Skip to content
Fiscal Receipts

Guided Multiple-Launch Rocket System (GMLRS)

ArmyRDT&EReconciledPE0205778A
What it is
Guided Multiple-Launch Rocket System (GMLRS) (0205778A) is an Army research & development line funded in the Research, Development, Test and Evaluation, Army account. Its J-book detail breaks the line into 3 projects.
What changed
+$12.7M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$70.8MR-1 TOA · PB2026
FY25 Total
$20.6MR-1 TOA · PB2026
FY26 Request
$33.3MR-1 TOA · PB2026
FY25→26 Change
+$12.7MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $70.8MFY25: $20.6MFY26: $33.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$70.8M
FY25$20.6M
FY26$33.3M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$43.8M$36.0M$21.2M$93.9M$113.5M$112.5M$72.8M$58.5M$19.4M$70.8M
Enacted$36.7M$38.0M$102.8M$119.0M$117.3M$72.8M$60.7M$20.2M$76.0M$20.6M
Request$22.0M$102.8M$154.1M$138.6M$75.6M$63.9M$20.2M$76.0M$20.6M$33.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2019 book requested $154.1M for FY2019; the PB2021 book reported $113.5M as actual total obligation authority — $40.6M below the request. 113.5 − 154.1 = -40.6 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Guided Multiple-Launch Rocket System (GMLRS)

Guided Multiple-Launch Rocket System (GMLRS) rockets are surface-to-surface artillery rockets fired from the Multiple Launch Rocket System (MLRS) and High Mobility Artillery Rocket System (HIMARS) launchers. GMLRS rockets provide 24/7, all-weather precision fires to engage both area and point targets at short, medium, and long ranges. The GMLRS Program currently consists of multiple variants: GMLRS Unitary utilizes a 200-pound high explosive warhead to engage point targets with limited collateral damage; GMLRS Dual Purpose Improved Conventional Munition (DPICM) cluster munition to engage area or imprecisely located targets; and GMLRS Alternative Warhead (AW) which has been developed as a non-cluster munition to engage the same target set as GMLRS DPICM. GMLRS DPICM Production was terminated in response to the June 2008 Department of Defense (DoD) Cluster Munitions Policy. GMLRS Unitary and AW are currently in full rate production. The GMLRS program will continue to leverage ongoing Government and Industry research and development efforts to extend range, increase survivability, and enhance lethality. The GMLRS program includes a modification that extends the maximum range (Extended Range (ER) GMLRS) and is capable of carrying both the Unitary and AW warheads. The GMLRS program also includes an Enhanced Alternative Warhead (EAW) modification that will service the existing GMLRS and ER-GMLRS AW targets while adding capability against light and medium armored vehicles. The GMLRS program is a component of an integrated fires development effort that includes survivability, resiliency, and effectiveness improvements against advanced threats from near-peer adversaries. These efforts include integration with an evolving common fires mission command, common development tools and processes, and annual test and evaluation to provide data to support program assessments and progress toward closure of performance gaps. GMLRS is part of the Army Transformation Initiative. The munitions developed under this funding line are part of the MLRS Family of Munitions (MFOM) that are deployed by the M142 HIMARS and M270 MLRS launchers. Project DL1: Completes ER-GMLRS system development and qualification with redesigned side mounted proximity sensor. DL1 also funds the Enhanced Alternative Warhead (EAW) system development and qualification. EAW system level qualification, integration, and test completes initially with standard range GMLRS rockets prior to integration of EAW into ER-GMLRS. Project EG2: The U.S. Army initially funded the development of the Guided Multiple Launch Rocket System (GMLRS) Alternative Warhead (AW) increment under this project code. Project EG3: Guided MLRS funding line supports GMLRS enhancements including development of Assured Position, Navigation, and Timing (APNT). The FY 2026 request was reduced by $0.043 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Mission — Extended Range GMLRS

The DL1 project code funds efforts to enhance Extended Range Guided Multiple Launch Rocket System (ER-GMLRS) rockets and common components under Project DL1: Extended Range GMLRS. The Army is requesting funding for ER-GMLRS Research, Development, Test and Evaluation (RDT&E) development, integration, and test activities to enhance operational capabilities including increased range, improved lethality and survivability, enhanced flight performance, and Assured Positioning, Navigation and Timing (APNT). FY 2026 dollars in the amount of $30.776 million will fund system level qualification of the ER-GMLRS with a redesigned Side Mounted Proximity Sensor and the Enhanced Alternative Warhead.

Mission — GMLRS Alternative Warheads

Continuation of the EAW qualification effort beyond FY 2024 is funded under Projects EG3 / Guided MLRS and DL1 / Extended Range GMLRS. The U.S. Army initially funded the development of the Guided Multiple Launch Rocket System (GMLRS) Alternative Warhead (AW) increment under the Project EG2: GMLRS Alternative Warheads project code. GMLRS AW entered full rate production in 2015. The 26 October 2016 Deputy Secretary's Management Action Group (DMAG) directed the Army to define and execute an effort for a GMLRS modification that would integrate a seeker into the rocket. The Army prioritized integration of an Enhanced Alternative Warhead (EAW) into a standard range GMLRS rocket over continuation of the seeker spiral.

Mission — Guided MLRS

The U.S. Army continues to explore ways to enhance Guided Multiple Launch Rocket System (GMLRS) rockets and common components under Project EG3: Guided MLRS. The Army is requesting funding for GMLRS Research, Development, Test and Evaluation (RDT&E) development, integration, and test activities to enhance operational capabilities including increased range, improved lethality and survivability, enhanced flight performance, and Assured Positioning, Navigation and Timing (APNT). FY 2026 dollars in the amount of $2.531 million will fund continuation of APNT development activities.

Justification

Accomplishments & Planned Programs (7)

ER-GMLRS Development & Qualification (redesign SMPS)

Flight testing in FY 2024 revealed thermal issues with the Side Mounted Proximity Sensor (SMPS) requiring a component redesign. The system qualification will complete in FY 2026.

Enhanced Alternative Warhead Qualification

The EAW effort modifies the AW warhead, proximity sensor, and warhead fuze for increased lethality against light and medium armored targets. The EAW shall be integrated into both GMLRS and ER-GMLRS rockets.

Enhanced Alternative Warhead

The Enhanced Alternative Warhead effort modifies the AW warhead, proximity sensor, and warhead fuze for increased lethality against light and medium armored targets.

GMLRS enhancements

The Enhanced Alternative Warhead effort modifies the AW warhead, proximity sensor, and warhead fuze for increased lethality against light and medium armored targets.

GMLRS Assured Position Navigation and Timing (APNT)

Address requirements related to maintaining accuracy in a contested environment, improving accuracy over longer ranges, and compliance with statutory GPS requirements.

Extended Range (ER) GMLRS development

Flight testing in FY 2024 revealed thermal issues with the Side Mounted Proximity Sensor (SMPS) requiring a component redesign. The component redesign and system qualification will complete in FY 2026.

SBIR/STTR Transfer

Funding transferred in accordance with Title 15 USC §638.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$70.8M
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$20.6M
Research, Development, Test and Evaluation, ArmyAFY25 Total$20.6M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$33.3M
Research, Development, Test and Evaluation, ArmyAFY26 Total$33.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$70.8M$20.6M$33.3M$33.3M
DL1: Extended Range GMLRS——$30.8M$30.8M
EG3: Guided MLRS$47.3M$20.6M$2.53M$2.53M
EG2: GMLRS Alternative Warheads$23.5M———

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

12 mentions from the Senate LDA disclosure database.

UNITED LAUNCH ALLIANCELaunch|Rocket2026matched 2+ title words

Appropriations funding and language for space launch enterprise and alternative rocket technologies.

UNITED LAUNCH ALLIANCELaunch|Rocket2026matched 2+ title words

Appropriations funding and language for space launch enterprise and alternative rocket technologies.

UNITED LAUNCH ALLIANCELaunch|Rocket2025matched 2+ title words

Appropriations funding and language for space launch enterprise and alternative rocket technologies.

UNITED LAUNCH ALLIANCELaunch|Rocket2025matched 2+ title words

Appropriations funding and language for space launch enterprise and alternative rocket technologies.

UNITED LAUNCH ALLIANCELaunch|Rocket2025matched 2+ title words

Appropriations funding and language for space launch enterprise and alternative rocket technologies.

UNITED LAUNCH ALLIANCELaunch|Rocket2025matched 2+ title words

Appropriations funding and language for space launch enterprise and alternative rocket technologies.

SPACE EXPLORATION TECHNOLOGIES CORP.Launch|Rocket2024matched 2+ title words

Meetings with officials regarding space launch and high-speed satellite internet issues.

SPACE EXPLORATION TECHNOLOGIES CORP.Launch|Rocket2024matched 2+ title words

Meetings with officials regarding space launch and high-speed satellite internet issues.

SPACE EXPLORATION TECHNOLOGIES CORP.Launch|Rocket2024matched 2+ title words

Meetings with officials regarding space launch and high-speed satellite internet issues.

SPACE EXPLORATION TECHNOLOGIES CORP.Launch|Rocket2024matched 2+ title words

Meetings with officials regarding space launch and high-speed satellite internet issues.

UNITED LAUNCH ALLIANCELaunch|Rocket2024matched 2+ title words

Additional appropriations funding and language for space launch enterprise and alternative rocket technologies.

UNITED LAUNCH ALLIANCELaunch|Rocket2024matched 2+ title words

Additional appropriations funding and language for space launch enterprise and alternative rocket technologies.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Guided Multiple-Launch Rocket System (GMLRS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.