Training System Aircraft
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $39.3M |
| FY25 | $26.1M |
| FY26 | $15.1M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $13.1M | $16.4M | $17.5M | $16.3M | $14.3M | $15.4M | $4.30M | $5.76M | $14.7M | $39.3M | ||
| Enacted | $18.0M | $19.9M | $16.9M | $12.8M | $15.5M | $4.31M | $5.86M | $15.1M | $44.1M | $26.1M | ||
| Request | $19.9M | $16.9M | $12.8M | $15.5M | $4.33M | $5.86M | $15.1M | $44.1M | $26.1M | $15.1M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $44.1M for FY2024; the PB2026 book reported $39.3M as actual total obligation authority — $4.84M below the request. 39.3 − 44.1 = -4.8 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Training System Aircraft
This program element provides for design, development, integration and test of various pre and post production platform improvements for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-57, TH-73A, T-54, and T-45 Follow-On: Undergraduate Jet Training System (UJTS). Continued development engineering for improvements in reliability, maintainability, and safety are required to ensure maximum benefit is achieved to provide effective cost of ownership and availability of aircraft to meet Chief of Naval Air Training (CNATRA) student training requirements. Specific efforts include: T-45, T-6, TH-57, T-44, T-54, and TH-73A Training System Improvements such as development and sustainment engineering change proposals (ECPs), avionics reliability and modernization, corrosion prevention ECPs, obsolescence ECPs, T-45 Retrofit Integration Testing (RIT), and new solutions required to meet evolving fleet training requirements; T-45 and T-6 Physiological Episode (PE) mitigation analysis; New Start T-6B Avionics Modernization; and T-45 Follow-On UJTS development. This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production decision.
Mission — Training Aircraft Updates
Training System Improvements: Funding provides for design, development, integration and test of various pre and post production platform improvements including Retrofit Integration Testing (RIT) for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-57, TH-73A, T-54, and T-45 Follow-On UJTS. T-45 Follow-On: Undergraduate Jet Training System (UJTS): The T-45 Training System consists of the T-45C aircraft, ground-based training devices, curricula, and associated equipment. The T-45 is facing significant aircraft, engine, and component obsolescence issues. These issues are projected to dramatically increase operating costs and aircraft availability by 2030. This research and development effort will investigate alternatives for replacing the T-45 training system and develop and validate the acquisition strategy for the procurement of a new platform for the UJTS. The T-45 Follow-On UJTS will ensure training commands continue to provide the fleet replacement squadrons with qualified and capable naval aviators. This effort includes, but is not limited to, market research, requirements and training curricula development, evaluation of acquisition strategies, evaluation of proposals, development and testing of new training technologies, and testing of aircraft, Ground Based Training System, and equipment prototypes. New Start T-6B Avionics Modernization: Funding provided for the research and development for T-6B avionics system upgrades required to meet future Chief of Naval Air Training (CNATRA) operational requirements by mitigating issues associated with obsolescence, safety, and operational limitations.
Mission — Physiological Episodes
T-45 and T-6 Physiological Episode (PE) Mitigation: Efforts will provide for studies and development efforts to address mitigation of the T-45 and T-6 physiological episodes.
Justification
Accomplishments & Planned Programs (5)
Training System Improvements
Funding provides for design, development, integration and test of various pre and post production platform improvements including Retrofit Integration Testing (RIT) for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-57, TH-73A, T-54, and T-45 Follow-On (UJTS).
T-6B Avionics Modernization
Funding provided for the research and development for avionics system upgrades required to meet future Chief of Naval Air Training (CNATRA) operational requirements by mitigating issues associated with obsolescence, safety, and operational limitations.
T-45 Follow-On: Undergraduate Jet Training System (UJTS)
Funding supports research and development for the UJTS program (T-45 Follow-On Undergraduate Jet Training System), to include development and validation of the acquisition strategy for future procurement of the capability, ensuring continuous support to fleet replacement squadrons with qualified and capable Naval Aviators. This effort includes, but is not limited to, market research, requirements and training curricula development, evaluation of acquisition strategies, evaluation of proposals, development and testing of new training technologies, and testing of aircraft, Ground Based Training System, and equipment prototypes.
T-45 Physiological Episode Mitigation
Funding provides for design, development, integration and test of platform improvements for Naval Aviation Physiological Episode (PE) Mitigation in the T-45 Training Aircraft.
T-6 Physiological Episode Mitigation
Funding provides for design, development, integration and test of platform improvements for Naval Aviation Physiological Episode (PE) Mitigation in the T-6 training aircraft.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $39.3M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $26.1M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $26.1M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $15.1M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $15.1M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $116.4M | $39.3M | $26.1M | $15.1M | $15.1M |
| 3367: Training Aircraft Updates | $113.2M | $38.3M | $25.1M | $14.3M | $14.3M |
| 9099: Physiological Episodes | $3.13M | $1.01M | $976.0K | $815.0K | $815.0K |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Training System Aircraft. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J349
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J300
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J330
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J339
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J351
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J365
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J340
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J330
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J328
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J331
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil