Printed from https://fiscalreceipts.com/program/0603795N/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Land Attack Technology
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $12.6M |
| FY25 | $1.69M |
| FY26 | $1.06M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $310.0K | $887.0K | $17.3M | $16.7M | $6.92M | $7.04M | $5.73M | $3.92M | $352.0K | $12.6M | ||
| Enacted | $887.0K | $6.01M | $35.7M | $7.10M | $7.33M | $7.25M | $4.02M | $358.0K | $1.62M | $1.69M | ||
| Request | $6.01M | $33.6M | $16.9M | $10.5M | $12.0M | $4.02M | $358.0K | $1.62M | $1.69M | $1.06M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2018 book requested $33.6M for FY2018; the PB2020 book reported $16.7M as actual total obligation authority — $16.9M below the request. 16.7 − 33.6 = -16.9 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Land Attack Tech
Project 2038: The 25mm MK 38 MOD 2 and MOD 3 Machine Gun Systems (MGS) provide Anti-Surface Warfare (ASUW) and Anti-terrorism and Force Protection (AT/FP) capability as a simple, stabilized, low cost solution to outfit near-term deployers to counter small boat threats. Over 360 U.S. Navy-owned systems are installed on U.S. Navy AS, CG, CVN, DDG, LCC, LHA, LHD, LSD, OSV, PC class ships, MK VI Patrol Boats and U.S. Coast Guard Fast Response Cutters. Established in order to respond to Joint Urgent Operational Need Statement (JUONS) CC-0558 for Counter Unmanned Aerial Systems (C-UAS), the MK 38 MOD 3 MGS's electro-optical/infra-red sensor, hardware, and software are being upgraded to counter emerging unmanned aerial threats. Initial C-UAS capability was fielded in Q1FY 2020. Incremental improvements are being made to this C-UAS capability, for cybersecurity and to address operability issues. The 30mm MK 38 MOD 4 Gun Weapon System, will introduce greater accuracy, lethality, and effective range for C-UAS and Counter Unmanned Surface Vehicle (C-USV) capability with integration to highly accurate fire control system, 30mm gun, targeting sensor and AEGIS combat system. The MOD 4 will be fielded on all DDG 51 Flight IIA and Flight III AEGIS Destroyers. Project 2038 provides qualification and logistics development of the 30mm MK 38 MOD 4. This will include Function Integration Testing, Functional Acceptance Testing, AEGIS Light-off, Structural Test Firing, and an at-sea Quick Reaction Assessment (on board DDG 89). Upgrading fielded 25mm MK 38 MGS to MOD 3 with C-UAS and concurrently developing and fielding the MK 38 MOD 4 Gun Weapon System (GWS) on all current and future DDG 51 Flight IIA and Flight III Destroyers is the fastest and most cost-effective way to field critical C-UAS ship self-defense capability. MK45 C-UAS MK160/MK20 development to utilize a Hypervelocity Projectile (HVP) munition that was developed for the Army and that capability is being developed to operate within a Naval environment using existing systems. The capability includes developing a low-cost C-UAS solution into the five-inch MK 34-gun weapon system on DDGs. This effort includes development of the fire control software, development of a datalink from the ship, hardware in the loop simulation, system integration testing, and at sea live fire testing. FY2024 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101).
Mission — ADVANCED MINOR CALIBER GUN
Project 2038: The 25mm MK 38 MOD 2 and MOD 3 Machine Gun Systems (MGS) provide Anti-Surface Warfare (ASUW) and Anti-terrorism and Force Protection (AT/FP) capability as a simple, stabilized, low-cost solution to outfit near-term deployers to counter small boat threats. Over 360 U.S. Navy-owned systems are installed on U.S. Navy AS, CG, CVN, DDG, LCC, LHA, LHD, LSD, OSV, PC class ships, MK VI Patrol Boats and U.S. Coast Guard Fast Response Cutters. Established in order to respond to Joint Urgent Operational Need Statement (JUONS) CC-0558 for Counter Unmanned Aerial Systems (C-UAS), the MK 38 MOD 3 MGS's electro-optical/infra-red sensor, hardware, and software are being upgraded to counter emerging unmanned aerial threats. Initial C-UAS capability was fielded in Q1FY 2020. Incremental improvements are being made to this C-UAS capability, for cybersecurity and to address operability issues. The 30mm MK 38 MOD 4 Gun Weapon System, will introduce greater accuracy, lethality, and effective range for C-UAS and Counter Unmanned Surface Vehicle (C-USV) capability with integration to highly accurate fire control system, 30mm gun, targeting sensor and AEGIS combat system. The MOD 4 will be fielded on all DDG 51 Flight IIA and Flight III AEGIS Destroyers. Project 2038 provides qualification and logistics development of the 30mm MK 38 MOD 4. This will include Function Integration Testing, Functional Acceptance Testing, AEGIS Light-off, Structural Test Firing, and an at-sea Quick Reaction Assessment (on board DDG 89). Upgrading fielded 25mm MK 38 MGS to MOD 3 with C-UAS and concurrently developing and fielding the MK 38 MOD 4 Gun Weapon System (GWS) on all current and future DDG 51 Flight IIA and Flight III Destroyers is the fastest and most cost-effective way to field critical C-UAS ship self-defense capability. MK45 C-UAS MK160/MK20 development to utilize a Hypervelocity Projectile (HVP) munition that was developed for the Army and that capability is being developed to operate within a Naval environment using existing systems. The capability includes developing a low-cost C-UAS solution into the five-inch MK 34-gun weapon system on DDGs. This effort includes development of the fire control software, development of a datalink from the ship, hardware in the loop simulation, system integration testing, and at sea live fire testing. FY2024 CENTCOM Operations Transfer, Israel Security Supplemental (P.L. 118-50, Division A., Sec. 101).
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $12.6M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $1.69M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $1.69M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $1.06M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $1.06M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $33.9M | $12.6M | $1.69M | $1.06M | $1.06M |
| 2038: ADVANCED MINOR CALIBER GUN | $33.9M | $12.6M | $1.69M | $1.06M | $1.06M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Land Attack Technology. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J312
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J282
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J309
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J310
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J324
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J338
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J309
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J299
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J297
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J298
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil