design, development, test, integration, and implementation of appropriate modular open systems approach, related components, and efforts, such as, but not limited to electrical, logical, and physical interfaces defined in relevant Open System Architecture (OSA) standards. This approach allows modular and severable subsystems, to include those that are software-defined, at the appropriate level to be incrementally added, removed, or replaced throughout the life cycle. The FY 2026 request was reduced by $0.131 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative.” This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. This effort is in Budget Activity 4, Advanced Component Development and Prototypes (ACD&P), because efforts are necessary to evaluate integrated technologies, representative modes or prototype systems in a high fidelity and realistic operating environment.
Justification
Accomplishments & Planned Programs (3)
Next Generation Penetrator
Next Generation Penetrator (NGP) is the development and demonstration of an advanced large penetrator concept to augment Combatant Command (CCMD) capability against hard and deeply buried targets. Utilize subscale, sled, and phenomenology testing in concert with modeling and simulation efforts to design necessary components that meet required lethality, accuracy, survivability, and penetration performance parameters. Culminating in full scale testing and delivery of prototype technical data packages for both a warhead concept and guidance system.
Massive Ordnance Penetrator (MOP) Modification (Mod)
Modification of Smart Fuze functionality to enhance MOP weapon performance, holding additional hard and deeply buried targets (HDBT) at risk in multiple CCMD. Construct relevant HDBTs for testing. Execute MOP testing in support of modification efforts to include sub-scale and full-scale ground and flight tests. Analyze MOP weapon effectiveness.
Advanced 5,000 lb (A5K) Penetrator
GBU-72 Advanced 5,000 lb (A5K) Penetrator is an improved 5,000 lb class penetrator to address capability gaps identified in the HTM AoA. Conduct A5K design, development, integration, modeling and simulation, and testing to improve performance against increasingly hardened targets. This effort utilizes existing and improved technologies to field an integrated penetrator weapon system to include: an improved penetrator warhead, a smart fuze system that can detect layers/voids, and a modified Joint Direct Attack Munition (JDAM) tail kit for all weather, precision guidance, navigation, and control.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Air Force | F | FY24 Actuals | $14.9M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Enacted | $139.4M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Total | $139.4M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Disc. Request | $144.1M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Total | $144.1M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $0 | $14.9M | $139.4M | $144.1M | $144.1M |
| 645341: Direct Strike Penetrator Systems | $0 | $14.9M | $139.4M | $144.1M | $144.1M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Hard and Deeply Buried Target Defeat System (HDBTDS) Program. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J553
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J489
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J524
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J543
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J555
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J576
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J538
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J531
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J526
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J534
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Research and Development Test and Evaluation, Vol. I · www.saffm.hq.af.mil
PDF page 13