Printed from https://fiscalreceipts.com/program/0570/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Power Plant Changes
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $25.0M |
| FY25 | $16.8M |
| FY26 | $18.7M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $28.9M | $28.8M | $25.0M | ||
| Enacted | – | $24.7M | $21.1M | $16.8M | |
| Request | – | – | $21.1M | $16.8M | $18.7M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $21.1M for FY2024; the PB2026 book reported $25.0M as actual total obligation authority — $3.97M above the request. 25.05 − 21.08 = 3.97 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Power Plant Changes
This line item funds modifications to all in-service aircraft engines. Power Plant Changes (PPC) are required throughout the service life of each aircraft to correct flight deficiencies and improve operational readiness while reducing engine operating costs. This program finances the procurement and installation of retrofit kits for all Navy and Marine Corp aircraft engines and related propulsion hardware such as propellers, starters and transmissions. The overall goal of the modifications budgeted is to continue modification efforts previously initiated on the engines for the AV-8B, F/A-18C/D & E/F, EA-18G, F-16, F-5, H-60, H-53, EA-6B, T-38, T-45, P-3, P-8A, E-2C, E-2D, C-2A, C-130, UH-1Y, AH-1Z, JSF, H-53 and AE1107C (V-22).
Justification
Justification — Power Plant Changes
FY 2026 funding for procurement and installation of retrofit kits for all Navy and Marine Corp aircraft engines and related propulsion hardware. The FY 2026 request was reduced by $2.024 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $0.158 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Navy | N | FY24 Actuals | $25.0M |
| Aircraft Procurement, Navy | N | FY25 Enacted | $16.8M |
| Aircraft Procurement, Navy | N | FY26 Disc. Request | $18.7M |
| Aircraft Procurement, Navy | N | FY26 Total | $18.7M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $785.2M | $25.0M | $16.8M | $18.7M | $18.7M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
7 mentions from the Senate LDA disclosure database.
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric…
H.R. 471/S. 1462, the Fix Our Forest Act; H.R. 4776, SPEED Act H.R. 161, New Source Review Permitting Improvement Act H.
H.R. 471/S. 1462, the Fix Our Forest Act; H.R. 4776, SPEED Act H.R. 161, New Source Review Permitting Improvement Act H.
S.190- Energy Threat Analysis Program Act of 2025; H.R. 3616, Reliable Power Act H.R. 1047, Grid Power Act H.R. 3632…
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric…
H.R. 3616, Reliable Power Act H.R. 1047, Grid Power Act H.R. 3632, Power Plant Reliability Act H.R. 3638, Electric…
Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Power Plant Changes. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O370
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O375
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O375
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
APN BA1-4 Book · www.secnav.navy.mil