Printed from https://fiscalreceipts.com/program/0604212N/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Other Helo Development
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $2.60M
- FY26
- $987.0K
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $34.4M | $12.1M | $5.89M | $26.4M | $23.3M | $37.8M | $22.6M | $47.8M | $54.8M | $2.60M | ||
| Enacted | $11.1M | $6.27M | $26.8M | $23.6M | $38.8M | $23.1M | $49.3M | $66.0M | $2.60M | – | ||
| Request | $6.27M | $26.8M | $32.1M | $28.8M | $18.1M | $56.4M | $66.0M | $2.60M | – | $987.0K |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2023 book requested $66.0M for FY2023; the PB2025 book reports $54.8M actually spent — $11.2M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Other Helicopter Development
This Program Element includes funding for the development support for improvements to current systems for CH/MH-53. The H-53 is the premier heavy lift helicopter for the Marine Corps and the only operational airborne mine sweeping platform for the Navy. H-53 RDT&E efforts focus on trade studies and risk reduction measures to identify candidate survivability, safety, avionics, cargo handling, cockpit and other airframe specific improvements to extend the service life.
Mission — CH/MH-53
The H-53 helicopter is the premier heavy lift helicopter for the Marine Corps and the only operational airborne mine sweeping platform for the Navy. H-53 efforts will continue to develop and qualify components, prior to production and approval decisions, in order to replace obsolete system components. Emphasis will be placed on safety/readiness/supportability improvement modifications that will sustain the H-53 aircraft until the transition of the H-53K is complete. These efforts combined, will significantly improve the readiness of the H-53 fleet while reducing long term operational and supportability costs. Survivability efforts to address improved situational awareness to pilots. Modeling and simulation will be used to the maximum practical extent throughout this effort. Manned Flight Simulator will be utilized to develop, install and test interim modifications, while maintaining the original basic system footprint and functionality. As a part of this effort, a complete Electro Magnetic Vulnerability assessment will be required for the affected and/or modified systems.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $2.60M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $987.0K |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $987.0K |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| 1109: CH/MH-53 | $116.9M | $2.60M | $0 | $987.0K | $987.0K |
| Program Element | $116.9M | $2.60M | $0 | $987.0K | $987.0K |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →