Printed from https://fiscalreceipts.com/program/0603619A/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Landmine Warfare and Barrier - Adv Dev
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $60.2M |
| FY25 | $60.6M |
| FY26 | $41.5M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $40.9M | $65.1M | $69.2M | $40.3M | $79.5M | $56.1M | $44.9M | $59.9M | $60.2M | ||
| Enacted | $45.8M | $72.1M | $72.9M | $45.2M | $82.9M | $56.1M | $46.6M | $62.0M | $47.5M | $60.6M | ||
| Request | $72.1M | $72.9M | $45.3M | $92.9M | $64.1M | $50.3M | $64.0M | $47.5M | $58.6M | $41.5M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2020 book requested $92.9M for FY2020; the PB2022 book reported $79.5M as actual total obligation authority — $13.4M below the request. 79.5 − 92.9 = -13.4 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Landmine Warfare and Barrier - Adv Dev
Projects CE5 - The current mounted breaching system, the M58 Mine Clearing Line Charge (MICLIC), is a rocket-projected explosive line charge that was initially fielded over 50 years ago and is becoming increasingly less effective against modernized threat obstacles which does not support Multi-Domain Operations (MDO). This effort will focus on the development of the XM123 Ground Obstacle Breaching Lane Neutralizer (GOBLN) system, an MDO-capable modular mission payload which will provide greater effectiveness against current and emerging threat obstacles and enhanced operational reliability, supportability, mobility and survivability beyond the current state. The Program will collaborate with Transformation In Contact (TIC) units to further mature breaching technologies. The target platforms for GOBLN is the ground robotic vehicle to support the Combat Engineer mission and any future emerging requirements. GOBLN has been endorsed by the Next Generation Combat Vehicle (NGCV) Cross Functional Team (CFT) and will have the ability to integrate with current and future platforms. The modularity also allows for integration with other current and future platforms. The FY 2026 request supports continued Technology Maturation and Risk Reduction (TMRR) and a soldier touchpoint that will include a Technology Readiness Level (TRL) 6 prototype demonstration. Project EK7 Area Denial Capability Development provides for the advanced capability development of Terrain Shaping systems and develops modernized, non-persistent U.S. Anti-personnel landmine policy compliant munition fields. During joint, multi-domain, high intensity conflicts, Terrain Shaping systems disrupt, fix, turn and block enemy freedom of maneuver while enhancing friendly freedom of maneuver within the same battle space. Terrain Shaping systems enable maneuver commanders to directly influence where battlefield engagements occur. Terrain Shaping systems will replace a portion of the Family of Scatterable Mines (FASCAM) systems which are beyond their designed life. The project will develop Terrain Shaping prototype systems to evaluate and integrate emerging technologies in collaboration with Transformation in Contact (TIC) units to further mature terrain shaping technologies in real time to drive innovation, enhance learning, refine requirements and accelerate solution development. Terrain Shaping systems will use an open system and modular architecture to facilitate future development, maintenance, repair, and product improvements to include emerging requirements such as the ground robotic vehicle to support the Combat Engineer mission. XM204 Interim Top Attack program, the first Terrain Shaping capability insertion, has entered into production with Initial Operational Capability (IOC) projected for 1QFY26 to meet United States Army Europe (USAREUR) Operational Needs (ONS) #18-22702. The Army is developing an enduring solution to fill the directed obstacle capability gap. FY 2026 budget supports the research and development of the Terrain Shaping systems to include development of a complex obstacle employing a modernized, semiautonomous/autonomous bottom attack capability. Terrain Shaping systems will include complementary lethal capability and advanced network integration to provide a complex Terrain Shaping capability that complies with U.S. Anti-Personnel Landmine Policy and provides the commander greater speed and flexibility to transition between offensive and defensive operations. The enduring Terrain Shaping capability development supports the approved Terrain Shaping Abbreviated-Capability Development Document (A-CDD) and Army Futures Command (AFC) Terrain Shaping Strategy for Land Domain and Multi-Domain Operations (MDO). The FY 2026 request was reduced by $1.107 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Mission — Breaching Capability Development - Mounted
The current mounted breaching system, the M58 Mine Clearing Line Charge (MICLIC), is a rocket-projected explosive line charge that was initially fielded over 50 years ago and is becoming increasingly less effective against modernized threat obstacles which does not support Multi-Domain Operations (MDO). This effort will focus on the development of the XM123 Ground Obstacle Breaching Lane Neutralizer (GOBLN) system, an MDO-capable modular mission payload which will provide greater effectiveness against current and emerging threat obstacles and enhanced operational reliability, supportability, mobility and survivability beyond the current state. The Program will collaborate with Transformation In Contact (TIC) units to further mature breaching technologies. The target platform for GOBLN is the ground robotic vehicle to support the Combat Engineer mission and any future emerging requirements. GOBLN has been endorsed by the Next Generation Combat Vehicle (NGCV) Cross Functional Team (CFT) and will have the ability to integrate with current and future platforms. The modularity also allows for integration with other current and future platforms. The FY 2026 request supports continued Technology Maturation and Risk Reduction (TMRR) and a soldier touchpoint that will include a Technology Readiness Level (TRL) 6 prototype demonstration.
