Battle Mgmt Com & Ctrl Sensor Development

Air ForceRDT&EPartial Reconciliation0604283F

Watch this program: RSS · Atom

What it is
Battle Mgmt Com & Ctrl Sensor Development (0604283F) is an Air Force research & development line funded in the Research, Development, Test and Evaluation, Air Force account. Its J-book detail breaks the line into 1 project.
What changed
+$98.3M FY25→26 R-1 TOA · PB2026
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$27.4MR-1 TOA · PB2026
FY25 Total
$69.0MR-1 TOA · PB2026
FY26 Request
$167.4MR-1 TOA · PB2026
89.6% reconciliation

$17.4M discretionary + $150.0M one-time reconciliation. Discretionary change vs FY2025 enacted: -74.9%.

FY25→26 Change
+$98.3MR-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows (such as advance procurement) that the R-2/P-40 J-book program line excludes. How the two bases relate →

FY26 Request · $167.4M TOA − $17.4M J-book line = 150.0M (167.417.4 = 150.0)

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order so the direction of travel is readable at a glance: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order so the direction of travel is readable at a glance: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $27.4MFY25: $69.0MFY26: $167.4MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$27.4M
FY25$69.0M
FY26$167.4M

All series figures: R-1 TOA · PB2026

Decade view — P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span, and 1 year is a break in the line rather than a low value: an edition the program is absent from, never interpolated. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span, and 1 year is a break in the line rather than a low value: an edition the program is absent from, never interpolated. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$0$27.4M
Enacted$0$40.0M$69.0M
Request$40.0M$100.2M$167.4M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $40.0M for FY2024; the PB2026 book reported $27.4M as actual total obligation authority — $12.6M below the request. 27.440.0 = -12.6 USD millions — the compact figures above are rounded for reading.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission ARSR-4 Replacement - Hawaii

This budget line item funds the replacement of the current Hawaii Air Route Surveillance Radar Version 4 (ARSR-4) to include prototype development, test, site preparation, and installation. The replacement radar will address DoD capability gaps driven by new threats and provide dual use for Hawaii Air Traffic Control (ATC). The new system is designated the ARSR-4 Replacement Hawaii (ARSR4R-HI) Long Range Radar (LRR). It is a key component of the integrated Homeland Defense capability for the defense of Hawaii and a high priority mission for Pacific Air Forces and the United States Indo-Pacific Command. The ARSR4R-HI program addresses the following surveillance shortfalls: 1. Lack of surveillance capabilities to meet today's mission needs such as inability to characterize and classify targets or cover all required airspace. 2. Inability to scale and update capabilities to pace evolving threats. 3. Obsolescence associated with 1980s era ARSR-4 equipment and infrastructure leading to excessive sustainment, operations, and maintenance costs. To address these surveillance shortfalls, development of the ARSR4R-HI system will consist of improved detection performance for modern air threats, mitigate new interference sources, and utilize state of the art surveillance technologies and processing capabilities. The ARSR4R-HI solution is based on a non-rotating, multi-panel, phased array radar system which provides persistent surveillance with improved accuracy and detection performance supporting an advanced engagement sequence to counter modern threats with target cueing and fire control quality data. The ARSR4R-HI components include a ground based surveillance radar, radar dome, associated shelters, and other smaller Government Furnished Equipment (GFE) items. The DoD currently owns the site for the location of the installation and the FAA leases the site. The ARSR4R-HI program includes the award of two Rapid Prototype Development capability demonstration contracts (Phase I) followed by down-select (Phase II) to a single vendor for Non-Recurring Engineering (NRE), mature prototype delivery, installation, interface with Command and Control (C2) nodes, and test of the new radar at the Mt. Ka'ala site. The FY 2026 cost of the ARSR4R-HI Middle Tier of Acquisition effort is reflected in the budget request, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission. The FY 2026 request for ARSR4R-HI includes 17.4 million of discretionary and 150.0 million of mandatory (reconciliation) funds for a total of 167.4 million. The mandatory (150.0 million) funds, along with 45.7 million of FY 2025 funding, enable award of the Phase II prototype system contract. Further information for this reconciliation request is provided in Section 20003 of the Reconciliation Exhibit. The FY 2026 request was reduced by 0.136 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such programs funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY 2024, 0.599 million was expended for civilian pay expenses in this program element, and in FY 2025 1.955 million is forecasted for civilian pay expenses in this program element. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Justification

Accomplishments & Planned Programs (1)

ARSR-4 Replacement Hawaii (ARSR4R-HI)

The ARSR4R-HI will be the Ground-Based detection, discrimination, and tracking radar to support defense of Hawaii. It will enable integrated fire control and engagement support. It will replace the current ARSR-4 radar located on Mount Ka'ala (4,019 ft in elevation), Oahu, Hawaii. The radar will provide data to multiple DoD and FAA missions simultaneously, including Area Air Defense (AAD), Air Traffic Control (ATC), and Traffic Management. The radar suite will provide capability to process modern threats (air cruise missiles), provide increased sensitivity using mature state of the art technologies, increase performance in multi-mission operations, provide modularity, flexibility, and growth opportunities.

Budget Line Items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY24 Actuals$27.4M
Research, Development, Test and Evaluation, Air ForceFFY25 Enacted$69.0M
Research, Development, Test and Evaluation, Air ForceFFY25 Total$69.0M
Research, Development, Test and Evaluation, Air ForceFFY26 Disc. Request$17.4M
Research, Development, Test and Evaluation, Air ForceFFY26 Reconciliation$150.0M
Research, Development, Test and Evaluation, Air ForceFFY26 Total$150.0M
Research, Development, Test and Evaluation, Air ForceFFY26 Total$17.4M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget Figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$27.4M$69.0M$17.4M$17.4M
673587: ARSR-4 Replacement - Hawaii$0$27.4M$69.0M$17.4M$17.4M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1,741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

1 mention from the Senate LDA disclosure database.

LOCKHEED MARTIN CORPORATIONBattle|Sensor2025matched 2+ title words

S 2296/HR 3838 - Streamlining Procurement for Effective Execution and Delivery and National Defense Authorization Act…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Battle Mgmt Com & Ctrl Sensor Development — no program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

No research dossier for this program — dossiers cover 50 of 1,741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →