Multi-Mission Helicopter Upgrade Development
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $70.6M |
| FY25 | $65.4M |
| FY26 | $64.8M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $11.2M | $17.5M | $5.19M | $5.31M | $16.2M | $18.7M | $35.7M | $53.0M | $53.4M | $70.6M | ||
| Enacted | $18.9M | $5.28M | $5.37M | $16.6M | $19.2M | $36.9M | $54.4M | $54.7M | $62.4M | $65.4M | ||
| Request | $5.28M | $5.37M | $16.6M | $19.2M | $27.3M | $46.4M | $44.7M | $62.4M | $60.4M | $64.8M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2023 book requested $44.7M for FY2023; the PB2025 book reported $53.4M as actual total obligation authority — $8.70M above the request. 53.4 − 44.7 = 8.7 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Multi-Mission Helicopter Upgrade Dev
This Program Element funds the development and improvement of MH-60R/S systems. The MH-60R provides persistent distributed, integrated, and maneuverable capabilities in the support of the Navy's Fleet Design and Distributed Maritime Operations concepts through its primary missions: Intelligence, Surveillance, Reconnaissance & Targeting (ISR&T), Antisubmarine Warfare, Surface Warfare (SUW), Electronic Warfare, Command and Control, and Non-Combat Operations. Secondary missions include: Amphibious Warfare, Air Warfare, Health Services, Fleet Support - Operations, Logistics, and Naval Special Warfare (NSW). Primary missions of the MH-60S include Combat Logistics, SUW, NSW, Combat Search and Rescue, and Airborne Mine Countermeasures. Additional missions include ISR&T, Search and Rescue, Humanitarian Assistance and Defense Support for Civil Authorities.
Mission — MH-60 Development
The MH-60R/S program pursues upgrades and enhancements that pace the rapidly evolving threat and improve safety-of-flight for its pilots and aircrew. These efforts include improvements to existing sensors, network capabilities, weapon systems, avionics, communications, and navigation systems as well as integration of modern precision guided air-to-ground missiles, fixed-forward and crew-served weapons, the Sensor Operator Console, and data-fusion capability. The program is also evaluating Diminishing Manufacturing Sources and Material Shortages (DMSMS) and making incremental improvements to various airframe, flight safety, and mission-planning systems. The program will continue development of architecture to support integration of secure, over-the-horizon communications in addition to modern en route navigation and terminal approach systems. MH-60R/S research and development initiatives include the evaluation and validation of the platform's cybersecurity posture and development of federated systems to rapidly field new capabilities. The MH-60R/S program is pursuing capability studies on open hardware and software architectures, avionics, mission systems, and air-vehicle performance. FY 2026 budget request funds the following: 1. System Configuration (SC) capability increases, Modernized Tactical Networks (to include Enhanced Throughput (ET) and Tactical Targeting Network Technology (TTNT) (i.e. mesh networks)), Radar Hardware and Software enhancements in support of Minotaur Family of Systems (MFoS), and Air Vehicle, Mission Systems and Avionics DMSMS solutions, to include MH-60 Displays, Embedded Global Positioning System (GPS)/Inertial Navigation System (INS) (EGI), Radar technical refresh, and Advanced Flight Control Computer (AFCC) obsolescence redesign. 2. Integration of Link 16 Advanced Capabilities, Multi-Functional Information Distribution System (MIDS) Joint Tactical Radio Systems (JTRS) Concurrent Multi Network (CMN)-4, and Tactical Networks (i.e. mesh network) to enable over-the-horizon targeting, enhance target sorting, and serve as a force multiplier in network enabled and long range maritime targeting weapon engagements. 3. DMSMS engineering, replacement part development, and qualification testing for known and forecasted Avionics (Displays), Mission Systems (sensors, i.e. passive detection/modern Radar Warning Receiver (RWR), Air Vehicle systems (AFCC), survivability and other obsolete parts. These DMSMS solutions will provide considerations for cost reduction and improvement in reliability and performance. The obsolescence solutions will align with the Future Capabilities Roadmap to minimize duplication and align the mid-life block upgrade configuration changes with the needed solutions. 4. Radar Hardware and Software refreshment will enable the MH-60R to input into MFoS capabilities. Integrated third-party applications will provide enhanced Battlespace Awareness and enriched over-the-horizon targeting support through improved national and tactical sensor integration via common data exchanges through enhanced Tactical Networks in support of Distributed Maritime Operations concepts. 5. Developmental activities including capability studies, interoperability studies, and open hardware and software architectures definition in support of MH-60 mid-life block upgrades. 6. Continued development and integration of the MH-60 Collaborative Mission Planning Continuum (CMPC). 7. Continued development of federated systems that address the rapidly evolving threat environment.
Mission — Congressional Adds
FY 2025 Congressional Capability Upgrade funding of $5.000 million will fund the development, integration and testing of the proliferated Low Earth Orbit (pLEO) Skyhook System and the Kraken 18 Communication Pod as federated systems onto the MH-60.
Justification
Accomplishments & Planned Programs (1)
Avionics H/W and S/W Development
Development efforts support aircraft integration, problem investigation, lab management and upgrades, and repairs in support of the test program. Individual Avionics and Mission Systems hardware and software upgrades are integrated, tested and fielded as part of an overall MH-60 System Configuration (e.g. SC26, SC28, SC30, etc.). System Configuration fleet releases are planned for every two years to meet fleet requirements, add new capabilities, pace the threat, address obsolescence, and incorporate technology insertion. Avionics hardware and software development and integration efforts include: Pre-planned Product Improvements, new System Configurations, Radar enhancements, the integration of Tactical Data Network modernization efforts, to include enhancements of the network architecture to include MIDS JTRS CMN-4 and TTNT, integration of critical ASE upgrades, cyber evaluations/validations, DMSMS solutions (to include Air Vehicle Systems, Airborne Low Frequency Sonar (ALFS), AFCC, Mission Systems and Avionics with emphasis on displays, Radar upgrades in support of MFoS/Enhanced Data Correlation integration. Prototype efforts support developing carry on/carry off federated system solutions to rapidly address emergent threats.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $70.6M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $65.4M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $65.4M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $64.8M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $64.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.73B | $70.6M | $65.4M | $64.8M | $64.8M |
| 1707: MH-60 Development | $1.73B | $60.9M | $60.4M | $64.8M | $64.8M |
| 9999: Congressional Adds | $0 | $9.65M | $5.00M | $0 | $0 |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| NY-23 | $26.9M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| LOCKHEED MARTIN CORPORATION | N0001920F0358 | high |
| LOCKHEED MARTIN CORPORATION | N0001921F0426 | high |
| LOCKHEED MARTIN CORPORATION | N0001922F0996 | high |
| LOCKHEED MARTIN CORPORATION | N0001917F0538 | medium |
| LOCKHEED MARTIN CORPORATION | N0001917F2506 | medium |
| LOCKHEED MARTIN CORPORATION | N0001918F0311 | medium |
| LOCKHEED MARTIN CORPORATION | N0001918F0454 | medium |
| LOCKHEED MARTIN CORPORATION | N0001918F0546 | medium |
| LOCKHEED MARTIN CORPORATION | N0001918F2543 | medium |
| LOCKHEED MARTIN CORPORATION | N0001918F2583 | medium |
| LOCKHEED MARTIN CORPORATION | N0001918F2588 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Multi-Mission Helicopter Upgrade Development. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J355
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J304
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J334
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J344
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J356
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J369
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J344
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J335
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J334
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J337
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil