Printed from https://fiscalreceipts.com/program/0205778A/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Guided Multiple-Launch Rocket System (GMLRS)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $70.8M |
| FY25 | $20.6M |
| FY26 | $33.3M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $43.8M | $36.0M | $21.2M | $93.9M | $113.5M | $112.5M | $72.8M | $58.5M | $19.4M | $70.8M | ||
| Enacted | $36.7M | $38.0M | $102.8M | $119.0M | $117.3M | $72.8M | $60.7M | $20.2M | $76.0M | $20.6M | ||
| Request | $22.0M | $102.8M | $154.1M | $138.6M | $75.6M | $63.9M | $20.2M | $76.0M | $20.6M | $33.3M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2019 book requested $154.1M for FY2019; the PB2021 book reported $113.5M as actual total obligation authority — $40.6M below the request. 113.5 − 154.1 = -40.6 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Guided Multiple-Launch Rocket System (GMLRS)
Guided Multiple-Launch Rocket System (GMLRS) rockets are surface-to-surface artillery rockets fired from the Multiple Launch Rocket System (MLRS) and High Mobility Artillery Rocket System (HIMARS) launchers. GMLRS rockets provide 24/7, all-weather precision fires to engage both area and point targets at short, medium, and long ranges. The GMLRS Program currently consists of multiple variants: GMLRS Unitary utilizes a 200-pound high explosive warhead to engage point targets with limited collateral damage; GMLRS Dual Purpose Improved Conventional Munition (DPICM) cluster munition to engage area or imprecisely located targets; and GMLRS Alternative Warhead (AW) which has been developed as a non-cluster munition to engage the same target set as GMLRS DPICM. GMLRS DPICM Production was terminated in response to the June 2008 Department of Defense (DoD) Cluster Munitions Policy. GMLRS Unitary and AW are currently in full rate production. The GMLRS program will continue to leverage ongoing Government and Industry research and development efforts to extend range, increase survivability, and enhance lethality. The GMLRS program includes a modification that extends the maximum range (Extended Range (ER) GMLRS) and is capable of carrying both the Unitary and AW warheads. The GMLRS program also includes an Enhanced Alternative Warhead (EAW) modification that will service the existing GMLRS and ER-GMLRS AW targets while adding capability against light and medium armored vehicles. The GMLRS program is a component of an integrated fires development effort that includes survivability, resiliency, and effectiveness improvements against advanced threats from near-peer adversaries. These efforts include integration with an evolving common fires mission command, common development tools and processes, and annual test and evaluation to provide data to support program assessments and progress toward closure of performance gaps. GMLRS is part of the Army Transformation Initiative. The munitions developed under this funding line are part of the MLRS Family of Munitions (MFOM) that are deployed by the M142 HIMARS and M270 MLRS launchers. Project DL1: Completes ER-GMLRS system development and qualification with redesigned side mounted proximity sensor. DL1 also funds the Enhanced Alternative Warhead (EAW) system development and qualification. EAW system level qualification, integration, and test completes initially with standard range GMLRS rockets prior to integration of EAW into ER-GMLRS. Project EG2: The U.S. Army initially funded the development of the Guided Multiple Launch Rocket System (GMLRS) Alternative Warhead (AW) increment under this project code. Project EG3: Guided MLRS funding line supports GMLRS enhancements including development of Assured Position, Navigation, and Timing (APNT). The FY 2026 request was reduced by $0.043 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Mission — Extended Range GMLRS
The DL1 project code funds efforts to enhance Extended Range Guided Multiple Launch Rocket System (ER-GMLRS) rockets and common components under Project DL1: Extended Range GMLRS. The Army is requesting funding for ER-GMLRS Research, Development, Test and Evaluation (RDT&E) development, integration, and test activities to enhance operational capabilities including increased range, improved lethality and survivability, enhanced flight performance, and Assured Positioning, Navigation and Timing (APNT). FY 2026 dollars in the amount of $30.776 million will fund system level qualification of the ER-GMLRS with a redesigned Side Mounted Proximity Sensor and the Enhanced Alternative Warhead.
