RQ-11 UAV
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $2.11M |
| FY25 | $2.02M |
| FY26 | $1.06M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $682.0K | $635.0K | $0 | $2.00M | $524.0K | $509.0K | $537.0K | $533.0K | $1.22M | $2.11M | ||
| Enacted | $635.0K | $418.0K | $2.02M | $524.0K | $509.0K | $537.0K | $533.0K | $1.23M | $2.11M | $2.02M | ||
| Request | $418.0K | $2.02M | $524.0K | $509.0K | $537.0K | $533.0K | $1.23M | $2.11M | $2.02M | $1.06M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2017 book requested $418.0K for FY2017; the PB2019 book reported $0 as actual total obligation authority — $418.0K below the request. 0.0 − 0.4 = -0.4 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — RQ-11 UAV
Family of Small Unmanned Aircraft Systems (FoSUAS) (formerly Small Unit Remote Scouting System (SURSS) is a Commandant of the Marine Corps Force Modernization initiative. FoSUAS consists of Short Range/Short Endurance (SR/SE), Medium Range/Medium Endurance (MR/ME) and Long Range/Long Endurance (LR/LE) systems. The FoSUAS program provides Small Unmanned Aircraft Systems (SUAS) for battalion/company/detachment level units with scalable airborne Reconnaissance, Surveillance, and Target Acquisition (RSTA) capabilities to aid in detecting, identifying, engaging, and/or avoiding enemy units. Although Force Design Modernization prioritizes LR/LE capabilities, the requirements for SR/SE and MR/ME systems remain to minimize operational risk and improve operational flexibility in asset allocation that maximizes economy of force across the conflict continuum. FoSUAS meets the validated operational requirements delineated in the Operational Requirements Document (ORD), Vertical Take Off and Landing (VTOL) Rapid Acquisition Top Level Requirements (TLR), and Long Range/Long Endurance (LR/LE) TLR. SR/SE is a SUAS with a 5-10 kilometer range and endurance up to 50 minutes. SR/SE systems address the need for situational awareness in urban and challenging terrain environments and reduce request-to- response timeframes for RSTA coverage. MR/ME is a SUAS with a 10-20 kilometer range and endurance up to 4 hours. MR/ME provides an organic, persistent RSTA capability to company level units, Route Clearance Platoons (RCP), and Combat Logistics Patrols (CLP) to enhance force protection, detect Improvised Explosive Devices (IEDs), provide laser targeting/marking/range finding, and communication relay. LR/LE is a SUAS with a 20-50 kilometer range and endurance up to 6 hours. LR/LE provides organic capabilities to battalion level units to satisfy Ground Combat Element RSTA needs. LR/LE SUAS are currently deployed to conduct multi-sensor RTSA operations for Marine Forces Special Operations Command and support Marine Corps fires and maneuver elements.
Mission — Unmanned Air Systems (Intel)
In support of the Commandant of the Marine Corps (CMC) Planning Guidance and Force Design Modernization, the Family of Small Unmanned Aircraft Systems (FoSUAS) program provides Small Unmanned Aircraft Systems (SUAS) for battalion/company/detachment level units with scalable airborne RSTA capabilities to aid in detecting, identifying, engaging, and/or avoiding enemy units. FoSUAS meet validated operational requirements delineated in the Operational Requirements Document (ORD), Vertical Take Off and Landing (VTOL) Rapid Acquisition Top Level Requirements (TLR), and Long Range/Long Endurance (LR/LE) TLR. SUAS Reusable Architecture (SRA) capability will reduce the size, weight, and manpower required to operate a SUAS, increases the mobility of the operator, and improves digital interoperability. The SRA project, a technology improvement effort, will increase interoperability, protect cyber security, and reduce cyber security risk, decrease maintenance and sustainment costs, minimize risk and cost associated with technology insertion and improvement, and reduce manpower required to operate a FoSUAS. FoSUAS is developing SRA to establish reference implementations and industry guidance for all key SUAS interfaces, drastically improving interoperability by permitting industry, government, and academia to design-to-field hardware and software capabilities with well-defined integration and cybersecurity requirements up front. In addition to accelerating payload integration, SRA will allow portability of both software and hardware-based functionality across disparate platforms and control segments, as well as enable rapid integration of both open and closed-source artificial intelligence/machine learning (AI/ML) tools to inject autonomy and target recognition capabilities into FoSUAS. This effort will reduce duplicative engineering, training, integration, and sustainment efforts associated with closed, proprietary systems. SRA also seeks to authorize all SRA-compliant systems under a single service accreditation in order to define, address, and mitigate security vulnerabilities at the enterprise-level in current and future platforms.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $2.11M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $2.02M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $2.02M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $1.06M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $1.06M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $8.77M | $2.11M | $2.02M | $1.06M | $1.06M |
| 2292: Unmanned Air Systems (Intel) | $8.77M | $2.11M | $2.02M | $1.06M | $1.06M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not RQ-11 UAV. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J487
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J440
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J472
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J490
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J500
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J509
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J475
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J468
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J461
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J469
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil