NRDT&EPartial Reconciliation0603595N
What it is
Ohio Replacement — a research & development program run by Navy.
What changed
+$80.6M FY25→26
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$274.3M
FY25 Total
$192.6M
FY26 Request
$273.3M
FY25→26 Change
$80.6M

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $274.3MFY25: $192.6MFY26: $273.3MFY24FY25FY26
FY24
$274.3M
FY25
$192.6M
FY26
$273.3M
Decade view — each figure cites its own President's Budget edition
FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$833.3M$947.8M$681.2M$775.6M$528.1M$411.4M$308.4M$302.0M$334.3M$274.3M
Enacted$971.4M$700.8M$776.2M$542.8M$427.1M$316.4M$311.2M$345.0M$257.1M$192.6M
Request$700.8M$776.2M$514.8M$419.1M$317.2M$296.2M$336.0M$257.1M$189.6M$273.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2017 book requested $700.8M for FY2017; the PB2019 book reports $681.2M actually spent — $19.6M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission COLUMBIA Class Submarine Development

The COLUMBIA Submarine Class Program (previously the OHIO Replacement Class) is developing the next generation sea-based strategic deterrent. The funding applies to the design, systems engineering, prototyping, and vendor qualification activities needed to execute the schedule for Common Missile Compartment (CMC) design, whole ship design, and component technologies development for the next generation U.S. ballistic missile submarine (SSBN). This RDT&E program supports cooperation with the United Kingdom (UK) to maintain strategic deterrence, based on a single effort to develop a CMC as agreed by the UK Secretary of State for Defense and the U.S. Secretary of Defense in 2009. At the COLUMBIA Program Semi-Annual Interim Progress Review (IPR) held on August 30, 2021, the USD(A&S) Milestone Decision Authority (MDA) directed COLUMBIA to be funded to the program baseline, including Integrated Enterprise Plan (IEP) funding as reflected in this budget submission. The COLUMBIA program strategy is to leverage the re-use of existing Submarine system designs (as applicable), focus on lifecycle Total Ownership Cost (TOC) affordability, and meet the military requirements established for this SSBN to achieve mission success in a challenging environment. The requested funding levels provide for the Technology Development, Design, Engineering, and Integration efforts necessary to support the COLUMBIA Class SSBN lead ship construction along with continued development and design support for construction of the class. A Contract Modification for ongoing design/advance construction efforts was awarded on 22 Jun 2020, which also included the Build I Option for the First Two Ships. This was a Pre-Priced Option for the two ships, SSBN 826 and SSBN 827, and associated design/support efforts. This was a modification of the current Integrated Product & Process Development (IPPD) contract (N00024-17-C-2117) and is in line with the program's approved Acquisition Strategy. The program requested authorization of SSBN 826 in FY21, funded with three years of incremental funding in FY21-23, and is requesting authorization of SSBN 827 in FY24, funded with two years of incremental funding in FY24-25. The RDT&E efforts support this plan. The following key activities support the COLUMBIA Class SSBN Program: 1. Design and development of a missile compartment, launch system, and Strategic Weapons Support Systems (SWSS) to meet U.S. strategic requirements while cooperating with the UK on modernizing its strategic deterrent in accordance with Presidential direction (December 2006). 2. Concept Definition, System Definition, and Detailed Design for remaining portions of the ship accomplished through a Design/Build/Sustain approach modeled after the approach used by the VIRGINIA Class program. 3. Engineering and integration of existing technologies and development of new technologies required to provide the capabilities necessary to ensure platform operational effectiveness and minimize life cycle cost. 4. Ongoing design support for construction of the submarine class. COLUMBIA Class SSBN concept study, system definition prototyping, and technology development efforts support design, systems engineering, component development and vendor qualification activities needed to develop the CMC design and the COLUMBIA whole ship design. The COLUMBIA design timelines are based on a design approach proven on the VIRGINIA Class Program, adjusted for the additional complexity of a missile compartment and Strategic Weapons Systems (SWS). Planned technical studies and prototyping are necessary to reduce risks associated with updating SSBN system designs for current technical standards and demonstrating design feasibility of developmental technology to meet the ship design and construction schedule. The Navy continues to invest in program funded affordability initiatives similar to those employed successfully for VIRGINIA Class but tailored to the unique SSBN mission and operational tempo of COLUMBIA Class to drive down overall program costs. Efforts focus on reducing ship construction costs through implementing more effective design features and fabrication and assembly methods for a more affordable submarine. As part of this effort, alternative procurement and contracting strategies are also being utilized to include Multi-Program Material Procurement (MPMP) and Economic Order Quantity (EOQ). Activities were executed for the first article quad pack (FAQP) prototype of the CMC to support the UK DREADNOUGHT Program and COLUMBIA Program, and to continue validation of the Integrated Tube and Hull (ITH) build strategy. These activities included the continuation of the construction of the FAQP, which began August 2016, and completed in October 2019. This FAQP was determined to not be useable based on defective missile tubes and was cut apart to recover the missile tubes to use later in the program. The CMC program will mature required technologies and re-host the TRIDENT II D5 SWS (Launcher, Fire Control and Navigation) while ensuring no degradation to D5 security, safety, and performance. In addition, whole ship design efforts are focused on technologies requiring significant engineering, integration, and development time as well as those technologies that are required to support ship design and construction schedules such as the propulsor and maneuvering/ship control. These technologies are critical for stealth capability for a ship class that will be in service until the 2080s. Ship detailed design efforts include important activities such as finalizing ship arrangements, development of design disclosures to support build products, risk characterization, and mitigation, improvement and validation of performance prediction tools and improvement of design tools. Technology development addresses engineering and integration of existing technologies as well as maturation of developmental technologies.

Mission SBSD Obsolescence

This project provides the engineering development and program management effort required to sustain Non-Propulsion Electronic Systems (NPES) outfitting of each ship of the COLUMBIA Class throughout the duration of the 12-ship construction program. Non-recurring engineering activity is required to ensure specification compliant components are available for procurement as fleet common sub-systems, which evolve over the life of the program due to either competitive selection of new suppliers, component obsolescence replacement, increased technical performance, or improvements in reliability. Non-recurring engineering activity is needed to perform platform integration of the components, and software modification to accommodate electronic data exchange, COLUMBIA unique submarine environment qualification, and update of all logistics products.

Mission SSBN New Design

This program element supports innovative research and development in submarine Hull, Mechanical and Electrical (HM&E) and combat systems technologies and the subsequent evaluation, demonstration, and validation for submarine platforms over the life cycle of the COLUMBIA Class. It will increase the submarine technology base and provide subsystem design options not currently feasible. The program element also supports programs transitioning from Science and Technology (S&T), Defense Advanced Research Projects Agency (DARPA), Independent Research and Development, and Small Business Innovation Research (SBIR) projects. The funding applies to the design, systems engineering, prototyping, and vendor qualification activities needed to execute the schedule for Common Missile Compartment (CMC) design, whole ship design, and component technologies development for the next generation U.S. ballistic missile submarine (SSBN), the COLUMBIA Class. Project Unit 3220: The objective of the COLUMBIA Class Submarine Development is to design, prepare for, and support construction and delivery of the class that is the replacement of the OHIO Class SSBN. Project Unit 3440: This project provides the engineering development and program management required to outfit, upgrade, and support each ship of the COLUMBIA Class Submarine with a Non- Propulsion Electronics System (combat, sonar, etc.) that satisfies requirements to meet its sole mission of Strategic Deterrence over the class life cycle. Project Unit 3441: This project encompasses ship system development, coordination, and management efforts for the COLUMBIA Class Submarine Technology Insertion Program and Technology Refresh Program over the class life cycle. Project Unit 9999: This Congressional Add project funds efforts for COLUMBIA Advanced Composite Shaft Design and Shipyard and Ship Repair Workforce Training.

Mission SBSD Technology Refresh

This project encompasses ship system development, coordination, and management efforts for the COLUMBIA Class Submarine Technology Insertion Program and Technology Refresh Program over the life cycle. The purpose of the Technology Insertion Program is to efficiently upgrade performance of all hulls by virtue of improvements in HM&E ship systems. The purpose of the Technology Refresh Program is to develop, coordinate, and manage technical refresh plans for ship systems reliant on Commercial off the Shelf (COTS) technology that have short product life cycles to ensure materiel solutions for obsolescence issues. Additionally, this project will support mitigation of obsolescence issues for HM&E components that are not included in systems that have not historically had a formal Tech Refresh plan. Technology development implementation and logistics for developmental items, and COLUMBIA Class test & evaluation for these items are also included. Testing of components and systems will be used to inform performance predictions for later ships in the class and determine if design changes are needed. Technologies developed in this program will be considered for applicability to the VIRGINIA Program for commonality opportunities. The thrust of these efforts will be to maintain required technical performance and materiel readiness of COLUMBIA SSBNs in order to support the Sea Based Strategic Deterrence (SBSD) mission.

Mission Congressional Adds

Congressional Add supports the COLUMBIA Class Submarines advanced composite shaft design and shipyard and ship repair workforce training.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget Line Items(workbook-cited)

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$274.3M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$192.6M
Research, Development, Test and Evaluation, NavyNFY25 Total$192.6M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$273.3M
Research, Development, Test and Evaluation, NavyNFY26 Total$273.3M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
9999: Congressional Adds$0$24.1M$3.00M$0$0
3440: SBSD Obsolescence$19.7M$21.6M$21.4M$19.1M$19.1M
3441: SBSD Technology Refresh$45.3M$48.4M$49.9M$45.8M$45.8M
3220: COLUMBIA Class Submarine Development$4.31B$180.2M$118.3M$208.4M$208.4M
Program Element$4.38B$274.3M$192.6M$273.3M$273.3M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →