Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $173.6M |
| FY25 | $135.0M |
| FY26 | $143.8M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $199.9M | $188.8M | $173.6M | ||
| Enacted | – | $188.9M | $183.2M | $135.0M | |
| Request | – | – | $183.2M | $148.1M | $143.8M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $183.2M for FY2024; the PB2026 book reported $173.6M as actual total obligation authority — $9.63M below the request. 173.6 − 183.2 = -9.6 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — E-2 Series
This line item funds modifications to the E-2 aircraft. The E-2 is an all-weather, carrier based, airborne early warning, command and control aircraft that extends task force defense perimeters by providing early warning of approaching enemy units and by vectoring interceptors into attack position. Additionally, the HAWKEYE provides strike control, radar surveillance, search and rescue assistance, communications relay and automatic tactical data exchange. As the result of technological advancements, the Commercial-Off-The-Shelf (COTS) hardware/software of the Mission Computer will change or become obsolete in the very near future. -E-2 Embedded National Tactical Receiver (ENTR) OSIP (08-17): Provides the E-2 with the capability to receive intelligence data from national assets for real-time, emergent threat or CID data, compressing tactical engagement timeline for Naval Integrated Fire Control (NIFC) kill chains. -Structural Enhancements OSIP (12-17): Enables the aircraft's full service life and removes vehicle performance envelope restrictions. This will mitigate the potential for aircraft grounding due to previously unmitigated structural issues. -E-2D Aerial Refueling (AR) OSIP (02-18): Allows the E-2 to receive fuel from various organic and non-organic tanker aircraft. It will provide Expanded Battle Space Surveillance and Targeting through significantly enhanced persistence and increased flexibility (range & endurance). -E-2 Secret Internet Protocol Router Chat (SIPR CHAT) OSIP (03-18): Supports the integration of current collaboration tools including tactical "chat" (text) communications, real-time tasking, and Air Tasking Order distribution. Recent real world operations have demonstrated a migration of Command and Control communications from voice to Internet protocol based networks. -Navigational Warfare (NAVWAR) OSIP (11-19): Allows the E-2D Advanced Hawkeye (AHE) to operate in areas where signal disruption would prohibit unprotected GPS reception. The E-2D AHE will be able to provide continuous operations in a degraded GPS environment for mission areas that depend on GPS for precise position, navigation, and timing. Also, provides Naval platforms improved access to GPS signals in challenged and jamming environments. Modernizes GPS receivers to utilize the new M-Code GPS Signal in Space, incorporate enhanced cryptology, deliver greater position and time accuracy, provide improved protection against signal spoofing as compared to legacy Selective Anti-Jam Anti-Spoof Module (SAASM) receivers and replace an obsolescence issue. -Advanced Radar Processor (ARP) OSIP (03-20): Essential upgrade to the E-2D APY-9 Radar system that improves the radar processing capability six-fold, reduces production costs, addresses obsolescence, reduces future support costs and enables future growth by reducing the number of Subsystem Replaceable Assembly's in the processors. ARP is required to support the transition of current Science & Technology investments in NIFC Increment 3, Counter Electronic Attack and Sensor Netting. -E-2 Technology Upgrades (16-20): Ensures fleet configuration management and addresses deficiencies, obsolescence, urgent operational needs, and flight safety issues of Mission Systems, Communications, Navigation, and Data Links including hardware, software and firmware components. This OSIP will execute a strategic, comprehensive plan to mitigate component level end of production and end of support due to deficiencies and obsolescence on all E-2 aircraft and trainers. -Datalinks (18-20): Addresses Crypto Modernization (CM) upgrades and Frequency Remapping (FR) capabilities. This OSIP will field the LINK 16 CM/FM capability into the E-2 Series aircraft. Funding will also be used to integrate and field Multifunctional Information Distribution System (MIDS) Joint Tactical Radio System (JTRS) Tactical Targeting Network Technology (TTNT) wave form. -Electronic Support Measures OSIP (07-21): Digital upgrade greatly enhances CID, battle space awareness, and effectiveness of blue forces. Combat Identification (#3) requirements and Electronic Protection (#4) are specifically called out on COMACCLOGWING's FY19 E-2D Naval Aviation Requirements Group (NARG) Message and Electronic Warfare is directly identified in US Fleet Forces POM-21 Integrated Priority List submission. -Precision Approach Landing Capability (PALC) OSIP (17-26): Funds the necessary E-2D modifications, integration, and fielding of a contested environment PALC related ECP's. This OSIP will address the sundown of the legacy Automatic Carrier Landing Systems (ACLS) and aligns to the OPNAV N98 PALC roadmap north star for the phased fielding approach for BRIZO. There are currently 10 E-2Cs and 64 E-2Ds in the Fleet inventory, a total of 74 aircraft. As of the latest Master Aviation Plan (MAP) E-2C's are set to sundown in FY 2027. As they retire, they are replaced with E-2D's. E-2Ds are still in production with final aircraft deliveries planned thru 2030. As of FY 2026 the program has been funded for a total of 86 total E-2D aircraft. The E-2 has a service life of 10,000 flight hours. E-2C average flight hours per aircraft remaining: 2,887 hours E-2D average flight hours per aircraft remaining: 7,765 hours
Justification
Justification — E-2 Series
Basis for FY 2026 request is to procure modification kits to support AR, SIPRCHAT, NAVWAR, MIDS/JTRS TTNT, Crypto Mod, AN/APN-246 Beacon, various Structural Enhancement and various Tech Upgrade ECP's. FY 2026 request also funds installation and program support costs associated with those efforts. The FY 2026 request was reduced by $8.222 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $0.925 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Navy | N | FY24 Actuals | $173.6M |
| Aircraft Procurement, Navy | N | FY25 Enacted | $135.0M |
| Aircraft Procurement, Navy | N | FY26 Disc. Request | $143.8M |
| Aircraft Procurement, Navy | N | FY26 Total | $143.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $2.30B | $173.6M | $135.0M | $143.8M | $143.8M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| HAMILTON SUNDSTRAND CORPORATION | N0042123F0197 | high |
| LOCKHEED MARTIN CORPORATION | N6833522C0243 | high |
| NORTHROP GRUMMAN SYSTEMS CORPORATION | N0001918F2334 | high |
| NORTHROP GRUMMAN SYSTEMS CORPORATION | N0001921F0064 | high |
| NORTHROP GRUMMAN SYSTEMS CORPORATION | N0001924F0284 | high |
Contractor concentration
High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not E-2 Series. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O362
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O366
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O367
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
APN BA1-4 Book · www.secnav.navy.mil