Facilities Improvement

NavyRDT&EReconciledPE0603725N
What it is
Facilities Improvement (0603725N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 4 projects.
What changed
+$1.86M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$11.9MR-1 TOA · PB2026
FY25 Total
$9.07MR-1 TOA · PB2026
FY26 Request
$10.9MR-1 TOA · PB2026
FY25→26 Change
+$1.86MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $11.9MFY25: $9.07MFY26: $10.9MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$11.9M
FY25$9.07M
FY26$10.9M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$2.59M$3.73M$4.21M$2.79M$5.18M$3.61M$4.53M$6.31M$5.60M$11.9M
Enacted$3.73M$5.46M$2.84M$5.30M$3.44M$4.64M$6.33M$5.66M$10.1M$9.07M
Request$5.46M$2.84M$5.30M$3.44M$4.66M$6.33M$5.66M$10.1M$9.07M$10.9M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $10.1M for FY2024; the PB2026 book reported $11.9M as actual total obligation authority — $1.80M above the request. 11.9 − 10.1 = 1.8 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Facilities Improvement

This program provides capabilities to: a) overcome performance limitations and reduce the life cycle cost of shore facilities and, b) provide protection against terrorist attacks for shore installations and their operations. The program focuses on technical and operational issues of specific Navy interest, where there are no unbiased test validated Commercial Off the Shelf (COTS) solutions available, and where timely capabilities may not materialize without specific demonstration or validation by the Navy. Additionally, the program completes the development of technologies originating from Navy, DOD and other sources of Science and Technology programs, including the National Science Foundation (NSF), the National Institute of Standards and Technology (NIST) and Department of Energy (DOE). Validated technologies are implemented in the Navy's Military Construction (MILCON) and Facilities, Sustainment Restoration and Modernization (FSRM) program, and Antiterrorism and Force Protection (ATFP) Other Procurement, Navy (OPN) program. Naval Facilities System Project 0995 addresses Facilities Sustainment, Restoration and Modernization for reducing the total ownership cost (TOC) of future and existing Facilities and addressing natural and catastrophic risk of critical Naval Waterfront Facilities. Facilities Related Controls Systems (FRCS) Cybersecurity RDTEN Project 3018 funds the Cyber Vulnerability Assessments and Evaluations program of critical shore infrastructure. Funding will be used for prioritized critical shore infrastructure. Funded vulnerability assessments will build upon existing mission assurance, blue team, and red team capabilities and will utilize DoE and DoD national laboratory partnerships. Assessments will end with the submission of a final report to Congress detailing strategies and procedures for mitigating the risk of cyber vulnerabilities and should be identified during the course of evaluation vulnerability. Force Protection Ashore Project 3155 addresses selective topics in modeling, and material technologies to reduce the vulnerability of installations; and reduce the acquisition and operating costs of protective technologies. The demonstrations and validations provide the independent, technical and operational test data for the development of competitive performance specifications to acquire the required capabilities. This project is coordinated with other DOD programs.

Mission — Naval Facilities System

Project 0995 addresses research, development, testing and evaluation of technologies related to 1) waterfront facilities (such as dry docks, piers, etc.) 2)Facilities sustainment, restoration and modernization (such as runways, magazines, etc.) to include the performance of alternative materials, and surfacing concepts and methods, and corrosion technologies to improve performance and reduce lifecycle cost. Waterfront facilities, repair, upgrade and service life extension: Improved availability and adaptability of our installations enables readiness and fleet lethality. Research focus areas include: 1) Design and analysis to adapt to extreme weather risks at Naval Facilities, especially nuclear capable waterfront facilities. 2) New design, retrofit and material methods to extend service life and/or improve capability. Approximately 75% of the Navy's waterfront facilities are over 45 years old, designed for a service life of 25 years, and need to support different, larger platforms. Critical Facilities Sustainment, Restoration and Modernization (SRM): Technologies that improve capability and/or reduce the cost of SRM for critical facilities (such as runways, magazines, etc.) including material reduction, strength increase, corrosion reduction, etc. The Navy's portion of corrosion deficiencies at DoD shore facilities is estimated to be $433M (DOD Annual Cost of Corrosion for the Department of Defense Facilities and Infrastructure July 2010).

Mission — Facilities Related Controls Systems (FRCS) Cybersecurity RDTE

The Cyber Vulnerability Assessments and Evaluations program funds cyber vulnerability assessments of critical shore infrastructure. Funding will be used for assessments of prioritized critical shore infrastructure and will build upon existing mission assurance, blue team, and red team capabilities. As instructed by the Congressional language, the assessments will utilize DoE and DoD national laboratory partnerships. Assessments will end with the submission of a final report to Congress. Strategies and procedures for mitigating the risk of cyber vulnerabilities should be identified during the course of evaluation vulnerability.

