Skip to content
Fiscal Receipts

MK-48 ADCAP

NavyRDT&EReconciledPE0205632N
What it is
MK-48 ADCAP (0205632N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 2 projects.
What changed
+$39.4M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$202.3MR-1 TOA · PB2026
FY25 Total
$144.9MR-1 TOA · PB2026
FY26 Request
$184.3MR-1 TOA · PB2026
54.2% reconciliation

$84.3M discretionary + $100.0M one-time reconciliation. Discretionary change vs FY2025 enacted: -41.8%.

FY25→26 Change
+$39.4MR-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $184.3M TOA − $84.3M J-book line = 100.0M (184.3 − 84.3 = 100.0) — $100.0M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $202.3MFY25: $144.9MFY26: $184.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$202.3M
FY25$144.9M
FY26$184.3M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$25.9M$47.5M$48.5M$48.7M$66.9M$69.8M$69.4M$98.7M$152.4M$202.3M
Enacted$47.7M$39.1M$68.6M$68.3M$72.3M$70.5M$100.8M$155.9M$213.2M$144.9M
Request$39.1M$68.6M$94.2M$86.0M$110.3M$114.5M$155.9M$213.2M$164.9M$184.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2021 book requested $110.3M for FY2021; the PB2023 book reported $69.4M as actual total obligation authority — $40.9M below the request. 69.4 − 110.3 = -40.9 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — MK-48 ADCAP

The MK 48 ADCAP (Advanced Capability) Research, Development, Test and Evaluation (RDT&E) program executes incremental development of weapon performance improvements in two development product areas:(1) Advanced Processor Builds (APBs) (operational software), and (2) Torpedo Technology Insertions (TIs) (hardware). This Program Element (0205632N/0366) is tied to development programs that leverage a joint United States/Australia Armaments Cooperative Project (ACP) and develop MK 48 ADCAP technologies developed by the Office of Naval Research (ONR) and Strategic Capabilities Office (SCO). The Advanced Processor Builds (APBs) spiral engineering development process provides for continual performance improvements to the torpedo's operational software (OPSW). The Torpedo APB (TAPB) focused development testing and implementation within the APB process is being utilized to address shallow water as a critical operating area to counter near-peer adversaries and third world diesel electric submarines. In-water testing, in conjunction with laboratory simulation efforts, has shown that significant performance improvements can be made by implementing changes to weapon tactics and software algorithms. The TAPB program also leverages the Royal Australian Navy (RAN) joint torpedo program and technologies developed by ONR and SCO in the areas of torpedo broadband signal processing, tactics processing, and alertment. Torpedo Technology Insertions (TIs) will provide for significant torpedo hardware improvements and upgrades, including the transition and testing of advanced technologies from the R&D community. This approach will incorporate manufacturing development, integration and testing of transitioning technologies from ONR and SCO for ADCAP upgrades in the areas of torpedo sensors, energetics, propulsion, weapon/platform connectivity, and improved fusing. These efforts will continue torpedo development investment at a lower cost and shorter term than traditional torpedo programs. The MK 48 MOD 8 (APB 6/TI-1) Heavyweight Torpedo (HWT) program is a significant upgrade to the MK 48 MOD 7 HWT which will consist of an operational software upgrade referred to as APB 6 and a hardware upgrade referred to as TI-1. TI-1 will include a Guidance and Control (G&C) section upgrade including a new Sonar Assembly (higher density array, transmitter, receiver), and an Improved Post Launch Communications System (IPLCS). IPLCS will replace the existing copper guidance wire with fiber optics. These improvements are needed for increased performance in the presence of advanced countermeasures, shallow water, low Doppler targets, Very Shallow Water (VSW), improve fuzing, and Anti Surface Warfare (ASuW). TI-1 will also include features from three ONR Future Naval Capabilities (FNC) programs. The MK 48 MOD 9 (APB 7/TI-2) program provides extensive and important hardware and software capability improvements to the MK 48 MOD 7 and MOD 8 heavyweight torpedo (HWT). The capability improvements include a new propulsion system for increased range and advance sensing capabilities against surface and subsurface targets. The MK 48 MOD 9 (APB 7/TI-2) provides distinctly different capabilities than the MK 48 MOD 8 (APB 6/TI-1) and is intended for different operational missions. The MK 48 MOD 9 software improvements consist of the APB 7 software and algorithm upgrades for advance sensing and processing capabilities. The MK 48 MOD 9 hardware improvements consist of TI-2 hardware upgrades replacing the legacy Otto fuel engine with the Stored Chemical Energy Propulsion System (SCEPS) for increased range. The MK48 Afterbody Upgrades program leverages other existing ONR efforts outside of the APB and TI programs to identify and implement updates including sensing, afterbody performance, and increased Otto fuel range across the MK 48 ADCAP family. The Liberator provides for the development of alternative methods for launching torpedoes or similar devices.

Mission — MK 48 ADCAP

The MK 48 ADCAP (Advanced Capability) Research, Development, Test and Evaluation (RDT&E) program executes incremental development of weapon performance improvements in two development product areas: (1) Advanced Processor Builds (APBs) (operational software), and (2) Torpedo Technology Insertions (TIs) (hardware). This Program Element (0205632N/0366) is tied to development programs that leverage a joint United States/Australia Armaments Cooperative Project (ACP) and develop MK 48 ADCAP technologies developed by the ONR and SCO.

Mission — Congressional Adds

Procure MK 48 MOD 8 test equipment to support MOD 8 development test articles and future production units. Develop and procure MK 48 MOD 9 ADCAP Software Testbed (AST) for MK 48 MOD 8 Guidance & Control (G&C) hardware and software integration with the MK 48 MOD 9 afterbody. Develop and procure Heavyweight Torpedo (HWT) prototyping elements to test and evaluate practical solutions to supply and producibility challenges.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$202.3M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$144.9M
Research, Development, Test and Evaluation, NavyNFY25 Total$144.9M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$84.3M
Research, Development, Test and Evaluation, NavyNFY26 Reconciliation$100.0M
Research, Development, Test and Evaluation, NavyNFY26 Total$184.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$451.9M$202.3M$144.9M$84.3M$84.3M
0366: MK 48 ADCAP$451.9M$192.5M$144.9M$84.3M$84.3M
9999: Congressional Adds$0$9.84M$0$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not MK-48 ADCAP. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.