NavyProcurementReconciledBLI0569
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
T-45 Series (0569) is a Navy procurement line funded in the Aircraft Procurement, Navy account.
What changed
+$24.3M FY25→26 P-1 TOA · PB2026
Who gets it
BOEING leads 4 contractor families sharing $308.6M in high-confidence matched awards.

Budget figures

FY24 Actuals
$162.1MP-1 TOA · PB2026
FY25 Enacted
$149.1MP-1 TOA · PB2026
FY26 Request
$173.4MP-1 TOA · PB2026
FY25→26 Change
+$24.3MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $162.1MFY25: $149.1MFY26: $173.4MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$162.1M
FY25$149.1M
FY26$173.4M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$155.4M$195.7M$162.1M
Enacted–$199.4M$170.4M$149.1M
Request––$170.4M$158.8M$173.4M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $170.4M for FY2024; the PB2026 book reported $162.1M as actual total obligation authority — $8.22M below the request. 162.133 − 170.357 = -8.224 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — T-45 Series

This line item funds modifications to T-45 Training System (T45TS) which encompasses both aircraft and Ground-Based Training Systems (GBTS). Current inventory is 193 Aircraft. The T-45 Goshawk is a tandem-seat, carrier capable derivative of the existing British Aerospace Hawk aircraft powered by a single Rolls Royce Adour engine. It serves as the aircraft component of the T45TS integrated jet pilot training system. The overall goal of the modifications budgeted is to correct discrepancies and deficiencies discovered after delivery of the aircraft and to commence upgrades to the aircraft cockpit and navigation systems. T-45 aircraft and simulators are facing critical avionics obsolescence and Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues. Operational Safety and Improvement Program (OSIP) 008-95 - Corrections of Deficiencies was established to resolve safety and reliability issues, improve required mission capabilities and correct in-service deficiencies to aircraft components. OSIP 003-03 - Engine Surge funds resolve engine surge critical safety issues. OSIP 017-04 - Avionics Obsolescence funds continuing avionics obsolescence and DMSMS issues and implements safety related avionics upgrades. OSIP 022-14 - The designed service life of the aircraft was 14,400 hours and reduced as a result of Service Life Assessment Program (SLAP) analysis to 13,000 hours. Service Life Extension Program (SLEP) funds correction of deficiencies discovered in the Service Life Assessment Program (SLAP), which identified risk areas that must be addressed in order to extend the aircraft service life. OSIP 006-16 - Required Avionics Sustainment Program (RASP) will modify the T45TS with the Automatic Dependent Surveillance-Broadcast Out (ADS-B Out) Capability to comply with the January 1, 2020 Federal Aviation Administration (FAA) National Airspace Systems Mandate as well as other FAA and Navigation mandates. Additionally, the T-45 Navigation source Global Positioning System Inertial Navigation Assembly (GINA) will be updated to address obsolescence. OSIP 012-19 - Physiological Episode Mitigation funds modifications to the T-45 training system to address aircrew Physiological Episodes (PE).

Justification

Justification — T-45 Series

The FY 2026 funding request is for correction of deficiencies to resolve safety and reliability issues; resolve engine surge critical safety issues; avionics obsolescence, Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues and safety related avionics upgrades; correction of deficiencies discovered in the SLAP; Required Avionics Sustainment Program (RASP) - Phase One (Automatic Dependent Surveillance - Broadcast (ADS-B) Out) and Phase Two (Multi-Function Color Displays (MFCD's); and Physiological Episode (PE) mitigation modifications to address aircrew PEs. The FY 2026 request was reduced by $6.045 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $1.064 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, NavyNFY24 Actuals$162.1M
Aircraft Procurement, NavyNFY25 Enacted$149.1M
Aircraft Procurement, NavyNFY26 Disc. Request$173.4M
Aircraft Procurement, NavyNFY26 Total$173.4M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.89B$162.1M$149.1M$173.4M$173.4M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 0569 (T-45 Series), its 12 largest high-confidence awards, the 4 recipient families behind them, and the 5 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 0569 (T-45 Series), its 12 largest high-confidence awards, the 4 recipient families behind them, and the 5 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNProcurement appropriation0569173.4M FY26N6833523F0001PHYSICAL OPTICS CORPORATION70.9MN0042121F0394THE BOEING COMPANY53.5MN6134018F0067THE BOEING COMPANY44.6MN6134018F0001THE BOEING COMPANY41.4MN6134020F0029THE BOEING COMPANY32.0MN6833520F0001PHYSICAL OPTICS CORPORATION28.4MN0042118F0047MISSION SYSTEMS DAVENPORT I…18.2MN6134018F0056THE BOEING COMPANY12.2MN6134020F0029THE BOEING COMPANY10.3MN0042121F0103MISSION SYSTEMS DAVENPORT I…9.13MN0001915C0039PHYSICAL OPTICS CORPORATION5.11MN0001920F0029LOCKHEED MARTIN CORPORATION293.0KPHYSICAL OPTICS CORPORATI…The Boeing CompanyMISSION SYSTEMS DAVENPORT…Lockheed Martin CorpMO-01CA-43IA-01TX-21TX-12

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
MO-01$166.7M
CA-43$104.4M
IA-01$27.0M
TX-21$10.3M
TX-12$293.0K

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
LOCKHEED MARTIN CORPORATIONN0001920F0029high
MISSION SYSTEMS DAVENPORT INC.N0042118F0047high
MISSION SYSTEMS DAVENPORT INC.N0042121F0103high
PHYSICAL OPTICS CORPORATIONN0001915C0039high
PHYSICAL OPTICS CORPORATIONN6833520F0001high
PHYSICAL OPTICS CORPORATIONN6833523F0001high
THE BOEING COMPANYN0001911G0001high
THE BOEING COMPANYN0042121F0394high
THE BOEING COMPANYN6134018F0001high
THE BOEING COMPANYN6134018F0056high
THE BOEING COMPANYN6134018F0067high
THE BOEING COMPANYN6134020F0029high
THE BOEING COMPANYN6893615D0016high
THE BOEING COMPANYN0001903C6528medium

Contractor concentration

HHI Indexⓘ
4636
Highly Concentrated
2023 Merger Guidelines bands
Top Contractor
BOEING
Contractor Families
4
Program Obligationsⓘ
$308.6M

High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not T-45 Series. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.