Defense Laboratories R&D Projects (10 U.S.C, Sec 2358)

Air ForceRDT&EReconciledPE0602212F
What it is
Defense Laboratories R&D Projects (10 U.S.C, Sec 2358) (0602212F) is an Air Force research & development line funded in the Research, Development, Test and Evaluation, Air Force account. Its J-book detail breaks the line into 1 project.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$111.7MR-1 TOA · PB2026
FY25 Enacted
$0J-book detail · PB2026
FY26 Request
$0J-book detail · PB2026
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2024. The PB2026 J-book detail below does carry an FY2026 row for this line, recorded as zero. A workbook blank and a documented zero are different records, and this page shows both. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $111.7MFY25: $0FY26: $0FY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$111.7MR-1 TOA · PB2026
FY25$0J-book detail · PB2026
FY26$0J-book detail · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

7 fiscal years of this program as published (FY2018–FY2024): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
7 fiscal years of this program as published (FY2018–FY2024): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY18FY19FY20FY21FY22FY23FY24

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY18FY19FY20FY21FY22FY23FY24
Actuals$74.8M$86.2M$100.5M$107.0M$98.9M$107.3M$111.7M
Enacted–$0$0$0$0$0–
Request––$0$0$0$0$0

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $0 for FY2024; the PB2026 book reported $111.7M as actual total obligation authority — $111.7M above the request. 111.7 − 0.0 = 111.7 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Defense Lab R&D Projects

Implementation of 10 U.S.C. Section 2363, amendment to PL 110-417, 10 U.S.C. Section 2358 and 10 U.S.C. 2805(d)(1)(B), to fund: innovative basic and applied research conducted at the defense laboratory and supports military missions; development programs supporting the transition of technologies developed by the defense laboratory into operational use; workforce development activities improving the capacity of the defense laboratory to recruit and retain personnel with necessary scientific and engineering expertise that support military missions; and the repair or minor military construction of the laboratory infrastructure and equipment. The Air Force is dependent on technological advances in response to emerging threats and to maintain a competitive advantage. Air Force has a comprehensive and deliberative planning process to identify and fund research that is expected to have the greatest benefit to the Air Force and the warfighter. 10 U.S.C. Section 2363 provides the Commander of the Air Force Research Laboratory (AFRL), in consultation with the Air Force Science and Technology (S&T) Executive, a degree of flexibility to rapidly exploit scientific breakthroughs or respond to emerging threats, to include developing a skilled workforce and necessary infrastructure. This flexibility increases the rate of innovation and accelerates the development and fielding of needed military capabilities to address current and future problems. The Air Force has established PE 0602212F, where the 10 U.S.C. Section 2363 funds are internally reprogrammed to this program element in the year of execution after receipt of the appropriation. This allows increased transparency to Congress on 10 U.S.C. Section 2363 funding and additional execution flexibility for 10 U.S.C. Section 2363 activities to cross all technology areas. This program is in Budget Activity 2, Applied Research because this budget activity includes studies, investigations, and non-system specific technology efforts directed toward general military needs with a view toward developing and evaluating the feasibility and practicality of proposed solutions and determining their parameters.

Justification

Accomplishments & Planned Programs (1)

Defense Laboratories R&D Projects - Air Force Research Laboratory

Implementation of 10 U.S.C. Section 2363, amendment to PL 110-417, 10 U.S.C. Section 2358 and 10 U.S.C. 2805(d)(1)(B), to fund: innovative basic and applied research conducted at the Air Force Research Laboratory (AFRL) and supports military missions; development programs supporting the transition of technologies developed by AFRL into operational use; workforce development activities improving the capacity of AFRL to recruit and retain personnel with necessary scientific and engineering expertise that support military missions; and the repair or minor military construction of the laboratory infrastructure and equipment.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY24 Actuals$111.7M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$111.7M$0$0$0
622030: Defense Lab R&D Projects$0$111.7M$0$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Defense Laboratories R&D Projects (10 U.S.C, Sec 2358). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.