Printed from https://fiscalreceipts.com/program/0207163N/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Advanced Medium Range Air-to-Air Missile (AMRAAM)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $28.8M |
| FY25 | $29.6M |
| FY26 | $26.3M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $9.82M | $30.2M | $34.0M | $29.5M | $27.7M | $33.3M | $39.3M | $31.8M | $30.4M | $28.8M | ||
| Enacted | $32.2M | $40.4M | $25.4M | $28.2M | $34.2M | $40.3M | $32.6M | $30.9M | $29.2M | $29.6M | ||
| Request | $40.4M | $25.4M | $32.5M | $39.0M | $44.3M | $32.6M | $30.9M | $29.2M | $29.6M | $26.3M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2017 book requested $40.4M for FY2017; the PB2019 book reported $34.0M as actual total obligation authority — $6.34M below the request. 34.0 − 40.3 = -6.3 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — AMRAAM
The Advanced Medium Range Air-to-Air Missile (AMRAAM) is a joint Air Force/Navy, Acquisition Category 1C program with Air Force as lead service. AMRAAM is the premier all-weather, all-environment, radar guided missile with improved capabilities against very low and high-altitude targets in an electronic attack environment. The current AMRAAM variant, the AIM-120D, delivers improved performance via Global Positioning System (GPS) aided navigation; two way datalink capability for enhanced aircrew survivability and improved network compatibility; and incorporates new guidance software that improves kinematic performance and weapon effectiveness. This Air Force/Navy program is structured in response to the Joint Service Operational Requirement Document and Mission Element Need Statement to develop an air superiority air-to-air missile with significant improvements in operational utility and combat effectiveness. The development program enhances AMRAAM capability and operational flexibility against current and projected threats, incorporates high payoff technology development, performs risk reduction activities, and investigates new variants and/or alternate missions that may use AMRAAM attributes. To maximize effectiveness of existing inventory and address findings from the field, the Navy and Air Force also develop, test, and field improvements via software upgrades into fielded missiles, and/or hardware upgrades inserted into the production line. This program supports the integration of the AMRAAM into Navy aircraft with analysis of Navy unique applications, aircraft missile integration tasks, product improvement efforts including missile software upgrade development and procurement of hardware to support Navy test and evaluation tasks. Funding in FY 2026 through FY 2030 supports System Improvement Program (SIP) and Navy unique Test & Evaluation for software fielding. This program is funded under OPERATIONAL SYSTEMS DEVELOPMENT because it includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate funding in the current or subsequent fiscal year. Cost to Complete: $222.716M
Mission — AMRAAM
This Air Force/Navy program is structured in response to the Joint Service Operational Requirement Document and Mission Element Need Statement to develop an air superiority air-to- air missile with significant improvements in operational utility and combat effectiveness. This program supports the integration of AMRAAM into Navy aircraft with analysis of Navy unique applications, aircraft missile integration tasks, product improvement efforts including missile software upgrade development and procurement of hardware to support Navy test and evaluation tasks. Funding in FY 2024 through FY 2030 supports System Improvement Program (SIP) and Navy unique Test & Evaluation (T&E) for software fielding.
Justification
Accomplishments & Planned Programs (2)
Test and Evaluation
Continue to execute test and evaluation activities to include Developmental Test (DT), Integrated Test (IT), and Operational Test (OT). Continue associated government support required to ensure AIM-120 missile integration with Department of the Navy aircraft platforms (F/A-18 C/D/E/F/G, AV-8B and F-35), and hardware-in-the loop facility operations.
System Improvement Program (SIP) Efforts
Continuation of SIP Risk Reduction efforts for the AMRAAM weapons system. Efforts include systems engineering, program management, missile software and/or hardware upgrades to increase capability, survivability, lethality, as well as aircraft Operational Flight Profile updates on a recurring basis. AIM-120D-3 SIP-4 will exploit new Form, Fit, Function Refresh (F3R) hardware to maximize missile performance. AIM-120D SIP-3 Tape 2 will address newly matured capabilities, emerging threats, and OT deficiencies. AIM-120D-3 SIP-5 will increase heart of the envelope performance and address an expanded threat space. SIP-3 Tape 3 will continue to mature follow on development increments to basic capabilities added to in SIP-3 Tape 2 and other known deficiencies. Candidate Selection Process (CSP) analyzes warfighter priority deficiencies and enhancements to feed risk reduction efforts and future SIP efforts.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $28.8M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $29.6M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $29.6M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $26.3M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $26.3M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $385.0M | $28.8M | $29.6M | $26.3M | $26.3M |
| 0981: AMRAAM | $385.0M | $28.8M | $29.6M | $26.3M | $26.3M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Advanced Medium Range Air-to-Air Missile (AMRAAM). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J477
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J427
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J459
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J478
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J489
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J498
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J464
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J457
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J451
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J459
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil