F-35 STOVL Series
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $259.4M |
| FY25 | $229.8M |
| FY26 | $364.8M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $161.8M | $189.5M | $259.4M | ||
| Enacted | – | $189.5M | $311.9M | $229.8M | |
| Request | – | – | $311.9M | $283.0M | $364.8M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $311.9M for FY2024; the PB2026 book reported $259.4M as actual total obligation authority — $52.5M below the request. 259.4 − 311.9 = -52.5 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — F-35 STOVL Series
The F-35 Joint Strike Fighter (JSF) Program will develop and deploy a family of highly common, affordable, next generation, stealthy, multi-role strike fighters that meet the needs of multiple services and countries. The United States Marine Corps Short Take Off and Vertical Landing (STOVL) Operational Safety Improvement Program provides near and long term long-term improvements to the fleet, focusing on documented deficiencies related to safety, reliability and maintainability, aircraft systems, avionics, and Block upgrades. These modifications and selected component changes are being accomplished by contractor field teams and organic depot retrofit activities. Block 4 upgrades provide a more robust performance in navigation, weapons, avionics, survivability, maneuverability, maintainability, and mission deployment of the F-35B platform. This modification program will bring early production Low Rate Initial Production (LRIP) aircraft and integrated systems to a common fleet configuration as fielded capabilities evolve over the course of the F-35B program. In order to meet emerging deficiencies, the airframe and integrated systems must be modified as critical corrections/changes are identified. Funds will be used to manage, prepare, process, and incorporate changes to sustain and improve F-35B system operations. The Structural Life Limit Parts (SLLP) Program is the preponderance of the correction of deficiencies effort. The Structural Life Limit Parts (SLLP) Program will remove life limits below 8,000 hours. In FY2026, the Program will conduct Non-Recurring engineering (NRE) as well as procure and install SLLP modifications. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES The seven dock expansion at Fleet Readiness Center East will be fully activated in FY2026 which will increase the capacity for installations.
Justification
Justification — F-35 STOVL Series
Basis for FY2026 budget request is to continue to fund the F-35B Total Active Inventory of 200 aircraft, with an inventory objective of 243. FY2026 funding increased primarily to accelerate Block 4 kit procurements and increase the pace of installations as depot capacity grows to avoid aircraft grounding due to life limits.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Navy | N | FY24 Actuals | $259.4M |
| Aircraft Procurement, Navy | N | FY25 Enacted | $229.8M |
| Aircraft Procurement, Navy | N | FY26 Disc. Request | $364.8M |
| Aircraft Procurement, Navy | N | FY26 Total | $364.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.19B | $259.4M | $229.8M | $364.8M | $364.8M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| TX-12 | $42.7B |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| LOCKHEED MARTIN CORPORATION | N0001915C0016 | high |
| LOCKHEED MARTIN CORPORATION | N0001917C0001 | high |
| LOCKHEED MARTIN CORPORATION | N0001920F0571 | high |
| LOCKHEED MARTIN CORPORATION | N0001923F0002 | high |
| LOCKHEED MARTIN CORPORATION | N0001925C0070 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not F-35 STOVL Series. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O382
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O387
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O387
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.