Aviation Survivability
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $20.5M |
| FY25 | $23.1M |
| FY26 | $24.1M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $4.28M | $5.34M | $14.8M | $5.45M | $7.62M | $11.7M | $13.2M | $24.3M | $17.3M | $20.5M | ||
| Enacted | $10.9M | $5.24M | $5.57M | $7.05M | $11.9M | $13.3M | $24.8M | $17.4M | $20.9M | $23.1M | ||
| Request | $5.24M | $5.57M | $7.05M | $11.9M | $13.4M | $16.8M | $17.4M | $20.9M | $23.1M | $24.1M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2017 book requested $5.24M for FY2017; the PB2019 book reported $14.8M as actual total obligation authority — $9.57M above the request. 14.8 − 5.2 = 9.6 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Aviation Survivability
Aviation Survivability addresses the issues of aircrew and platform survivability, focusing on enhancing overall opportunity for aircrew and platform protection and enhanced performance. The capabilities addressed under this program element counter emerging threats of next generation operational weapons systems and enhance combat effectiveness in future operational mission scenarios. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.
Mission — Acft Protective Clothing
Project 0584 develops, demonstrates, prototypes, and validates technologies designed to enhance warfighter performance, protection, injury prevention, mission effectiveness, sustainment, and survivability. The project addresses readiness, life support equipment, physiological episodes, hearing protection and communication intelligibility, day / night digital advanced helmet vision systems, laser eye protection and supporting technologies, escape and crashworthy systems, active/passive restraint systems; survival and evasion, aircrew/injury modeling, crew centered cockpit design control stations, and aircraft maintainer protection. Fully protected and mission ready Aircrew are a critical component of Ready Basic Aircraft and mission execution. Project 0584 responds to a number of operational requirements documents, including OR# 210-05-88 for Chemical and Biological protection, OR# 099-05-087 for Laser Eye Protection, Aircrew Laser Eye Protection (ALEP) joint operation requirements document JORD #513-88-99, and Capabilities Program Document (CPD) Night Vision Cueing and Display (NVCD).
Mission — Acft Survivability, Vulnerability & Safety
Aircraft Survivability, Vulnerability and Safety. This project evaluates and develops prototype hardware and software solutions to improve the survivability of Navy and Marine Corps aircraft. This project addresses the likelihood of an aircraft being hit (susceptibility) and the probability of a kill if the aircraft is hit (vulnerability). Types of programs funded under this project include signature reduction efforts, subsystem and component hardening and development of integrated Aviation Survivability Equipment (iASE) architectures for simulation and training systems. This project also provides an engineering level modeling and simulation capability to assess electronic warfare capabilities and to support future electronic warfare investment strategies. Further, this effort expands upon existing high fidelity Hardware In The Loop (HITL) capability and this expanded capability will enable the assessment of Electronic Warfare (EW) concepts versus future (i.e. not fully defined) threat systems. This project will include the development of new or modification of existing modules which are high fidelity representations of the EW and threat system's components and will support iASE hardware and software research and future technological survivability concepts as they become available.
Mission — Acft & Ordnance Safety
The Aircraft and Ordnance Safety Program transitions innovative munitions safety technology to Navy and Marine Corps air weapons, to comply with the Chief of Naval Operations direction that all munitions carried aboard Navy ships be insensitive to unplanned stimuli (thermal, impact, and shock events). The Aircraft and Ordnance Safety Program also ensures the safety and protection of personnel, aircraft, ships, and operational facilities, through improved precision targeting, fail-safe ordnance, selective effects munitions and shock/blast force protection technologies.
Mission — CV Acft Fire Suppress System
This project develops improved fire-fighting systems and fire protective measures for aircraft-related fires on aircraft carriers, including assessment of fire properties, definition of fire threats, improvements to fire-fighting agents and delivery systems, fire detection and suppression system performance evaluations, and fire-fighter training improvements.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $20.5M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $23.1M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $23.1M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $24.1M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $24.1M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $260.3M | $20.5M | $23.1M | $24.1M | $24.1M |
| 0584: Acft Protective Clothing | $132.5M | $11.3M | $13.7M | $15.2M | $15.2M |
| 0591: Acft Survivability, Vulnerability & Safety | $61.0M | $3.64M | $3.67M | $3.51M | $3.51M |
| 0592: Acft & Ordnance Safety | $59.6M | $4.97M | $5.07M | $4.78M | $4.78M |
| 1819: CV Acft Fire Suppress System | $7.19M | $624.0K | $638.0K | $622.0K | $622.0K |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Aviation Survivability. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J271
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J238
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J265
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J268
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J284
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J296
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J267
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J258
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J257
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J258
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil