Skip to content
Fiscal Receipts

COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS)

ArmyProcurementReconciledBLI0219AD0500
What it is
COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS) (0219AD0500) is an Army procurement line funded in the Other Procurement, Army account.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$628.1MP-1 TOA · PB2026
FY25 Enacted
$288.4MP-1 TOA · PB2026
FY26 Request
Not in the FY2026 J-books we ingested
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2025. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 2 summary figures for FY24 to FY25, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 2 summary figures for FY24 to FY25, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $628.1MFY25: $288.4MFY24FY25
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$628.1M
FY25$288.4M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY22FY23FY24FY25

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25
Actuals$710.1M$299.8M$628.1M
Enacted–$299.8M$365.4M$288.4M
Request––$365.4M$280.1M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $365.4M for FY2024; the PB2026 book reported $628.1M as actual total obligation authority — $262.7M above the request. 628.1 − 365.4 = 262.7 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS)

SSN AD0514 / DIRECTED ENERGY (DE) is a new start within the COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS) program in FY 2026 This line has no funding for FY 2026. FY 2026 funding was realigned from Budget Activity (BA) 2, AD0500 COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS) to BA 6, I24000 COUNTER-SMALL UNMANNED AERIAL SYSTEM (C-SUAS) in support of Agile Portfolio Management. Advances in unmanned aircraft systems (UAS) technology and ease of accessibility increase the potential use of UAS as weapons and intelligence-gathering mechanisms against U.S. forces and Department of Defense (DoD) facilities. Funds support the procurement, training, and equipping of fixed, semi-fixed, mounted, dismounted, and handheld counter-UAS capabilities for U.S. forces and strategically-important DoD facilities worldwide. Planned counter-UAS capability procurements provide a layered defense construct against UAS threats and include a mix of electronic warfare capabilities, command and control, and kinetic and non-kinetic effectors. The Counter-small Unmanned Aircraft Systems (C-sUAS) system-of-systems was initiated in JUN 2016 in response to Joint Urgent Operational Need (JUON) CC-0558, to detect, track, classify, evaluate, and defeat Groups 1 and 2 UAS threats. On 19 NOV 2021, the Army Requirements Oversight Council approved C-sUAS Capability Development Document (CDD) Increment 1 for a C-sUAS capability at Operational Divisions (now C-UAS Batteries). On 1 FEB 2022, the Chief of Staff of the Army (CSA) accelerated C-sUAS procurement into FY 2022 (from FY 2023) and specified the systems and quantities for each battery. This CSA guidance was documented in a 2 FEB 2022 Department of the Army Military Operations Fires Division (DAMO-Fires) memorandum. In a 30 MAR 2022 Acquisition Decision Memorandum (ADM), the Army Acquisition Executive (AAE) authorized use of the Major Capability Acquisition (MCA) pathway for five separate Acquisition Category III programs: Fixed Site-Low, slow, small Unmanned Aircraft System (UAS) Integrated Defeat System (FS-LIDS); Mobile-Low, slow, small UAS Integrated Defeat System (M-LIDS); Ku-band Radio Frequency System (KuRFS) Family of Radars; Coyote Launchers/Interceptors; and Handheld/Dismounted Systems. Following an 8 MAY 2024 program initiation briefing to the Milestone Decision Authority, the C-sUAS programs were approved for entry into the MCA pathway at post-Full Rate Production (FRP). Enduring programs are required to develop, test, evaluate, and continuously integrate solutions, to address a rapidly-emerging UAS threat that continues to grow in sophistication, range, lethality, and numbers. Both Joint and Army RDTE will develop Joint and Army-unique solutions that will be procured under this budget line. Prior C-UAS procurement funding resides in line item 0173BZ0501 Indirect Fire Protection Family of Systems.

Justification

Justification — COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS)

FY 2026 funding was realigned from Budget Activity (BA) 2, AD0500 COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS) to BA 6, I24000 COUNTER-SMALL UNMANNED AERIAL SYSTEM (C-SUAS) in support of Agile Portfolio Management: AD0511 C-SUAS FIXED transferred to I24013 C-SUAS FIXED SITE AD0512 C-SUAS OPERATIONAL transferred to I24014 C-SUAS OPERATIONS AD0513 C-SUAS GROUND READINESS transferred to I24015 C-SUAS GRND READINESS

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$628.1M
Other Procurement, ArmyAFY25 Enacted$288.4M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 Total
Program Element$1.01B$628.1M$288.4M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

Showing 25 of 74 from the Senate LDA disclosure database.

BAE SYSTEMS INCCOUNTER|UNMANNED2026matched 2+ title words

National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…

BAE SYSTEMS INCCOUNTER|UNMANNED2026matched 2+ title words

National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…

BOEING COMPANYUNMANNED|AERIAL2026matched 2+ title words

H.R.4213 - Department of Homeland Security Appropriations Act, 2026. H.R.7147 - Further Additional Continuing…

BOEING COMPANYUNMANNED|AERIAL2026matched 2+ title words

H.R.7273 - NASA Reauthorization Act of 2026. S.933 - NASA Transition Authorization Act of 2025. FY27 Commerce…

DELTA BLACK AEROSPACEUNMANNED|AERIAL2026matched 2+ title words

Issues associated with funding development of long endurance unmanned aerial systems in H.R. 9495 FY27 Defense…

GENERAL ATOMICSCOUNTER|UNMANNED|AERIAL2026matched 2+ title words

FY27 National Defense Authorization Act (HR 8800 / S 4784) and FY27 Department of Defense Appropriations Bill (HR…

GENERAL ATOMICSCOUNTER|UNMANNED|AERIAL2026matched 2+ title words

Department of Defense Appropriations Act and National Defense Authorization Act, provisions related to unmanned aerial…

GENERAL ATOMICS AERONAUTICAL SYSTEMSUNMANNED|AERIAL2026matched 2+ title words

Funding issues related to unmanned aerial vehicles (UAVs) and unmanned aerial systems (UASs); FY2026 Department of…

GENERAL ATOMICS AERONAUTICAL SYSTEMSUNMANNED|AERIAL2026matched 2+ title words

Funding issues related to unmanned aerial vehicles (UAVs) and unmanned aerial systems (UASs); FY2027 National Defense…

HONEYWELL AEROSPACE US LLCUNMANNED|AERIAL2026matched 2+ title words

ALERT Act (H.R.7613) Aviation Navigation data bases Safe Air on Airplanes Act (H.R.4994) Issues related to…

HONEYWELL INTERNATIONALUNMANNED|AERIAL2026matched 2+ title words

Issues related to classification of certain aerospace components for export licensing purposes Helicopter terrain…

HONEYWELL INTERNATIONALUNMANNED|AERIAL2026matched 2+ title words

Issues related to classification of certain aerospace components for export licensing purposes Helicopter terrain…

KONGSBERG DEFENSE & AEROSPACE, INC.COUNTER|UNMANNED|AERIAL2026matched 2+ title words

Issues relating to industrial base resilience, missiles, missile defense, counter-unmanned aerial systems, remote…

KONGSBERG DEFENSE & AEROSPACE, INC.COUNTER|UNMANNED|AERIAL2026matched 2+ title words

Issues relating to industrial base resilience, missiles, missile defense, counter-unmanned aerial systems, remote…

RTX CORPORATION AND AFFILIATESCOUNTER|UNMANNED|AERIAL2026matched 2+ title words

P.L. 119-60 - National Defense Authorization Act FY26, National Defense Authorization Act FY27 (bills pending)…

RTX CORPORATION AND AFFILIATESCOUNTER|UNMANNED|AERIAL2026matched 2+ title words

H.R. 8800/S. 4784 - National Defense Authorization Act FY27, H.R. 9495 - Department of Defense Appropriations Act FY27…

SCIENCE APPLICATIONS INTERNATIONAL CORPORATIONCOUNTER|UNMANNED|AERIAL2026matched 2+ title words

S.2296 - National Defense Authorization Act for Fiscal Year 2026 H.R. 3838, the Streamlining Procurement for Effective…

SCIENCE APPLICATIONS INTERNATIONAL CORPORATIONCOUNTER|UNMANNED|AERIAL2026matched 2+ title words

National Defense Authorization Act for Fiscal Year 2027 JADC2 Cybersecurity. Cloud Acquisition policy/funding; DoD…

BOEING COMPANYUNMANNED|AERIAL2025matched 2+ title words

H.R.1 - One Big Beautiful Bill Act and implementation (P.L.119-21). H.R.5342 & S.2354 - Commerce, Justice, Science and…

BOEING COMPANYUNMANNED|AERIAL2025matched 2+ title words

H.R.1 - One Big Beautiful Bill Act. H.Con.Res.14 & S.Con.Res.7 - Concurrent Resolution on the Budget for Fiscal Year…

BOEING COMPANYUNMANNED|AERIAL2025matched 2+ title words

Spectrum, to include 5G. Certification. Commercial aviation. Aviation quality and safety. Advanced aviation…

BOEING COMPANYUNMANNED|AERIAL2025matched 2+ title words

H.R.5342 & S.2354 - Commerce, Justice, Science and Related Agencies Appropriations Act, 2026. H.R.4552 & S.2465…

GENERAL ATOMICSCOUNTER|UNMANNED|AERIAL2025matched 2+ title words

Department of Defense Appropriations Act and National Defense Authorization Act, provisions related to unmanned aerial…

GENERAL ATOMICSCOUNTER|UNMANNED|AERIAL2025matched 2+ title words

Department of Defense Appropriations Act and National Defense Authorization Act, provisions related to unmanned aerial…

GENERAL ATOMICSCOUNTER|UNMANNED|AERIAL2025matched 2+ title words

Department of Defense Appropriations Act and National Defense Authorization Act, provisions related to unmanned aerial…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.