What it is
E-4B National Airborne Operations Center (NAOC) (0302015F) is an Air Force research & development line funded in the Research, Development, Test and Evaluation, Air Force account. Its J-book detail breaks the line into 1 project.
What changed
-$2.98M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$42.1MR-1 TOA · PB2026
FY25 Total
$57.4MR-1 TOA · PB2026
FY26 Request
$54.5MR-1 TOA · PB2026
FY25→26 Change
-$2.98MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $42.1MFY25: $57.4MFY26: $54.5MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$42.1M
FY25$57.4M
FY26$54.5M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$25.0M$76.8M$25.1M$37.5M$55.7M$58.1M$3.94M$22.8M$29.4M$42.1M
Enacted$76.8M$30.9M$35.5M$57.8M$60.2M$3.46M$26.3M$25.7M$39.9M$57.4M
Request$30.9M$35.5M$57.8M$70.2M$3.47M$26.3M$25.7M$39.9M$40.4M$54.5M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2020 book requested $70.2M for FY2020; the PB2022 book reported $58.1M as actual total obligation authority — $12.1M below the request. 58.1 − 70.2 = -12.1 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — E-4B Aircraft Modernization

The four (4) aircraft E-4B National Airborne Operations Center (NAOC) fleet satisfies the military need for an airborne operations center with communications capabilities permitting military and civilian leadership to monitor and control military and civil national assets during all phases of conflict (nuclear and non-nuclear) or natural disaster. The E-4B NAOC fleet also satisfies the military requirement to provide a highly survivable node of the National Military Command System (NMCS). This program's developmental efforts include, but are not limited to, upgrades and enhancements to aircraft structures, propulsion system, fuel system, environmental control system, electrical generation and distribution systems, flight safety and navigation systems (with their associated communications equipment), and the Systems Integration Lab. Modifications may enhance the aircraft's mission capabilities necessary for the E-4B fleet to execute its mission, to include but not limited to those necessary for the Senior Leadership Command, Control and Communications System (SLC3S), National Leadership Command Capability (NLCC), and Nuclear Command, Control, and Communications (NC3). Funds may also be used to explore and develop modifications, upgrades, and future systems required to meet evolving mission requirements. This budget supports the following developmental modifications and studies/projects currently underway or planned for accomplishment: - Survivable Super High Frequency (SSHF) will upgrade and replace portions of the E-4B's Jam-Resistant Secure Communications (JRSC) system to meet existing Presidential Policy Directive (PPD)-35 and National Security Presidential Directive (NSPD)-51/Homeland Security Presidential Directive (HSPD)-20 requirements and to ensure continued connectivity and interoperability as satellite and communications infrastructure evolves. Expected modifications include, but are not limited to, component and sub-system upgrades and replaces portions of the current Super High Frequency (SHF) system that are obsolete or near end of service life. A replacement to the SHF system is required as secure, survivable communications capability transitions from the Defense Satellite Communications System (DSCS). A risk-reduction study was completed in FY19 to further define the acquisition strategy of the SSHF program. The program will be acquired in 2 increments and each increment will be split into 2 installs to expedite fielding and reduce impact to Aircraft Availability. Increment 1A will upgrade the existing Ka-band system. Increment 1B will include technical solutions such as upgrading the existing modems and systems integration lab. Increment 2A will include new modem technology and common workstation. Increment 2B will include a new Ku-band system upgrades to the X-band system. Due to Air Force priorities, the X-band requirements will be deferred. - The E-4B Systems Integration Laboratory (SIL) program will develop a test environment configured to represent the mission systems of the E-4B with connectivity to mission networks and services. E-4B SIL started as the Test Accreditation Integration Lab (TAIL) 5 for development of the E-4B SSHF program. The E-4B SIL program will expand the capabilities of TAIL 5 beyond SSHF to include the other mission communication systems within the E-4B. The E-4B SIL is necessary to minimize modernization and technical refresh schedules by reducing time on aircraft for install, test, ground connections/configurations, technical orders, redlines/rework, and training. Schedule reduction by the E-4B SIL will directly support increased Aircraft Availability (AA). The E-4B SIL will be developed in blocks begin with the Advanced Extremely High Frequency/Presidential National Voice Conferencing (AEHF/PNVC) Backbone being added to the existing SSHF baseline to provide the basic platform communications systems. The next block will incorporate the Mission Equipment Section (MES) systems to allow reproduction of necessary data to operate both the SIL and operational aircraft. The next blocks will continue to build out network and communication systems based their associated priorities and system dependencies. - Touchscreen Executive Phone - Airborne (TXP-A) - effort replaces the existing secure obsolete touch screen phones for senior national leaders to maintain multi-level security. The TXP-A will upgrade computing capabilities of the secure phone and durability of various components such as processors and touch screen displays. The replacement of the TXP-A phones will allow the NAOC to continue to meet Presidential Policy Directive (PPD)-35 requirements across the full spectrum of crisis. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such programs funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY 2024 0.0M was expended for civilian pay expenses in this program element, and in FY 2025 0.0M is forecasted for civilian pay expenses in this program element. The FY 2026 cost of Middle Tier of Acquisition (MTA) effort E-4B is reflected in the budget request, including RDT&E and procurement of prototype units. The Department will certify Future Years Defense Program (FYDP) funding in a future budget submission This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Justification

Accomplishments & Planned Programs (3)

Survivable SHF

Survivable Super High Frequency (SSHF) will upgrade and replace portions of the E-4B's Jam-Resistant Secure Communications (JRSC) system to meet existing Presidential Policy Directive (PPD)-35 and National Security Presidential Directive (NSPD)-51/Homeland Security Presidential Directive (HSPD)-20 requirements and to ensure continued connectivity and interoperability as satellite and communications infrastructure evolves. Expected modifications include, but are not limited to, component and sub-system upgrades and replaces portions of the current SHF system that are obsolete or near end of service life. A replacement to the SHF system is required as secure, survivable communications capability transitions from the Defense Satellite Communications System (DSCS). A risk-reduction study was completed in FY19 to further define the acquisition strategy of the SSHF program. The program will be acquired in 2 increments and each increment will be split into 2 installs to expedite fielding and reduce impact to Aircraft Availability. Increment 1A will upgrade the existing Ka-band system. Increment 1B will include technical solutions such as upgrading the existing modems and systems integration lab. Increment 2A will include new modem technology and common workstation. Increment 2B will include a new Ku-band system upgrades to the X-band system. Due to Air Force priorities, the X-band requirements will be deferred.

E-4B Systems Integration Laboratory (SIL)

The E-4B Systems Integration Laboratory (SIL) program will develop a test environment configured to represent the mission systems of the E-4B with connectivity with mission networks and services. E-4B SIL started as the Test Accreditation Integration Lab (TAIL) 5 for development of the E-4B SSHF program. The E-4B SIL program will expand the capabilities of TAIL 5 beyond SSHF to include the other mission communication systems within the E-4B. The E-4B SIL is necessary to minimize modernization and technical refresh schedules by reducing time on aircraft for install, test, ground connections/configurations, technical orders, redlines/rework, and training. Schedule reduction by the E-4B SIL will directly support increased Aircraft Availability (AA). The E-4B SIL will be developed in blocks and begin with the APIP Backbone being added to the existing SSHF baseline to provide the basic platform communications systems. The next block will incorporate the Mission Equipment Section (MES) systems to allow reproduction of necessary data to operate both the SIL and operational aircraft. The next blocks will continue to build out network and communication systems based their associated priorities and system dependencies.

Touchscreen Executive Phone-Airborne

TXP-A effort will replace the existing secure obsolete touch screen phones for senior national leaders to maintain multi-level security. The TXP-A will upgrade computing capabilities of the secure phone and durability of various components such as processors and touch screen displays. The TXP-A replacement will allow the NAOC to continue to meet Presidential Policy Directive (PPD)-35 requirements across the full spectrum of crisis.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY24 Actuals$42.1M
Research, Development, Test and Evaluation, Air ForceFFY25 Enacted$57.4M
Research, Development, Test and Evaluation, Air ForceFFY25 Total$57.4M
Research, Development, Test and Evaluation, Air ForceFFY26 Disc. Request$54.5M
Research, Development, Test and Evaluation, Air ForceFFY26 Total$54.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$42.1M$57.4M$54.5M$54.5M
674777: E-4B Aircraft Modernization$0$42.1M$57.4M$54.5M$54.5M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not E-4B National Airborne Operations Center (NAOC). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.