Hypersonics

ArmyRDT&EReconciledPE0604182A
What it is
Hypersonics (0604182A) is an Army research & development line funded in the Research, Development, Test and Evaluation, Army account. Its J-book detail breaks the line into 4 projects.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No single contractor is published as this line's leader. 2 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$201.2MR-1 TOA · PB2026
FY25 Enacted
Not in the FY2026 J-books we ingested
FY26 Request
$25.0MR-1 TOA · PB2026
FY25→26 Change
No comparison: endpoints unavailable or on different bases
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 2 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 2 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $201.2MFY26: $25.0MFY24FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$201.2M
FY26$25.0M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

9 fiscal years of this program as published (FY2018–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
9 fiscal years of this program as published (FY2018–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2026 request — PB2026 editionFY18FY19FY20FY21FY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$394.6M$841.7M$305.4M$309.1M$201.2M
Enacted–$0$404.0M$832.2M$315.1M$238.2M$43.4M–
Request––$228.0M$801.4M$300.9M$173.2M$43.4M–$25.0M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2020 book requested $228.0M for FY2020; the PB2022 book reported $394.6M as actual total obligation authority — $166.6M above the request. 394.6 − 228.0 = 166.6 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Hypersonics

The work in this Program Element (PE) supports the research, development, prototype, test and evaluation of technology to rapidly and efficiently procure, transition, and/or field critical enabling technologies and capabilities that address near-term and mid-term threats and is directly aligned to the Army Long Range Precision Fires modernization priority. PE 0604182A Hypersonics funded the development and prototype fielding of a Long Range Hypersonic Weapon to suppress adversary Long Range Fires and engage other high payoff/time critical targets. This effort encompassed the growth, testing and transition of Long Range Fires technologies. Additionally, the Army will leverage advancements in technology, materials, and cost-effective production methods to provide superior capabilities through fast, iterative design cycles, flexible hardware development, and modern manufacturing practices. The work in this Program Element (PE) now supports development, system flight tests, software validation, and full integration into the High Mobility Artillery Rocket System (HIMARS) platform, which will significantly expand HIMARS lethality. The $25.0 million requested in FY26 will fund continued prototype refinement, system flight testing, and key components for HIMARS integration, including the launcher pod and fire control system interface. Key milestones in FY26 include a Flight Termination System Trade Study (Q1) and an MVP Flight Test (Q4) demonstrating integration compatibility.

Mission — All Up Round and Canister (AUR+C)

The mission of Blackbeard Ground Launch (GL) is to attack/neutralize/suppress/destroy using hypersonic missile delivered precision fires (seeker based) against time sensitive moving targets and hardened targets at a much-reduced cost per missile than currently exists in the Army inventory. Blackbeard Ground Launch (GL) is an affordable, mass-produced hypersonic weapon designed for mid-range precision. The Army will leverage advancements in technology, materials, and cost-effective production methods to provide superior capabilities through fast, iterative design cycles, flexible hardware development, and modern manufacturing practices. Blackbeard GL will offer a complementary but enhanced survivable hypersonic precision strike capability, utilizing existing Army launcher platforms. Blackbeard GL is not a replacement to the Long Range Hypersonic Weapons (LRHW) as it will not reach similar velocities nor range. The goal of Blackbeard GL is to deliver approximately 80% of the Precision Strike Missile (PrSM) Increment 4 capability at a significantly reduced cost. Key features include integration into modified Multiple Launch Rocket Systems Family of Munitions (MFOM) pods and enhanced target discrimination capabilities. Funding will support development, system flight tests, software validation, and full integration into the High Mobility Artillery Rocket System (HIMARS) platform, which will expand HIMARS lethality. Blackbeard GL is a companion development to the Army's Common Autonomous Multi-Domain Launcher (CAML) effort which holds the potential to replace the base HIMARS launcher platform amongst other launchers. While envisioned as a primary munition for CAML, Blackbeard GL is designed to be compatible with existing HIMARS platforms as an interim solution.

Mission — Common Hypersonic Glide Body (CHGB)

Funds the effort to field an experimental prototype Hypersonic Weapon System with residual combat capability at the Battery Level as part of the Long Range Fires Battalion in support of Multi-domain Operations by the end of FY 2023. Initial fielding of all ground support equipment and training canisters, less live rounds, was completed in FY 2021. The Long Range Hypersonic Weapon (LRHW) system will provide the Army a prototype strategic attack weapon system to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working closely with the Navy in the development of the LRHW. Common with the Navy, the LRHW system includes a Common Hypersonic Glide Body (CHGB) and common 34.5 inch booster. Additionally, the LRHW will use an existing Command and Control (C2) Network, the Advanced Field Artillery Tactical Data System (AFATDS).

Mission — Ground Support Equipment (GSE)

Funds the effort to field an experimental prototype Hypersonic Weapon System with residual combat capability at the Battery Level as part of the Long Range Fires Battalion in support of Multi-domain Operations by the end of FY 2023. Initial fielding of all ground support equipment and training canisters, less live rounds, was completed in FY 2021. The Long Range Hypersonic Weapon (LRHW) system will provide the Army a prototype strategic attack weapon system to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working closely with the Navy in the development of the LRHW. Common with the Navy, the LRHW system includes a Common Hypersonic Glide Body (CHGB) and common 34.5 inch booster. Additionally, the LRHW will use an existing Command and Control (C2) Network, the Advanced Field Artillery Tactical Data System (AFATDS).

Mission — Test and Evaluation

Funds the effort to field an experimental prototype Hypersonic Weapon System with residual combat capability at the Battery Level as part of the Long Range Fires Battalion in support of Multi-domain Operations by the end of FY 2023. Initial fielding of all ground support equipment and training canisters, less live rounds, was completed in FY 2021. The Long Range Hypersonic Weapon (LRHW) system will provide the Army a prototype strategic attack weapon system to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working closely with the Navy in the development of the LRHW. Common with the Navy, the LRHW system includes a Common Hypersonic Glide Body (CHGB) and common 34.5 inch booster. Additionally, the LRHW will use an existing Command and Control (C2) Network, the Advanced Field Artillery Tactical Data System (AFATDS).

Justification

Accomplishments & Planned Programs (4)

HIMARS Extended Range Demo (HERD)

The work in this Program Element (PE) and Project supports development, system flight tests, software validation, and full integration into the High Mobility Artillery Rocket System (HIMARS) platform, expanding HIMARS lethality.

Ground Support Equipment (GSE)

This funding is provided for planning, manufacturing and integration efforts for the Battery Operations Center (BOC), Transporter Erector Launcher (TEL), the Fielding and Transition efforts as well as the overall Systems Integration with the All Up Round and Canister (AUR+C) for the LRHW program.

SBIR/STTR Transfer

Funding transferred in accordance with Title 15 USC §638.

Flight Test Planning and Execution

Plan and execute LRHW test events.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$201.2M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$25.0M
Research, Development, Test and Evaluation, ArmyAFY26 Total$25.0M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY26 BaseFY26 Request
Program Element$201.2M$25.0M$25.0M
HX3: All Up Round and Canister (AUR+C)$118.7M$25.0M$25.0M
HX4: Common Hypersonic Glide Body (CHGB)$12.5M——
HX5: Ground Support Equipment (GSE)$34.3M——
HX6: Test and Evaluation$35.6M——

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
DYNETICS, INC.W31P4Q25C0003medium
LOCKHEED MARTIN CORPORATIONW31P4Q23C0008medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Hypersonics. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.