Skip to content
Fiscal Receipts

NC3 Advanced Concepts

FRDT&EPartial Reconciliation0604001F
What it is
NC3 Advanced Concepts — a research & development program run by Air Force.
What changed
+$10.5M FY25→26
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$5.27M
FY25 Total
$5.45M
FY26 Request
$15.9M
FY25→26 Change
$10.5M

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $5.27MFY25: $5.45MFY26: $15.9MFY24FY25FY26
FY24
$5.27M
FY25
$5.45M
FY26
$15.9M
Decade view — each figure cites its own President's Budget edition
FY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY20FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$6.90M$5.10M$5.27M
Enacted$0$6.90M$5.10M$10.0M$5.45M
Request$6.90M$5.10M$10.0M$10.1M$15.9M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $10.0M for FY2024; the PB2026 book reports $5.27M actually spent — $4.74M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission NC3 Advanced Concepts

Nuclear Command, Control, and Communications (NC3) Advanced Concepts are required for analysis, development and prototyping of next generation NC3 systems and subsystems. This program ensures a responsive design and development engineering infrastructure to address evolving Nuclear Deterrence Operations (NDO) mission requirements; emerging issues and technology insertion/technology application on the NC3 Weapon System (WS), future strategic systems/capability, and other common strategic areas where appropriate; and develop enhanced multi-use capabilities. The NC3 Advanced Concepts Program will provide technology maturation and risk reduction activities to support the AF NC3 Weapon System (AN/USQ-225). Activity will reduce life cycle costs, inform technology maturation & risk reduction efforts, improve system performance, mitigate evolving threats, and ensure both viability and durability of the AF NC3 Weapon System. Additional details can be provided at a higher classification. The FY 2026 request was reduced by [0.060] million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative.” This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY 2024 $0.000M was expended for civilian pay expenses in this program element, and in FY 2025 $0.000M is forecasted for civilian pay expenses in this program element. This effort is in Budget Activity 4, Advanced Component Development and Prototypes (ACD&P), because efforts are necessary to evaluate integrated technologies, representative modes or prototype systems in a high fidelity and realistic operating environment.

Justification

Accomplishments & Planned Programs (1)

NC3 Advanced Concepts

NC3 Advanced Concepts activities will include, but are not limited to: conducting studies, analysis, and prototyping; test bed activities; exercise participation; developing modeling and simulation of identified NC3 WS architecture; integrated NC3 WS testing, validation, and certification; and direct mission support contracts in support of next generation NC3 systems and sub-systems. NC3 Advanced Concepts ensures a responsive design and development engineering infrastructure to address evolving NDO.

Budget Line Items(workbook-cited)

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY24 Actuals$5.27M
Research, Development, Test and Evaluation, Air ForceFFY25 Enacted$5.45M
Research, Development, Test and Evaluation, Air ForceFFY25 Total$5.45M
Research, Development, Test and Evaluation, Air ForceFFY26 Disc. Request$15.9M
Research, Development, Test and Evaluation, Air ForceFFY26 Total$15.9M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$5.27M$5.45M$15.9M$15.9M
646020: NC3 Advanced Concepts$0$5.27M$5.45M$15.9M$15.9M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →