Printed from https://fiscalreceipts.com/program/0206624M/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Marine Corps Combat Services Support
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $28.5M
- FY25
- $33.6M
- FY26
- $20.4M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $18.2M | $23.4M | $11.6M | $24.9M | $27.6M | $28.9M | $9.83M | $20.3M | $25.1M | $28.5M | ||
| Enacted | $20.0M | $13.2M | $25.3M | $29.9M | $44.5M | $10.4M | $21.2M | $26.5M | $27.8M | $33.6M | ||
| Request | $13.2M | $25.3M | $30.2M | $37.8M | $10.4M | $13.2M | $26.5M | $27.8M | $33.6M | $20.4M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2020 book requested $37.8M for FY2020; the PB2022 book reports $28.9M actually spent — $8.87M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Testing Measuring Diag Equip & SE
The Family of Automatic Test Systems (ATS) provides organic test capabilities for use by Marine Corps maintainers in garrison and deployed environments to support activities aligned to condition/predictive based maintenance, equipment diagnostics, and fault isolation on multiple platforms such as radio test sets that will be employed in the Expeditionary Advanced Base Operations (EABO) and littoral operational environment. ATS funding strategy supports Force Design initiatives and EABO by providing automatic test capabilities to the lowest level possible in order diagnose/repair as forward as possible. Conditions Based Maintenance (CBM+) is a maintenance strategy that seeks to collect, transmit, store, analyze and act on data from sensors on platform and historic maintenance data in GCSS-MC. The program provides data logging hardware to install on platforms in garrison, employed in the Expeditionary Advanced Base Operations (EABO) and in littoral operational environments. The Program also provides predictive analytics software that transforms maintenance and sensor data into valuable user insights IOT enable data driven solutions to maintenance and supply issues at all levels of the Marine Corps enterprise.
Mission — Marine Corps Cmbt Services Supt
This program element (PE) provides funding for Marine Air-Ground Task Force requirements for Combat Service Support equipment improvement. It will enhance combat breaching capabilities of the ground combat elements, logistics, maintenance and transportation. The PE also provides improvements in all areas of Combat Service Support Equipment Vehicles by determining the replacement for the light fleet of vehicles. This includes projects such as: Alternative Power Sources for Communications Equipment which is a suite of devices that provide the commander with the capability to use existing power to operate his communication equipment, computers and peripheral equipment instead of using batteries or fossil fuel generators; the Marine Corps Family of Automatic Test Systems, formerly TETS, which provides automatic testing capability for use by technicians both in garrison and forward edge of the battlefield; improvements in all areas of the LVSR & MTVR; the High Performance Capabilities for Military Vehicles Project which is dedicated to applying the best practices of the motor sports industry to military vehicles including engineering expertise, equipment, and technology.
Mission — Combat Service Support Eng Equip
Engineer Mods and Tool Kits: The Engineer Mods and Tool Kits line funds modifications and initiatives which are required to address operational priorities, engineering change proposals, safety concerns, support equipment inefficiencies, product quality deficiencies, and other issues that affect equipment reliability, availability, and readiness. This approach ensures proper equipment sustainment and life cycle management in response to evolving needs of the Marine Corps fleet. Operational needs to provide personnel survivability on engineer equipment is essential to current and future operations. Research and development funding develops and integrates new lighter, compact armor technology, and supports ballistic testing for applications to existing and future acquisitions. Corrosion Prevention and Control (CPAC): The useful life of Marine Corps assets will be extended through a comprehensive CPAC RDT&E program aimed at identifying and certifying new corrosion control products, materials, processes, and procedures for legacy and new acquisitions. The CPAC RDT&E Program works to standardize and substantially improve strategies, objectives, and processes to prevent, detect, and treat corrosion and its impacts on Marine Corps ground vehicles and weapons systems. This mission responds to the Congressional directives, DoD, and SECNAV instruction to reduce the negative operational effects of corrosion and reduce associated total ownership cost of Marine Corps ground equipment and weapons systems. Family of Explosive Ordnance Disposal Equipment (FEOD): Funding supports the Rapid Statement of Need (RSON) development, testing, and evaluation of the Littoral Explosive Ordnance Neutralization (LEON) Payload under-water robot systems to locate, identify, and neutralize those threats. Explosive Hazard Defeat System (EHDS): Funding supports development, testing, and evaluation of USMC Full Force Design Enhancements to locate, avoid, or neutralize explosive threats.
Mission — Motor Transport Mod
The Medium Tactical Vehicle Replacement (MTVR) Modification program line funds numerous modifications and initiatives required to address operational priorities, engineering change proposals (ECP), safety concerns, related travel, support equipment and other issues that affect vehicle reliability, availability, maintainability, readiness, as well as the Medium Tactical Truck (MTT). A proactive and focused approach ensures proper vehicle life-cycle management allowing the program to develop and implement improvements as required to respond to the evolving needs of the Marine Corps. MTVR funding also supports MTT prototyping efforts that will determine maturity of technology advancement within the scope of industry production capabilities while maintaining effectiveness and suitability in operational environments. The intended purpose of the MTT prototype effort is informing requirements and cost in support of a future MTVR replacement program (MTT). The Marine Corps Tactical Motor Transport Modification (MTM) Light Tactical Vehicle Modification (LTVM) project manages life cycle sustainment for the light fleet vehicle and tactical trailer principal end items. A sustained effort is maintained in the Marine Corps for development and testing in support of the light tactical vehicle quality deficiency resolutions, technology and safety initiatives and environmental/state transportation mandated vehicle changes. The Family of Medium/Heavy Tactical Trailers & Ancillary Equipment (FT&AE) management strategy will use RDT&E funding to explore new technology, and support related travel, that can be used to achieve optimum lift within the desired weight and cube constraints in support of the "Lightening the MAGTF" initiative, as well as improving capabilities, to include re-engineering the ground clearance on various trailers to improve off-road mobility. Transportation and expeditionary goals will be considered in the research and development for the medium/heavy trailer fleet to include (but not limited to) the M1076 PLS (Palletized Load System) Trailer, MK1077 Flatrack, MK593 6 Ton Cargo Trailer, M870 40/50 Ton Low Bed, MK970 Tactical Refueler, M149A2 400 Gallon Water Tank Trailer, M353 3.5 Ton General Purpose Trailers, and the Flatrack Refueler Capability (FRC). The Family of Logistics Vehicle System Replacement (LVSR) is the Marine Air-Ground Task Force (MAGTF) Heavy Lift Capability system. This line funds numerous modifications and initiatives that are required to address operational priorities, engineering change proposals, safety concerns, related travel, support equipment and other issues that affect vehicle reliability, availability, maintainability and readiness. A proactive and focused approach ensures proper vehicle life-cycle management and allows the flexibility to develop and implement improvements as required to respond to the evolving needs of the Marine Corps. The Family of P-19 Replacement (P-19R) replaced the obsolete A/S32P-19A Crash Fire Rescue fleet in support of expeditionary airfield operations and the supporting establishment. The vehicle is outfitted with advanced fire suppression equipment. It provides rescue and aircraft firefighting capabilities to permanent and expeditionary airfields throughout the Marine Corps. The P-19R is also employed to fight structural fires in support of base camps and as firefighting support to other elements of the Marine Air Ground Task Force (MAGTF), such as ammunition supply points, Petroleum, Oil and Lubricant (POL) distribution points or hazardous material storage facilities. P-19R funding will support ECP efforts, testing and analysis, and related travel needed in order to improve firefighting capabilities. ECPs, such as the Forward Looking Infrared (FLIR) and Non-Fluorine Film Forming Foam, will improve visibility, environmental safety, and effectiveness related to the vehicle.
Mission — MAGTF CSSE & SE
The Family of Mobile Power Systems (MPS) provides ruggedized power generation, distribution, and storage systems, battery charging units, and environmental control equipment to enable energy resilience, security, and optimization to logistically contested environments. Further, MPS extends the combat reach of critical weapons, surveillance, optics, radars, and life support capabilities that are key to successful Expeditionary Advanced Basing Operations.
Mission — Congressional Adds
Family of Explosive Ordnance Disposal Equipment (FEOD): Funding supports the Rapid Statement of Need (RSON) development, testing, and evaluation of the Littoral Explosive Ordnance Neutralization (LEON) Payload under-water robot systems to locate, identify, and neutralize threats. LEON provides a suite of systems that will enable EOD Technicians to clear and mark lanes of explosive threats in the littoral regions.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $28.5M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $33.6M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $33.6M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $20.4M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $20.4M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| 9999: Congressional Adds | $0 | $2.32M | $0 | $0 | $0 |
| 2929: Testing Measuring Diag Equip & SE | $14.6M | $1.04M | $4.11M | $714.0K | $714.0K |
| 2510: MAGTF CSSE & SE | $58.4M | $7.47M | $6.27M | $838.0K | $838.0K |
| 2509: Motor Transport Mod | $62.9M | $11.9M | $19.2M | $8.34M | $8.34M |
| 2316: Combat Service Support Eng Equip | $130.2M | $5.75M | $4.08M | $10.5M | $10.5M |
| Program Element | $266.1M | $28.5M | $33.6M | $20.4M | $20.4M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →