Next Generation Jammer (NGJ)
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $39.9M |
| FY25 | $76.7M |
| FY26 | $64.2M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $224.6M | $376.5M | $559.0M | $584.5M | $426.7M | $480.7M | $435.4M | $230.4M | $64.7M | $39.9M | ||
| Enacted | $387.8M | $577.8M | $632.9M | $449.4M | $491.9M | $447.2M | $235.4M | $54.7M | $40.5M | $76.7M | ||
| Request | $577.8M | $632.9M | $459.5M | $524.3M | $477.7M | $243.9M | $54.7M | $40.5M | $86.7M | $64.2M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2018 book requested $632.9M for FY2018; the PB2020 book reported $584.5M as actual total obligation authority — $48.4M below the request. 584.5 − 632.9 = -48.4 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Next Generation Jammer (NGJ)
The Next Generation Jammer Mid-Band (NGJ-MB) (formerly known as Next Generation Jammer Increment 1) is the next step in the evolution of Airborne Electronic Attack (AEA). It is a critical capability necessary to defend against current, evolving, and developing Electronic Warfare gaps, ensures kill chain wholeness against growing threat capabilities and capacities, keeps pace with enemy threat weapon systems' advancements, and supports the continuous expansion of the AEA mission areas that exceed the capability of legacy systems. NGJ-MB utilizes enhanced techniques and tactics to deliver significantly improved radar and communications jamming effectiveness to include classified capabilities. Utilizing Modular Open Systems Architecture supporting software and hardware updates to rapidly counter emergent and evolving threats, NGJ-MB is a key enabler and force multiplier for operations across the spectrum of missions defined in the Defense Strategic Guidance, including strike warfare, projecting power in highly contested environments, and counterinsurgency/irregular warfare. NGJ-MB also addresses the shortfalls in scalability, flexibility, supportability, interoperability, availability, and capability of the existing AN/ALQ-99 Tactical Jamming System to ensure continued spectrum dominance. This Program Element (PE 0604274N) supports the AN/ALQ-249 NGJ-MB program. NGJ-MB will address AEA capability and sufficiency gaps against enemy threats operating in the middle frequency bands of the electromagnetic spectrum. In addition, this PE supports NGJ-MB Extended (MBX), which is an Engineering Change Proposal (ECP) to the current NGJ-MB system that will extend the upper frequency coverage limit to counter modern and adaptive threats. This modification will increase frequency range of the NGJ-MB system and enhance the survivability of the platform and protected entities against emerging threats. In total, NGJ-MB will provide the ability to effectively engage enemy threats from increased stand-off distances, employ increased capacity (number of jamming assignments) against enemy targets, and support agile employment by operators. The NGJ-MB system will be integrated on the EA-18G tactical aircraft and will augment and then replace the legacy AN/ALQ-99 Tactical Jamming System in the middle frequency bands. NGJ-MB (to include MBX) is a Cooperative development and production program with the Royal Australian Air Force (RAAF).
Mission — Next Generation Jammer
This Program Element (PE 0604274N) supports the AN/ALQ-249 NGJ-MB program. NGJ-MB will address AEA capability and sufficiency gaps against enemy threats operating in the middle frequency bands of the electromagnetic spectrum. In addition, this PE supports NGJ-MB Extended (MBX), which is an Engineering Change Proposal (ECP) to the current NGJ-MB system that will extend the upper frequency coverage limit to counter modern and adaptive threats. This modification will increase frequency range of the NGJ-MB system and enhance the survivability of the platform and protected entities against emerging threats. In total, NGJ-MB will provide the ability to effectively engage enemy threats from increased stand-off distances, employ increased capacity (number of jamming assignments) against enemy targets, and support agile employment by operators. The NGJ-MB system will be integrated on the EA-18G tactical aircraft and will augment and then replace the legacy AN/ALQ-99 Tactical Jamming System in the middle frequency bands. NGJ-MB (to include MBX) is a Cooperative development and production program with the Royal Australian Air Force (RAAF).
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $39.9M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $76.7M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $76.7M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $64.2M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $64.2M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $3.96B | $39.9M | $76.7M | $64.2M | $64.2M |
| 0557: Next Generation Jammer | $3.96B | $39.9M | $76.7M | $64.2M | $64.2M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| RAYTHEON COMPANY | N0001916C0002 | high |
| THE BOEING COMPANY | N0001916C0032 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Next Generation Jammer (NGJ). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J367
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J317
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J347
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J359
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J371
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J382
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J356
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J347
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J346
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J349
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil