LCS Mission Modules (0603596N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 3 projects.
What changed
+$10.5M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 3 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$31.2MR-1 TOA · PB2026
FY25 Total
$28.8MR-1 TOA · PB2026
FY26 Request
$39.3MR-1 TOA · PB2026
FY25→26 Change
+$10.5MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $31.2MFY25: $28.8MFY26: $39.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$31.2M
FY25$28.8M
FY26$39.3M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$172.6M$188.9M$153.6M$100.5M$99.7M$105.4M$75.9M$75.2M$31.2M$31.2M
Enacted$203.1M$160.1M$116.9M$103.6M$108.5M$77.6M$76.0M$31.7M$31.5M$28.8M
Request$160.1M$116.9M$103.6M$108.5M$67.9M$76.0M$41.5M$31.5M$28.8M$39.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2018 book requested $116.9M for FY2018; the PB2020 book reported $100.5M as actual total obligation authority — $16.4M below the request. 100.5 − 116.9 = -16.4 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — LCS Mission Modules

The Littoral Combat Ship (LCS) Mission Modules (MM) Program Element (PE) provides funds for detailed design, development, issue resolution, certification, integration, and testing of the LCS MM. LCS is a fast, agile, and networked surface combatant with capabilities optimized to defeat asymmetric threats and ensure naval and joint force access into contested littoral regions. It uses open-systems architecture design, modular weapons, sensor systems, and a variety of manned and unmanned vehicles to expand the battle space and project offensive power into the littorals. The LCS MM Program employs an incremental development approach to deliver capability, which allows for insertion of mature capabilities throughout the life of the program without the need for modifications to the seaframes. Future capabilities will be considered when joint warfighting objectives or changing threats create new operational capability requirements that cannot be met by current mission package designs, or when new technological opportunities allow significant progress toward delivering cost effective, enhanced capabilities. Future mission module increments can be tested, constructed, and incorporated into existing mission packages, which is one of the most important benefits of LCS modular design. Mission Package funding is aligned into three (3) projects: 2550 Mine Countermeasures (MCM) Mission Package 2552 Surface Warfare (SUW) Mission Package 3129 LCS Mission Package Development MCM MP: Counters bottom, tethered, near surface, and surface mines in the littorals without putting sailors in the minefield. In FY25, the MCM MP will deploy to C5F, update and deliver various tactical and logistic documentation, commence development of MCM MPAS 4.0 software, modify the MCM MP to commence integration of Barracuda, development of the Near Surface Neutralization Module (NSN), and TBEC design upgrades and achieve Ready for Training (RFT). SUW MP: Increases firepower and offensive/defensive capabilities against large numbers of highly maneuverable, fast, small craft threats, giving LCS the ability to protect the sea lanes while moving a force quickly through a choke point or other strategic waterway, and to conduct maritime security missions. In FY24, the SUW MP will complete the efforts to revise the SSMM hatch and cover design. ASW MP: Enables the LCS to conduct detect-to-engage operations against modern submarines. In FY23, the ASW Mission Package was divested from the LCS Mission Modules program. C5I: Enabling products required by all MPs such as common hardware interfaces, computer operating environment (Mission Package Computing Environment (MPCE)), communications systems (Multi-Vehicle Communications System (MVCS)), aviation interface systems, UxV interfaces and Mission Package Portable Control Stations (MPPCS). MPCE provides common services and an Operating Environment to support all Mission Package Application Software (MPAS) and Open Architecture Products. MVCS enables the simultaneous control and data exchange between unmanned mission vehicles and the ship. Aviation interface systems include integration and management of data communications, data processing, and physical hardware interfaces such as common equipment and containers used by all mission packages. MPPCS provides a mobile operating environment installed in a 20ft ISO container and serves as a surrogate ship during mission package development and integration test events at test ranges. In FY24, project 3129 (LCS Mission Package Common Development) efforts include continuing MPCE v2.0 tech refresh development and initiation of MVCS v2.X tech refresh development.

Mission — Mine Countermeasure (MCM) Mission Package

The MCM Mission Package (MP) employs an incremental development approach to deliver capability which allows the continued insertion of mature capabilities throughout the life of the program without the need for modifications to the seaframes. The focus is to minimize service life extensions to both MCM-1 ships and the MH-53E helicopters. Future MCM MP capabilities will be considered when joint warfighting objectives or changing threats create new operational capability requirements that cannot be met by current mission package designs, or when new technological opportunities allow significant progress toward delivering cost effective enhanced capabilities. Future mission module increments can be tested, constructed, and incorporated into existing mission packages, one of the most important benefits of LCS modular design. MCM MP successfully completed IOT&E in Q4FY22 and achieved Initial Operational Capability (IOC) on 31MAR 2023. MCM MPs have begun to be fielded Q3FY24 and deployed in Q2FY25. The program has begun investigation into the feasibility of integrating the MCM MP on Vessels of Opportunity (VOO). In FY19 and FY20, the program demonstrated the flexibility of the modular MCM MP components by conducting a MCM Vessel of Opportunity (VOO) at-sea demonstration onboard the USS Hershel "Woody" Williams (T-ESB 4). The MCM MP will counter deep, shallow, and tethered mines in the littorals without putting sailors in the minefield. When the MCM MP is embarked, LCS is capable of conducting detect-to-engage operations (hunting, sweeping, and neutralization) against very shallow to deep-water sea mine threats and detect mines in the Beach Zone. The MCM MP provides these capabilities through the use of sensors and weapons deployed from an MH-60S multi-mission helicopter, unmanned offboard vehicles, and support equipment/containers. The MCM MP consists of the following modules: - Unmanned Minesweeping (UMS) Module: Unmanned Influence Sweeping System (UISS) (USV + Minesweeping Payload Delivery System (PDS)) - Airborne Mine Neutralization (AMN) Module: Airborne Mine Neutralization System (AMNS) + MH-60S helicopter - Near Surface Detection (NSD) Module: Airborne Laser Mine Detection System (ALMDS) + MH-60S helicopter - Coastal Mine Reconnaissance (CMR) Module: Coastal Battlefield Reconnaissance & Analysis (COBRA) + MQ-8 Fire Scout Vertical Take-off and Landing Tactical Unmanned Aerial Vehicle (VTUAV) - Remote Minehunting (RMH) Module: Unmanned Surface Vehicle (USV) + Minehunting PDS + AN/AQS-20 Minehunting Sonar - Near-surface Mine Neutralization (NSN) Module: Barracuda (Barracuda Neutralizer + USV + Mine Neutralization PDS)

Mission — Surface Warfare (SUW) Mission Package

The SUW MP increases firepower and offensive/defensive capabilities against large numbers of highly maneuverable, fast, small craft threats, giving LCS the ability to protect the sea lanes and move a force quickly through a choke point or other strategic waterway. The SUW MP is composed of several mission modules including the Gun Mission Module (GMM), the Aviation Module, the Maritime Security Module (MSM), and the Surface-to-Surface Missile Module (SSMM). The GMM is composed of two high velocity 30mm cannons which is augmented by the ship's resident 57mm gun to counter close in to mid-range threats. The Aviation Module uses the embarked MH-60R helicopter with Hellfire missile and the MQ-8B Fire Scout VTUAV for the detection, identification, and classification of surface contacts and to engage long range threats. The MSM supports the embarkation of a Visit, Board, Search, and Seizure (VBSS) team. The SSMM is a self-contained module consisting of 2 Missile Exhaust Containment Structures (MECS), integrated articulating hatch covers, a fire control system, and 12 two-rail MK 210 launchers to support load out and firing of 24 Longbow Hellfire missiles. SSMM provides missile coverage for mid-range threats and small boats.

Mission — LCS Mission Package Development

The LCS Mission Modules Common Equipment consists of the development and integration of vital C5I products required by all Mission Packages to provide common hardware interfaces, computer operating environment, communications systems, aviation interface systems, UxV interfaces and portable development & integration test-sets. Common hardware interfaces include definition, installation, and control of mechanical, electrical, and cooling requirements common to all mission packages. The Mission Package Computing Environment (MPCE) provides common services and Operating Environment to support all Mission Package Application Software (MPAS) and Open Architecture Products. The Multi-Vehicle Communications System (MVCS) enables the control and data exchange of simultaneous unmanned mission vehicles and the ship. Aviation interface systems include integration and management of data communications, data processing, and physical hardware interfaces such as common equipment and containers used by all mission packages. Development and integration test-sets provide a mobile operating environment installed in the Mission Package Portable Control Stations (MPPCSs) to serve as a surrogate ship during mission package development and integration test events at test ranges.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$31.2M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$28.8M
Research, Development, Test and Evaluation, NavyNFY25 Total$28.8M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$39.3M
Research, Development, Test and Evaluation, NavyNFY26 Total$39.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$883.6M$31.2M$28.8M$39.3M$39.3M
2550: Mine Countermeasure (MCM) Mission Package$175.2M$16.9M$15.2M$23.7M$23.7M
2552: Surface Warfare (SUW) Mission Package$38.7M$848.0K$0$0$0
3129: LCS Mission Package Development$669.7M$13.5M$13.6M$15.6M$15.6M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
FUTURE TECHNOLOGIES, INC.N0017820F3013medium
NORTHROP GRUMMAN SYSTEMS CORPORATIONN0002415C6311medium
NORTHROP GRUMMAN SYSTEMS CORPORATIONN0002417C6311medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not LCS Mission Modules. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.