Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $22.4M |
| FY25 | $17.5M |
| FY26 | $25.8M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $20.2M | $25.1M | $22.4M | ||
| Enacted | – | $25.1M | $24.1M | $17.5M | |
| Request | – | – | $24.1M | $17.5M | $25.8M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $24.1M for FY2024; the PB2026 book reported $22.4M as actual total obligation authority — $1.71M below the request. 22.4 − 24.1 = -1.7 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — AEA Systems
The PB 2026 budget request supports the acceleration of Low Band Consolidated (LBC) transmitter procurement to increase reliability and readiness, Band 9/10 Circuit Card Assemblies and patagium antennas for various transmitters. This line item funds modifications to Airborne Electronic Attack (AEA) products used on EA-18G. Modifications budgeted and programmed include: procurement and enhancement of the AN/ALQ-99 Tactical Jamming System (TJS), AN/ALQ-99 TJS upgrades and related sustainability, capability, and viability modifications. AEA will support procurement of new technologies and equipment as needed to combat emerging and evolving electronic warfare technology and systems.
Justification
Justification — AEA Systems
The Department of the Navy has been tasked with accomplishing the Nation's AEA mission in various theaters of operation over the last few decades. The AEA capability fielded by the Navy on the EA-18G Growler has been a high demand, low density asset. Stable investment in AEA systems will ensure continued availability of AEA capability to meet warfighter demand. Investment in the AN/ALQ-99 TJS will ensure continued system availability until Next Generation Jammer (NGJ) achieves Full Operational Capability across all bands of the Electromagnetic Spectrum (EMS). AEA System procurements and related efforts are required to combat emerging electronic warfare technology and systems. Investment in AEA System efforts will ensure that sufficient AEA capability is available to meet warfighter requirements. The FY 2026 request was reduced by $1.329 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $0.282 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Navy | N | FY24 Actuals | $22.4M |
| Aircraft Procurement, Navy | N | FY25 Enacted | $17.5M |
| Aircraft Procurement, Navy | N | FY26 Disc. Request | $25.8M |
| Aircraft Procurement, Navy | N | FY26 Total | $25.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $509.5M | $22.4M | $17.5M | $25.8M | $25.8M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| PA-01 | $31.7M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| CAES SYSTEMS LLC | N0001916C0007 | high |
| CAES SYSTEMS LLC | N0016416DWS02 | high |
| CPI RADANT TECHNOLOGIES DIVISION INC. | N0016418DWS20 | high |
| L3HARRIS TECHNOLOGIES, INC. | N0016416DWS01 | high |
| TELEDYNE DEFENSE ELECTRONICS, LLC | N0016416DWS94 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not AEA Systems. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O353
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O357
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O358
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
APN BA1-4 Book · www.secnav.navy.mil