Mission — Force Protection Ashore

In accordance with Navy Shore Strategic Guidance 2024-2029 Protection of Navy installations against evolving threats in a peer competition environment requires deployment of advanced technology for force protection capabilities. This Force Protection ashore project will develop, demonstrate and validate technologies for the following: access control and integrated perimeter security surveillance sensors and intelligent electronic security systems for automated counter intrusion detection (Installation Protection); perimeter security; waterside protection against craft and swimmer intrusion; secure and efficient operations centers and emergency management centers including human and information support systems (Command and Control).Programs currently being evaluated are, standard-based enterprise physical security system integration and automation; Command, Control, and Communications (C3) capabilities for emergency operations; integrated and networked mass notification systems (MNS); Waterside intelligent video security systems; integrated over-the-water sensors and analytics for automated course of action planning; identifying and interdicting malevolent threats - watercraft, swimmers, divers, and unmanned underwater vessels (UUVs) to reduce injury and death to the warfighter and damage to high value units (HVUs)(Waterside Protection). Through demonstration and validation of risk modeling and simulation models, the potential of emerging technologies will be evaluated and installation security strategies that reduce manpower and other costs will be formulated. Multiple systems with sensors and cameras are being deployed on Navy installations to be used for threat assessment. These systems are not integrated and there is not a centralized location or system that all the data can be analyzed. The Installation Defense Operations Center aggregates all these sensor feeds into one location and the Sensor Management System (SMS) software provides an integrated picture so that an intelligent assessment can be made. Current Force Protection systems to be integrated include Airfield Enclave Electronic Security Systems (AE-ESS), Blue Robotic and Autonomous Systems (RAS), Counter Unmanned Systems (C-UxS) (Air, land, sea) and the Electronic Harbor Security System and leverages personnel specifically trained to operate in in the RAS environment. These demonstrations and validations derive advanced technology from science and technology programs of government academia and industry. The technology evaluation and validation produces data for performance specifications used for competitive procurement. Utilizing agile management methods, each FY intentionally develops in sequence to iteratively advance the IDOC, C-UxS and Blue Robotics into operational environments. Testing in operational environments enables the Navy shore to gather valuable feedback and make necessary adjustments. All work will be coordinated with other programs and through industry forums as appropriate.

Mission — Congressional Adds

C999: Groundwater storage analysis

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$11.9M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$9.07M
Research, Development, Test and Evaluation, NavyNFY25 Total$9.07M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$10.9M
Research, Development, Test and Evaluation, NavyNFY26 Total$10.9M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$41.1M$11.9M$9.07M$10.9M$10.9M
0995: Naval Facilities System$23.4M$2.16M$2.53M$2.42M$2.42M
3018: Facilities Related Controls Systems (FRCS) Cybersecurity RDTE$7.28M$6.37M$5.05M$6.49M$6.49M
3155: Force Protection Ashore$10.4M$1.49M$1.48M$2.02M$2.02M
9999: Congressional Adds$0$1.93M$0$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

13 mentions from the Senate LDA disclosure database.

AECOMFacilities|Improvement2025matched 2+ title words

Issues Related to US Air Force Facilities Construction

ROLLS-ROYCE NORTH AMERICA AND ITS AFFILIATESFacilities|Improvement2025matched 2+ title words

Issues related to Rolls-Royce North America U.S. facilities and footprint (no bill).

LOCKHEED MARTIN CORPORATIONFacilities|Improvement2024matched 2+ title words

S 1939 - FAA Reauthorization Act of 2024 including issues related to reauthorizing the Federal Aviation Administration…

LOCKHEED MARTIN CORPORATIONFacilities|Improvement2024matched 2+ title words

S 1939/HR 3935 - FAA Reauthorization Act of 2024 including issues related to reauthorizing the Federal Aviation…

PHILLIPS 66Facilities|Improvement2024matched 2+ title words

H.R. 4470, Protecting and Security Chemical Facilities from Terrorist Attacks Act of 2023; S. 2178, Protecting and…

PHILLIPS 66Facilities|Improvement2024matched 2+ title words

H.R. 4470, Protecting and Security Chemical Facilities from Terrorist Attacks Act of 2023; S. 2178, Protecting and…

PHILLIPS 66Facilities|Improvement2024matched 2+ title words

H.R. 4470, Protecting and Security Chemical Facilities from Terrorist Attacks Act of 2023; S. 2178, Protecting and…

PHILLIPS 66Facilities|Improvement2024matched 2+ title words

H.R. 4470, Protecting and Security Chemical Facilities from Terrorist Attacks Act of 2023; S. 2178, Protecting and…

ROLLS-ROYCE NORTH AMERICA AND ITS AFFILIATESFacilities|Improvement2024matched 2+ title words

Issues related to Rolls-Royce North America U.S. facilities and footprint (no bill).

ROLLS-ROYCE NORTH AMERICA AND ITS AFFILIATESFacilities|Improvement2024matched 2+ title words

Issues related to Rolls-Royce North America U.S. facilities and footprint (no bill).

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSFacilities|Improvement2024matched 2+ title words

Inflation Reduction Act (H.R.5376) implementation, Protecting the Right to Organize (PRO) Act, Secure And Fair…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSFacilities|Improvement2024matched 2+ title words

Inflation Reduction Act (H.R.5376) implementation, Protecting the Right to Organize (PRO) Act, Secure And Fair…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSFacilities|Improvement2024matched 2+ title words

Inflation Reduction Act (H.R.5376) implementation, Protecting the Right to Organize (PRO) Act, Secure And Fair…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Facilities Improvement. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.