Mission — Area Denial Capability Development
Project EK7 Area Denial Capability Development provides for the advanced capability development of Terrain Shaping systems and develops modernized, non-persistent U.S. Anti-personnel landmine policy compliant munition fields. During joint, multi-domain, high intensity conflicts, Terrain Shaping systems disrupt, fix, turn and block enemy freedom of maneuver while enhancing friendly freedom of maneuver within the same battle space. Terrain Shaping systems enable maneuver commanders to directly influence where battlefield engagements occur. Terrain Shaping systems will replace a portion of the Family of Scatterable Mines (FASCAM) systems which are beyond their designed life. The project will develop Terrain Shaping prototype systems to evaluate and integrate emerging technologies in collaboration with Transformation in Contact (TIC) units to further mature terrain shaping technologies in real time to drive innovation, enhance learning, refine requirements and accelerate solution development. Terrain Shaping systems will use an open system and modular architecture to facilitate future development, maintenance, repair, and product improvements to include emerging requirements such as the ground robotic vehicle to support the Combat Engineer mission. XM204 Interim Top Attack program, the first Terrain Shaping capability insertion, has entered into production with Initial Operational Capability (IOC) projected for 1QFY26 to meet United States Army Europe (USAREUR) Operational Needs (ONS) #18-22702. The Army is developing an enduring solution to fill the directed obstacle capability gap. FY 2026 budget supports the research and development of the Terrain Shaping systems to include development of a complex obstacle employing a modernized, semiautonomous/autonomous bottom attack capability. Terrain Shaping systems will include complementary lethal capability and advanced network integration to provide a complex Terrain Shaping capability that complies with U.S. Anti-Personnel Landmine Policy and provides the commander greater speed and flexibility to transition between offensive and defensive operations. The enduring Terrain Shaping capability development supports the approved Terrain Shaping Abbreviated-Capability Development Document (A-CDD) and Army Futures Command (AFC) Terrain Shaping Strategy for Land Domain and Multi-Domain Operations (MDO).
Justification
Accomplishments & Planned Programs (4)
XM123 Ground Obstacle Breaching Lane Neutralizer (GOBLN)
Develop the Next Generation Mounted Breaching capability to engage near-peer current and emerging threat obstacles.
Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR)
Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR)
Terrain Shaping Capability
Develop, build, and demonstrate the Terrain Shaping solution common munition system to support the approved Terrain Shaping Abbreviated-Capability Development Document (A-CDD) and Army Futures Command (AFC) Terrain Shaping Strategy for Land Domain and Multi-Domain Operations (MDO).
XM250 Terrain Shaping Obstacles Capability Development
Develop, build, and demonstrate the XM250 Terrain Shaping common munition system. Demonstrate system in an operationally relevant environment.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY24 Actuals | $60.2M |
| Research, Development, Test and Evaluation, Army | A | FY25 Enacted | $60.6M |
| Research, Development, Test and Evaluation, Army | A | FY25 Total | $60.6M |
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $41.5M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $41.5M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $60.2M | $60.6M | $41.5M | $41.5M |
| CE5: Breaching Capability Development - Mounted | $6.87M | $9.83M | $12.6M | $12.6M |
| EK7: Area Denial Capability Development | $53.3M | $50.8M | $28.9M | $28.9M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Landmine Warfare and Barrier - Adv Dev. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J64
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J58
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J58
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J59
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J77
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J83
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J54
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J55
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J55
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J55
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTE - Vol 2 - Budget Activity 4A · www.asafm.army.mil
PDF page 62