Trainer A/C Series
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $16.4M |
| FY25 | $12.4M |
| FY26 | $12.2M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $7.85M | $9.57M | $16.4M | ||
| Enacted | – | $9.57M | $16.4M | $12.4M | |
| Request | – | – | $16.4M | $12.4M | $12.2M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Trainer Acft Series
This line item funds modifications to a group of trainer aircraft systems which includes the T-44 and TH-57, US Navy Test Pilot School (USNTPS) aircraft, the TH-73A, and the T-54. The T-44 is a twin-engine, multi-seat turboprop aircraft produced by Hawker Beech Aircraft and is utilized to provide training for simulated operation of multi-engine training. Specifically, this aircraft provides pipeline training for the P-3, P-8, EP-3, KC-130, E-6, E-2, C-2, MV-22 and CMV-22. Current Navy inventory is 54 aircraft with service life thru 2028 with possible multiyear extensions. The overall goal of modifications for T-44 is to modify and/or upgrade aircraft avionics and associated sub-systems to include upgrades to avionic systems for Federal Aviation Administration (FAA) compliance. Efforts also include, Avionics modifications to address safety, reliability, maintainability, obsolescence, and Diminishing Manufacturing Sources and Material Shortages (DMSMS). requirements. Modifications, particularly to avionic systems, may also be driven by new Cyber Security requirements. The TH-57 is a single engine, multi-seat rotary wing aircraft utilized to provide rotary wing training. Current Navy TH-57 inventory is 92 aircraft. The airframe and dynamic components can be sustained indefinitely (although at higher costs as time goes on). The overall goal of modifications for TH-57 is implement safety updates as well as required upgrades to avionic systems for FAA compliance. Efforts also include, modifications to airframe, avionics, and sub-systems, necessary to address safety, reliability, maintainability, obsolescence, and Diminishing Manufacturing Source and Material Shortages (DMSMS) requirements. Modifications, particularly to avionic systems, may also be driven by new Cyber Security requirements. Test Pilot School aircraft support training of test pilots, Naval Flight Officers (NFOs), Flight Test and System Test Engineers. TPS aircraft include (10) T-38C, (2) TH-57C, (5) UH-72A, (6) OH-58C, (2) U-6A, (1) NU-1B, (2) X-26, (2) UV-18A and (1) C-26A. Efforts include modifications to airframe, avionics, power/propulsion and sub-systems, necessary to address safety, reliability, maintainability, obsolescence, capability, system/sub-system components, and Diminishing Manufacturing Sources and Material Shortages (DMSMS) requirements. Modifications, particularly to avionic systems, may also be driven by new Cyber Security requirements. The TH-73A is a single engine, multi-seat rotary wing aircraft. The TH-73A replaces the TH-57 to provide rotary wing training to the fleet. Modifications address correction of deficiency issues that arise on aircraft accepted off the production line as well as safety issues. Total TH-73A inventory is 130. The T-54 is a twin-engine, multi-seat turboprop aircraft produced by Textron Aviation Incorporated and is utilized to provide multi-engine training to student pilots. Specifically, this aircraft provides pipeline training for the P-8, EP-3, KC-130, E-6, E-2, MV-22 and CMV-22. Current Navy inventory is 63 aircraft.
Justification
Justification — Trainer Acft Series
OSIP 015-16 FY 2026 request continues the T-38 Wing Upgrade Program, Talon Repair, Improvement, and Modification (TRIM). OSIP 006-23 FY 2026 request addresses correction of deficiencies modifications for the TH-73A program. OSIP 011-26 FY 2026 request addresses Avionics Obsolescence modifications for the T-54 program. OSIP 012-26 FY 2026 request addresses safety issues on the TH-73A platform. The FY 2026 request was reduced by $0.201 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $0.141 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Navy | N | FY24 Actuals | $16.4M |
| Aircraft Procurement, Navy | N | FY25 Enacted | $12.4M |
| Aircraft Procurement, Navy | N | FY26 Disc. Request | $12.2M |
| Aircraft Procurement, Navy | N | FY26 Total | $12.2M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $284.6M | $16.4M | $12.4M | $12.2M | $12.2M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| PA-02 | $664.8M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| AGUSTAWESTLAND PHILADELPHIA CORPORATION | N6134020C0007 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Trainer A/C Series. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O363
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O367
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O368
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
APN BA1-4 Book · www.secnav.navy.mil