Skip to content
Fiscal Receipts

EP-3 Series

NavyProcurementReconciledBLI0537
What it is
EP-3 Series (0537) is a Navy procurement line funded in the Aircraft Procurement, Navy account.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$8.55MP-1 TOA · PB2026
FY25 Enacted
$0J-book detail · PB2026
FY26 Request
$0J-book detail · PB2026
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2024. The PB2026 J-book detail below does carry an FY2026 row for this line, recorded as zero. A workbook blank and a documented zero are different records, and this page shows both. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $8.55MFY25: $0FY26: $0FY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$8.55MP-1 TOA · PB2026
FY25$0J-book detail · PB2026
FY26$0J-book detail · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

3 fiscal years of this program as published (FY2022–FY2024): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
3 fiscal years of this program as published (FY2022–FY2024): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2024 request — PB2024 editionFY22FY23FY24

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24
Actuals$28.8M$8.49M$8.55M
Enacted–$8.49M$8.55M
Request––$8.55M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — EP-3 Series

This line item funded modifications to the EP-3E aircraft. The EP-3E was a land-based, long-range aircraft with electronic intercept devices for detection and tracking of enemy Radio Detection and Ranging and communications. In Operational, Safety, and Improvement Program (OSIP) 11-01, the Joint Airborne Signal Intelligence Architecture Modification Common Configuration (JCC) obsolescence Engineering Change Orders (ECO) improved operational capability and aircrew productivity by updating the Electronic Support Measures systems, applying state-of-the-art signal exploitation/processing/display techniques, off-boarding classified communications, and expanded special signal processing capability while meeting cybersecurity, crypto, and emerging requirement upgrades. The EP-3E Series budget provided support of EP-3E operations as a result of schedule pressure on development, production, and IOC for the MQ-4C Triton IFC-4. Based on NDAA 2011, the US Navy was required to maintain the EP-3E platform until a suitable replacement (in both capability and capacity) was fielded. As a result, the Navy authorized a three-year extension of the EP-3E through FY 2024 with sundown to complete mid-FY 2025. FY 2024 JCC Obsolescence funds addressed the EP-3E mission viability, mission systems obsolescence, improved cybersecurity posture, National Security Agency mandates, and Signals Intelligence (SIGINT) modifications required to address emerging threats in a dynamic electronic warfare environment (aka "pacing the threat") and responded to the current, immediate demand for information operations capabilities on the EP-3E. Active Primary Aircraft Authorization inventory will be reduced to 0 by end of FY25. Funds budgeted in FY 2022-FY 2024 funded EP-3E mission viability, addressed mission systems obsolescence issues and cybersecurity posture, and paced the threat to remain compliant with FY11 National Defense Authorization Act (NDAA) guidance. The EP-3E airframe has an average age of 50 years.

Justification

Justification — EP-3 Series

For FY2025 these modification efforts conclude as the EP-3E aircraft transition out of service. OOC: FY 2022 includes $11.694M in OOC execution. FY 2023 includes $5.823M in OOC enacted budget. FY 2024 includes $3.931M for the OOC budget request.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, NavyNFY24 Actuals$8.55M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.44B$8.55M$0$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not EP-3 Series. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.