ATRT Enterprise Rapid Capability (0603598N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 2 projects.
What changed
-$33.3M FY25→26 R-1 TOA · PB2026
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$86.8MR-1 TOA · PB2026
FY25 Total
$53.3MR-1 TOA · PB2026
FY26 Request
$20.0MR-1 TOA · PB2026
FY25→26 Change
-$33.3MR-1 TOA · PB2026

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order so the direction of travel is readable at a glance: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order so the direction of travel is readable at a glance: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $86.8MFY25: $53.3MFY26: $20.0MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$86.8M
FY25$53.3M
FY26$20.0M

All series figures: R-1 TOA · PB2026

Decade view — P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
3 fiscal years of this program as published (FY2024–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.
3 fiscal years of this program as published (FY2024–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.FY2024 actuals — PB2026 editionFY2025 enacted — PB2026 editionFY2026 request — PB2026 editionFY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY24FY25FY26
Actuals$86.8M
Enacted$53.3M
Request$20.0M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission (U)ATRT ENTERPRISE RAPID DEVELOPMENT

Automated Test and ReTest (ATRT) Enterprise Rapid Capability develops, integrates, and deploys novel capabilities aggregated from mature technologies in support of Distributed Maritime Operations. These capabilities are enabled through the use of virtualized systems of systems, automated test and analysis, automated certification, rapid interface development, and field with and data collection and edge analytics. These technologies are at the heart of the Navy's rapid capability approach, which combines digital engineering tools with evolutionary approaches to requirements generation, operational testing, and deployment. This process will meet Fleet demands for near-term capability in a predictable and repeatable fashion.

Mission Congressional Adds

Automated Test and ReTest (ATRT) Enterprise Rapid Capability develops, integrates, and deploys novel capabilities aggregated from mature technologies in support of Distributed Maritime Operations. These capabilities are enabled through the use of virtualized systems of systems, automated test and analysis, automated certification, rapid interface development, and field with and data collection and edge analytics.. These technologies are at the heart of the Navy's rapid capability approach, which combines digital engineering tools with evolutionary approaches to requirements generation, operational testing, and deployment. This process will meet Fleet demands for near-term capability in a predictable and repeatable fashion.

Mission Automated Test and Analysis

Automated Test and ReTest (ATRT) Enterprise Rapid Capability develops, integrates, and deploys novel capabilities aggregated from mature technologies in support of Distributed Maritime Operations. These capabilities are enabled through the use of virtualized systems of systems, automated test and analysis, automated certification, rapid interface development, and field with and data collection and edge analytics.. These technologies are at the heart of the Navy's rapid capability approach, which combines digital engineering tools with evolutionary approaches to requirements generation, operational testing, and deployment. This process will meet Fleet demands for near-term capability in a predictable and repeatable fashion.

Justification

Accomplishments & Planned Programs (1)

Automated Test and ReTest (ATRT)

Automated Test and ReTest (ATRT) Enterprise Rapid Capability develops, integrates, and deploys novel capabilities aggregated from mature technologies in support of Distributed Maritime Operations. These capabilities are enabled through the use of virtualized systems of systems, automated test and analysis, automated certification, rapid interface development, and field with and data collection and edge analytics.. These technologies are at the heart of the Navy's rapid capability approach, which combines digital engineering tools with evolutionary approaches to requirements generation, operational testing, and deployment. This process will meet Fleet demands for near-term capability in a predictable and repeatable fashion. Project 9B88 Automated Test and Analysis is an effort shared between the NAVSEA PE 0603598N and NAVWAR PE 0603597N. This effort is an increase to continue NAVSEA efforts previously funded by NAVWAR. Funding is required to test and analysis for Hard/Soft Kill as well as Long Range Fires capability improvements.

Budget Line Items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$86.8M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$53.3M
Research, Development, Test and Evaluation, NavyNFY25 Total$53.3M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$20.0M
Research, Development, Test and Evaluation, NavyNFY26 Total$20.0M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget Figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$86.8M$53.3M$20.0M$20.0M
9999: Congressional Adds$0$86.8M$53.3M$0$0
9B88: Automated Test and Analysis$0$0$0$20.0M$20.0M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1,741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not ATRT Enterprise Rapid Capability — no program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

No research dossier for this program — dossiers cover 50 of 1,741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →