What it is
Rapid Technology Capability Prototype (0604320M) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 2 projects.
What changed
-$69.9M FY25→26 R-1 TOA · PB2026
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$50.7MR-1 TOA · PB2026
FY25 Total
$86.2MR-1 TOA · PB2026
FY26 Request
$16.3MR-1 TOA · PB2026
FY25→26 Change
-$69.9MR-1 TOA · PB2026

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order so the direction of travel is readable at a glance: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order so the direction of travel is readable at a glance: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $50.7MFY25: $86.2MFY26: $16.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$50.7M
FY25$86.2M
FY26$16.3M

All series figures: R-1 TOA · PB2026

Decade view — P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
11 fiscal years of this program as published (FY2016–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
11 fiscal years of this program as published (FY2016–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY16FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$16.4M$6.99M$4.86M$5.51M$11.2M$74.4M$50.7M
Enacted$0$7.05M$7.11M$4.56M$5.66M$11.6M$67.9M$131.8M$86.2M
Request$7.05M$7.11M$4.56M$3.66M$6.55M$62.9M$131.8M$120.4M$16.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $131.8M for FY2024; the PB2026 book reported $50.7M as actual total obligation authority — $81.1M below the request. 50.7131.8 = -81.1 USD millions — the compact figures above are rounded for reading.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission Rapid Technology Capability Prototype

The Marine Corps Rapid Capabilities Office (MCRCO) is established under the direction of the Commandant of the Marine Corps (CMC) to identify, develop, and transition emergent and disruptive capabilities that significantly enhance survivability, lethality, and effectiveness for the Fleet Marine Forces (FMF). MCRCO focuses on rapid prototype development, testing, and integration of cutting-edge technologies at Technology Readiness Level 7 or higher, ensuring seamless and efficient transition to the FMF. Leveraging both government and commercial off-the-shelf solutions, as well as developmental items, MCRCO plays a critical role in maintaining the Marine Corps' strategic readiness and technological edge.

Mission Rapid Prototype Development, Marine Corps

The Marine Corps Rapid Capabilities Office (MCRCO) is established under the direction of the Commandant of the Marine Corps (CMC) to identify, develop, and transition emergent and disruptive capabilities that significantly enhance survivability, lethality, and effectiveness for the Fleet Marine Forces (FMF). MCRCO focuses on rapid prototype development, testing, and integration of cutting-edge technologies at Technology Readiness Level 7 or higher, ensuring seamless and efficient transition to the FMF. Leveraging both government and commercial off-the-shelf solutions, as well as developmental items, MCRCO plays a critical role in maintaining the Marine Corps' strategic readiness and technological edge. Additional details about the MCRCO, including project specifics, can be found at a higher classification level.

Mission Congressional Adds

Wing-in-Ground-effect (WIG) platforms are an emerging alternative maritime transportation capability that will disrupt the adversaries kill chain and result in a cost imposition on enemy targeting. WIG platforms have potential to fill capability gaps in the Marine Corps' family of Littoral-Maritime Transportation & Mobility Systems. WIGs are water borne, inexpensive, maneuverable, platforms offering an alternative mode of high-speed surface transportation in a contested maritime, anti-access/area denial (A2AD) environment. Operating in ground effect provides maximum operational efficiency and allows the vessels to be certified as a maritime platform vice an aircraft, reducing certification and training requirements.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget Line Items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$50.7M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$86.2M
Research, Development, Test and Evaluation, NavyNFY25 Total$86.2M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$16.3M
Research, Development, Test and Evaluation, NavyNFY26 Total$16.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget Figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$93.5M$50.7M$86.2M$16.3M$16.3M
0386: Rapid Prototype Development, Marine Corps$93.5M$50.7M$76.2M$16.3M$16.3M
9999: Congressional Adds$0$0$10.0M$0$0

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1,741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Rapid Technology Capability Prototype — no program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

No research dossier for this program — dossiers cover 50 of 1,741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →