MQ-4C Triton
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $12.1M
- FY25
- $14.4M
- FY26
- $14.4M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $419.2M | $237.1M | $113.6M | $94.1M | $13.4M | $11.8M | $11.1M | $13.0M | $13.9M | $12.1M | ||
| Enacted | $227.1M | $111.7M | $84.1M | $14.4M | $11.8M | $11.1M | $13.0M | $13.9M | $12.1M | $14.4M | ||
| Request | $111.7M | $84.1M | $14.4M | $11.8M | $11.1M | $13.0M | $13.9M | $12.1M | $14.4M | $14.4M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2018 book requested $84.1M for FY2018; the PB2020 book reports $94.1M actually spent — $10.0M above the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — MQ-4C TRITON
The MQ-4C Triton Unmanned Air System (UAS) is a high altitude-long endurance UAS designed to provide Fleet and combatant commanders with persistent maritime Intelligence, Surveillance Reconnaissance and Targeting (ISR&T) of nearly all the world's high-density sea-lanes, littorals, and areas of national interest. The Triton air vehicle, mission control system, specialized sensors, and communications suite play a significant role in achieving the Navy's strategic vision for the 21st century. Triton provides persistent ISR&T and unparalleled situational awareness of the maritime battle space to the supported combatant commander and fleet commander. Triton provides the Warfighter with unprecedented levels of battlespace awareness to synchronize actions necessary to maintain maritime full spectrum superiority. Teamed with its manned-capability counterpart, the P-8A Poseidon, Triton is a key component of the Navy's maritime domain awareness family of systems. MQ-4C Triton leverages Maritime Patrol and Reconnaissance Force manpower, training and maintenance efficiencies. Triton Early Operational Capability (EOC) was successfully deployed in 2020 to provide early fleet integration risk reduction. It successfully prepared the fleet for fielding Initial Operational Capability (IOC) and concluded in 2022. In August of 2023 Triton fielded the Increment 1 Multi-Intelligence (Multi-INT) IOC on schedule, successfully meeting the 2011 National Defense Authorization (NDAA) requirements. This enabled the Navy's Maritime Intelligence, Surveillance, Reconnaissance, and Targeting (MISR-T) transition plan and initiated EP-3 Aries sundown. The Increment 1 Multi-INT capability provides Signals Intelligence (SIGINT), Counter Electronic Attack (CEA) upgrades, and data dissemination across multiple classification domains. Triton initiated Increment 2 development in FY 2023. Increment 2 will provide advanced radar modes inclusive of Ground Moving Target Indicator (GMTI), enhanced Electro-Optic/Infrared (EO/IR) detection in support of Geographic Intelligence (GEOINT) for increased maritime domain awareness, High Gain Aperture (HGA) for improved SIGINT, communications, navigation, and networks resiliency in denied environments, Multi-UA Command and Control (C2) for increase on station time, and Sense and Avoid (SAA) traffic and weather capability for increased mission availability and airspace integration. Increment 2 development is also addressing required Diminishing Manufacturing Source (DMS) and cyber security updates. Project Unit 4020: MQ-4C Triton Baseline funding supported developmental efforts from the inception of the program and continues to fund air vehicle Full Scale Fatigue Testing (FSFT), Effects of Defects (EoD) test efforts and incorporation of stress analysis to fully verify and validate fatigue and damage tolerance requirements of the Performance Based System Specification (PBSS). Fatigue testing results are required to certify the airframe to its current estimated designed service life of 51,000 flight hours/2,029 landings. The duration of fatigue testing is paced by the cycling rate limit of the test fixture for the main wing/fuselage/tail test article, as well as time to perform teardown activities and inspect for cracks. Baseline funding also includes developmental efforts that improve the air vehicle reliability, availability, maintainability, and performance.
Mission — MQ-4C Triton
The MQ-4C Triton Unmanned Air System (UAS) is a high altitude-long endurance UAS designed to provide Fleet and combatant commanders with persistent maritime Intelligence, Surveillance Reconnaissance and Targeting (ISR&T) of nearly all the world's high-density sea-lanes, littorals, and areas of national interest. The Triton air vehicle, mission control system, specialized sensors, and communications suite play a significant role in achieving the Navy's strategic vision for the 21st century. Triton provides persistent ISR&T and unparalleled situational awareness of the maritime battle space to the supported combatant commander and fleet commander. Triton provides the Warfighter with unprecedented levels of battlespace awareness to synchronize actions necessary to maintain maritime Full Spectrum Superiority. Teamed with its manned-capability counterpart, the P-8A Poseidon, Triton is a key component of the Navy's maritime domain awareness family of systems. MQ-4C Triton leverages Maritime Patrol and Reconnaissance Force manpower, training and maintenance efficiencies. Triton Early Operational Capability (EOC) was successfully deployed in 2020 to provide early fleet integration risk reduction. It successfully prepared the fleet for fielding Initial Operational Capability (IOC) and concluded in 2022. In August of 2023 Triton fielded the Increment 1 Multi-Intelligence (Multi-INT) IOC on schedule, successfully meeting the 2011 National Defense Authorization (NDAA) requirements. This enabled the Navy's Maritime Intelligence, Surveillance, Reconnaissance, and Targeting (MISR-T) transition plan and initiated EP-3 Aries sundown. The Increment 1 Multi-INT capability provides Signals Intelligence (SIGINT), Counter Electronic Attack (CEA) upgrades, and data dissemination across multiple classification domains. Triton initiated Increment 2 development in FY 2023. Increment 2 will provide advanced radar modes inclusive of Ground Moving Target Indicator (GMTI), enhanced Electro-Optic/Infrared (EO/IR) detection in support of Geographic Intelligence (GEOINT) for increased maritime domain awareness, High Gain Aperture (HGA) for improved SIGINT, communications, navigation, and networks resiliency in denied environments, Multi-UA Command and Control (C2) for increase on station time, and Sense and Avoid (SAA) traffic and weather capability for increased mission availability and airspace integration. Increment 2 development is also addressing required Diminishing Manufacturing Source (DMS) and cyber security updates. Project Unit 4020: MQ-4C Triton Baseline funding supported developmental efforts from the inception of the program and continues to fund air vehicle Full Scale Fatigue Testing (FSFT), Effects of Defects (EoD) test efforts and incorporation of stress analysis to fully verify and validate fatigue and damage tolerance requirements of the Performance Based System Specification (PBSS). Fatigue testing results are required to certify the airframe to its current estimated designed service life of 51,000 flight hours/2,029 landings. The duration of fatigue testing is paced by the cycling rate limit of the test fixture for the main wing/fuselage/tail test article, as well as time to perform teardown activities and inspect for cracks. Baseline funding also includes developmental efforts that improve the air vehicle reliability, availability, maintainability, and performance. JUSTIFICATION FOR BUDGET ACTIVITY: The FY 2026 funding is provided for System Demonstration Test Article (SDTA) vehicles and Fatigue Testing to support post-test teardown, inspections and reporting for portions of the full-scale test efforts. Additionally, the funding supports the execution of the Effects of Defects testing to retire limitations imposed by non-blueprint product, and various air vehicle reliability, availability, maintainability, and performance improvements. This program is funded under OPERATIONAL SYSTEMS DEVELOPMENT because it includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate funding in the current or subsequent fiscal year.
Justification
Accomplishments & Planned Programs (4)
ILS, Support, Studies & Analysis
Integrated Logistics Support, Studies and Analysis.
Test & Evaluation (T&E)
T&E efforts.
Program Management (PM)
PM support and travel.
Product Development
The Prime Contractor is responsible for overall system development and performance, as well as associated management, engineering and logistics activities.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $12.1M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $14.4M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $14.4M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $14.4M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $14.4M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $3.55B | $12.1M | $14.4M | $14.4M | $14.4M |
| 4020: MQ-4C TRITON | $3.55B | $12.1M | $14.4M | $14.4M | $14.4M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.