Printed from https://fiscalreceipts.com/program/0230GM0100/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Stryker (Mod)
Budget figures
No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2025. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
Insufficient trajectory data for sparkline (only FY25 available).
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY25 |
|---|---|
| Enacted | $52.5M |
| Request | $52.5M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Stryker (Mod)
The Stryker (Mod) funding line will fund procurement of Stryker Double-V Hull A1 Commander's Vehicles and related fielding costs to provide Command Post Integrated Infrastructure (CPI2) to the Stryker Brigade Combat Team (SBCT). As one of the Army's top network priorities, CPI2 technologies will be integrated with legacy mission command systems, onto a variation of the Stryker Commander's Vehicle. The integrated systems will provide a mobile and survivable command post solution to the Stryker Brigade Combat Team (SBCT), enabling on-the-move mission command across wider ranges at both the Brigade and Battalion echelons.
Justification
Justification — Stryker (Mod)
There is no FY 2026 budget request for this funding line. In accordance with Section 1815 of the FY2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY25 Enacted | $52.5M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY25 Total |
|---|---|---|
| Program Element | $1.37B | $52.5M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| CARAPACE ARMOR TECHNOLOGY, LLC | W912CH24F0191 | medium |
| DRS SUSTAINMENT SYSTEMS, INC | W912CH25F0181 | medium |
| GENERAL DYNAMICS LAND SYSTEMS INC. | W56HZV14CB019 | medium |
| GENERAL DYNAMICS LAND SYSTEMS INC. | W912CH24F0159 | medium |
| GENERAL DYNAMICS LAND SYSTEMS INC. | W912CH24F0247 | medium |
| GENERAL DYNAMICS LAND SYSTEMS INC. | W912CH25F0182 | medium |
| GENERAL DYNAMICS LAND SYSTEMS INC. | W912CH25F0198 | medium |
| HDT EXPEDITIONARY SYSTEMS INC | W912CH24F0014 | medium |
| PEARSON ENGINEERING LIMITED | W912CH24F0230 | medium |
| PEARSON ENGINEERING LIMITED | W912CH25F0199 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Stryker (Mod). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · Q89
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · S87
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Procurement of Weapons and Tracked Combat Vehicles · www.asafm.army.mil
PDF page 43