Printed from https://fiscalreceipts.com/program/0603804A/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Logistics and Engineer Equipment - Adv Dev
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $22.8M |
| FY25 | $20.0M |
| FY26 | $15.4M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $13.2M | $20.3M | $17.4M | $29.6M | $18.8M | $7.08M | $15.3M | $10.8M | $24.3M | $22.8M | ||
| Enacted | $21.2M | $20.8M | $35.3M | $17.2M | $7.34M | $8.59M | $11.1M | $24.6M | $7.60M | $20.0M | ||
| Request | $20.8M | $35.3M | $14.2M | $7.34M | $4.76M | $7.05M | $9.64M | $7.60M | $12.4M | $15.4M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $7.60M for FY2024; the PB2026 book reported $22.8M as actual total obligation authority — $15.2M above the request. 22.8 − 7.6 = 15.2 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Logistics and Engineer Equipment - Adv Dev
This Program Element (PE) supports advanced component development and prototypes of new and improved technologies for combat support and combat service support equipment essential to sustaining combat operations. Advancements in bridging, armored engineer vehicles to include development of a robotic capability Remote Control System for the Assault Breacher Vehicle, electric power generators, material-handling, environmental control, shelter systems, cargo aerial delivery, field service systems, mortuary affairs equipment and petroleum equipment are necessary to improve safety and increase the tactical mobility, operational capability, lethality and survivability on the digital battlefield and to provide for greater sustainment while reducing the logistics support burden. Army Watercraft funding supports initiatives to enhance the seaworthiness, safety, survivability, supportability, energy efficiency, environmental, bulk fuel, water generation, regulatory compliance and reliability of existing systems. FY 2026 Base dollars in the amount of $9.942 million supports Assault Breacher Vehicle Remote Control System (ABV RCS) which adds remote control capability to the ABV, allowing Soldiers to conduct minefield breaching operations remotely, removing Soldiers from the breach where 50% casualty rates are expected. FY 2026 Base dollars support engineering and logistics development, developmental testing and program support. FY 2026 RDTE dollars in the amount of $2.716 million supports modernization of the current Army Watercraft fleet by investigating technology insertions, including, but not limited to: force protection, prognostics & preventative maintenance, vessel electronics, autonomous operations and other emerging technologies. Funding also supports developing initial prototypes to enable refinement of operational requirements and early user feedback to support future sustainment and operational movement operating concepts. All Army Watercraft modernization efforts will incorporate Predictive Logistics which includes digital updates across commercial solutions which will improve readiness, predictive maintenance, unplanned emergency repairs. FY 2026 RDTE dollars in the amount of $2.777 million supports technology maturation efforts for advanced power technology (i.e, energy storage and power conversion) through Universal Power Gateway (UPG) development. The FY 2026 request was reduced by $0.2 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $0.067 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."
Mission — Marine Orien Log Eq Ad
This project supports current Army Watercraft Systems (AWS) that provide the Combatant, Multi-Domain Operations (MDO) and Joint All Domain Operations (JADO) Commanders with an organic waterborne lift capability to enable Dynamic Force Repositioning (DFR) in support of unified land operations. AWS provides the waterborne transportation capability to deliver combat-configured equipment with personnel, vehicles and sustainment cargo (Bulk Water and Fuel), through fixed, degraded and austere ports, inland waterways, remote and unimproved beaches and coastlines for missions across the spectrum of military operations. AWS bridges the gap between strategic sealift and sustains lethality in littoral areas or where mature ports and road networks are unavailable. Watercrafts are a key enabler to Army and Joint force in support of Title 10 and DODD missions of providing logistics to joint operations and campaigns, including DODD missions of providing logistics to joint operations and campaigns, including joint logistics over-the-shore and intra-theater transport of time sensitive, mission-critical personnel and equipment, and in support of amphibious and riverine operations (DODD 5100.01). This Army Watercraft funding supports initiatives to enhance the seaworthiness, safety, and survivability while increasing the lethality, tactical mobility, and operational capability of the Army Mariner to preserve the Combatant Commanders requirement of "freedom of seas" access in all areas of the world particularly the littorals, to support maneuver operations in all Areas of Responsibility. All modification and services efforts are critical enablers for the success Army's Watercraft Systems Transformation Strategy (AWSTS) and continued fulfillment of the AWS Title 10 mission. Funded engineering efforts will address critical gaps in these areas for the current AWS for regaining capability, while at the same time researching, developing and testing emergent technologies. To support future acquisitions and future fleet planning, funding efforts will include conducting trade studies, Business Case Analyses to inform the requirement development process, and support Analysis of Alternatives (AoA). The funding enables Army's compliance with the National Defense Authorization Act of 1996 and 502(6) of the Clean Water Act and compliance with Environmental protection Agency (EPA) emission standards. FY 2026 RDTE dollars in the amount of $2.716 million supports modernization of the current Army Watercraft fleet by investigating technology insertions, including, but not limited to: force protection, prognostics & preventative maintenance, vessel electronics, autonomous operations and other emerging technologies. Funding also supports developing initial prototypes to enable refinement of operational requirements and early user feedback to support future sustainment and operational movement operating concepts. All Army Watercraft modernization efforts will incorporate Predictive Logistics which includes digital updates across commercial solutions which will improve readiness, predictive maintenance, unplanned emergency repairs.
Mission — Armored Engineer Vehicles
This project supports the prototype development, test and evaluation of a robotic capability Remote Control System (RCS) for the Assault Breacher Vehicle (ABV), to include prototype fabrication, developmental testing and logistics development / user test events. Funding supports modernization of Army Bridging and Armored Engineer Vehicle fleets by investigating technology insertions including, but not limited to condition-based maintenance, increased military load capacities, autonomous operations and other emerging technologies. Funding also supports developing initial prototypes and testing to enable refinement of Operational Requirements and early user feedback to support future sustainment and operational movement operating concepts. FY 2026 Base dollars in the amount of $9.942 million supports Assault Breacher Vehicle Remote Control System (ABV RCS) which adds remote control capability to the ABV, allowing Soldiers to conduct minefield breaching operations remotely, removing Soldiers from the breach where 50% casualty rates are expected. FY 2026 Base dollars support engineering and logistics development, developmental testing and program support.
Mission — Adv Elec Energy Con Ad
As the DoD's Lead Standardization Activity for Tactical Electric Power (TEP), Project Manager Expeditionary Energy & Sustainment Systems (PM E2S2) matures and integrates technology that will improve the next generation of standard tactical power sources in support of all Services. It supports technical maturation of TEP systems that will extend Army operational mission reach and duration in support of the Army Operating Concept and Multi-Domain Battle. Funding supports modernization of the current Tactical Electric Power capability with technology insertions including, but not limited to advanced power technology capabilities through the Universal Power Gateway (UPG) system, light-weight power solutions, vehicle/tactical microgrid interoperability and Tactical Microgrid Standard (TMS). Funding also supports developing initial prototypes to enable refinement of Operational Requirements and early user feedback to support future sustainment an operational energy concepts. This project is a Congressional Interest Item. Congressionally provided funds will support analysis and planning for potential transition to the Army of the mobile micro-reactor prototype and capability. FY26 RDTE dollars in the amount of $2.777 million supports Advanced Power Technology for the Universal Power Gateway (UPG) requirement.
Justification
Accomplishments & Planned Programs (9)
Environmental Compliance Projects (UNDs)
Environmental projects enable compliance with requirements as defined under in the law Uniform National Discharge Standards (UNDS) and Environmental Protection Agency (EPA) emissions standards. The EPA reviews the UNDS Code of Federal Regulations (CFR) language in five-year increments separated into three batches (types of discharge). This is an ongoing assessment of statutory language which may or may not result in material solution change.
Force Protection Capability
Army Watercraft Systems (AWS) Force Protection capability is limited to defensive measures. Current efforts include development of gunner station and weapon station locations, integration of Common Remotely Weapon Station (CROWS) and non-lethal Escalation of Force (EoF). The EoF capability includes white light, an acoustic hailing device, and Forward Looking Infra-Red (FLIR) cameras.
Army Watercraft Program Support
Army Watercraft Program Support includes Program Management and System Engineering matrix salaries and in-house contractor salaries, travel, and other support costs required to effectively manage the AWS projects and provide contractor oversight. It also includes benefits, personnel training, and other Government costs required to retain a professional acquisition workforce.
Trade Studies and Business Analysis
Conduct Affordability and Feasibility Studies for concept development for future vessel platforms.
Predictive Logistics
As Army Watercraft are equipped with subsystems that allow for sharing of digital information it is a natural evolution to incorporate Predictive Logistics which includes digital updates across commercial solutions which will improve readiness, improve maintainability with predictive maintenance, and timely repair of unplanned emergency repairs.
Test Support
Supports in house and external performance tests of concept hardware. In addition, supports evaluation of subsystems and components for Army Watercraft Systems Current Fleet.
Advanced Power Technology for the Universal Power Gateway (UPG) requirement
Required technology maturation for advanced power technologies to develop Universal Power Gateway (UPG) components. Supports mitigation of the Sustainment Gap for Power Storage and Distribution by maturing technology. Enables more efficient use of all potential power and energy sources on the battlefield, enhances Soldier survivability through signature reduction and dispersion, and reduces logistics resupply requirements.
TMS compliant AMMPS Digital Control System Phase 1
This effort will make a commercial generator, offered by Cummins, compliant to the Tactical Microgrid Standard (TMS), which will pave the way to the next offering of the Advance Medium Mobile Power Source (AMMPS) to be TMS compliant. This effort will develop a Microgrid Controller to control the commercial generators and future TMS-compliant AMMPS. This effort will also develop a Microgrid Dashboard to increase situational awareness of power system performance.
Cyber Tactical Microgrid Standard
The Tactical Microgrid Standard (TMS), MIL-STD-3071, enables power component interoperability to create plug and play tactical microgrids that enable operational flexibility. A cyber security implementation within the TMS will harden power component communication against malicious actors, further allowing wide-spread use of the standard. Updated tools and training will help proliferate the standard.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY24 Actuals | $22.8M |
| Research, Development, Test and Evaluation, Army | A | FY25 Enacted | $20.0M |
| Research, Development, Test and Evaluation, Army | A | FY25 Total | $20.0M |
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $15.4M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $15.4M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $22.8M | $20.0M | $15.4M | $15.4M |
| 526: Marine Orien Log Eq Ad | $2.35M | $2.37M | $2.72M | $2.72M |
| EW8: Armored Engineer Vehicles | $4.98M | $7.62M | $9.94M | $9.94M |
| G11: Adv Elec Energy Con Ad | $15.5M | $10.0M | $2.78M | $2.78M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Logistics and Engineer Equipment - Adv Dev. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J73
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J67
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J68
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J69
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J87
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J93
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J63
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J64
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J64
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J64
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTE - Vol 2 - Budget Activity 4A · www.asafm.army.mil
PDF page 265