Mission — GMLRS Alternative Warheads
Continuation of the EAW qualification effort beyond FY 2024 is funded under Projects EG3 / Guided MLRS and DL1 / Extended Range GMLRS. The U.S. Army initially funded the development of the Guided Multiple Launch Rocket System (GMLRS) Alternative Warhead (AW) increment under the Project EG2: GMLRS Alternative Warheads project code. GMLRS AW entered full rate production in 2015. The 26 October 2016 Deputy Secretary's Management Action Group (DMAG) directed the Army to define and execute an effort for a GMLRS modification that would integrate a seeker into the rocket. The Army prioritized integration of an Enhanced Alternative Warhead (EAW) into a standard range GMLRS rocket over continuation of the seeker spiral.
Mission — Guided MLRS
The U.S. Army continues to explore ways to enhance Guided Multiple Launch Rocket System (GMLRS) rockets and common components under Project EG3: Guided MLRS. The Army is requesting funding for GMLRS Research, Development, Test and Evaluation (RDT&E) development, integration, and test activities to enhance operational capabilities including increased range, improved lethality and survivability, enhanced flight performance, and Assured Positioning, Navigation and Timing (APNT). FY 2026 dollars in the amount of $2.531 million will fund continuation of APNT development activities.
Justification
Accomplishments & Planned Programs (7)
ER-GMLRS Development & Qualification (redesign SMPS)
Flight testing in FY 2024 revealed thermal issues with the Side Mounted Proximity Sensor (SMPS) requiring a component redesign. The system qualification will complete in FY 2026.
Enhanced Alternative Warhead Qualification
The EAW effort modifies the AW warhead, proximity sensor, and warhead fuze for increased lethality against light and medium armored targets. The EAW shall be integrated into both GMLRS and ER-GMLRS rockets.
Enhanced Alternative Warhead
The Enhanced Alternative Warhead effort modifies the AW warhead, proximity sensor, and warhead fuze for increased lethality against light and medium armored targets.
GMLRS enhancements
The Enhanced Alternative Warhead effort modifies the AW warhead, proximity sensor, and warhead fuze for increased lethality against light and medium armored targets.
GMLRS Assured Position Navigation and Timing (APNT)
Address requirements related to maintaining accuracy in a contested environment, improving accuracy over longer ranges, and compliance with statutory GPS requirements.
Extended Range (ER) GMLRS development
Flight testing in FY 2024 revealed thermal issues with the Side Mounted Proximity Sensor (SMPS) requiring a component redesign. The component redesign and system qualification will complete in FY 2026.
SBIR/STTR Transfer
Funding transferred in accordance with Title 15 USC §638.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY24 Actuals | $70.8M |
| Research, Development, Test and Evaluation, Army | A | FY25 Enacted | $20.6M |
| Research, Development, Test and Evaluation, Army | A | FY25 Total | $20.6M |
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $33.3M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $33.3M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $70.8M | $20.6M | $33.3M | $33.3M |
| DL1: Extended Range GMLRS | — | — | $30.8M | $30.8M |
| EG3: Guided MLRS | $47.3M | $20.6M | $2.53M | $2.53M |
| EG2: GMLRS Alternative Warheads | $23.5M | — | — | — |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
12 mentions from the Senate LDA disclosure database.
Appropriations funding and language for space launch enterprise and alternative rocket technologies.
Appropriations funding and language for space launch enterprise and alternative rocket technologies.
Appropriations funding and language for space launch enterprise and alternative rocket technologies.
Appropriations funding and language for space launch enterprise and alternative rocket technologies.
Appropriations funding and language for space launch enterprise and alternative rocket technologies.
Appropriations funding and language for space launch enterprise and alternative rocket technologies.
Meetings with officials regarding space launch and high-speed satellite internet issues.
Meetings with officials regarding space launch and high-speed satellite internet issues.
Meetings with officials regarding space launch and high-speed satellite internet issues.
Meetings with officials regarding space launch and high-speed satellite internet issues.
Additional appropriations funding and language for space launch enterprise and alternative rocket technologies.
Additional appropriations funding and language for space launch enterprise and alternative rocket technologies.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Guided Multiple-Launch Rocket System (GMLRS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J224
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J193
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J212
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J215
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J238
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J247
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J218
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J215
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J214
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J215
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTE - Vol 4 - Budget Activity 6 · www.asafm.army.mil