Printed from https://fiscalreceipts.com/program/0204413N/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Amphibious Tactical Support Units (Displacement Craft)
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $1.98M
- FY25
- $2.24M
- FY26
- $1.71M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $5.52M | $11.3M | $11.1M | $2.35M | $4.84M | $5.58M | $1.67M | $1.65M | $1.78M | $1.98M | ||
| Enacted | $11.3M | $13.9M | $3.94M | $6.07M | $6.93M | $1.71M | $1.66M | $1.79M | $1.99M | $2.24M | ||
| Request | $13.9M | $3.94M | $6.07M | $6.93M | $1.71M | $1.66M | $1.79M | $1.99M | $2.24M | $1.71M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2017 book requested $13.9M for FY2017; the PB2019 book reports $11.1M actually spent — $2.79M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Amphibious Tactical Supt Units
Landing Craft, Air Cushion (LCAC): Research and development efforts to transfer technologies into functional uses on the current LCACs. Current technology initiatives include sustainability/reliability/readiness/performance analyses, LCAC communication improvements, compliance with Cybersecurity policy regulations, and LCAC Total Ownership Costs (TOC) reduction initiatives. Landing Craft, Utility (LCU 1700): Replacement program for the current LCU 1610 class craft - a class of craft that has exceeded its 25-year planned service life by more than double, average age of craft is over 50-years-old. LCU 1700 will provide similar payload, range, speed, and interoperability. Detail design contract awarded Q2 FY18. NECC Additive Manufacturing: In accordance with the National Defense Strategy (NDS), A Design for Maintaining Maritime Superiority 2.0, and Navy Facility Command (NAVFAC) Strategic Design 2.0, this program provides the Navy with new capabilities to enable resilient and agile logistics thru additive manufacturing (AM). Investing in AM enhances the fleet's ability to conduct operational logistics in a contested environment and ensures logistics supportability across the austere distributed battlespace. AM technology results in increased operational availability, on demand production of critical systems, and supply chain cost savings. This effort will identify critical parts suitable for AM production in the field; identify AM systems appropriate to produce and certify critical parts in the field; analyze and identify AM system implications across doctrine, organization, training, materiel, leadership and education, personnel, facilities and policy (DOTMLPF-P); conduct end-user training, field experimentation, and fleet exercise technology insertion to validate AM system capability and systems integration issues.
Mission — LCAC / LCU 1700
Landing Craft, Air Cushion (LCAC): Research and development efforts to transfer technologies into functional uses on the current LCACs. Ongoing technology initiatives include sustainability/reliability/readiness/performance analyses, LCAC communication improvements, Cybersecurity policy regulations compliance, and LCAC Total Ownership Costs (TOC) reduction initiatives. Landing Craft, Utility (LCU 1700): Replacement program for the current LCU 1610 class craft - a class of craft that has exceeded its 25-year planned service life by more than double, average age of craft is over 50-years-old. LCU 1700 will provide similar payload, range, speed, and interoperability.
Mission — NECC Additive Manufacturing
NECC Additive Manufacturing: In accordance with the National Defense Strategy (NDS), A Design for Maintaining Maritime Superiority 2.0, and Navy Facility Command (NAVFAC) Strategic Design 2.0, this program provides the Navy with new capabilities to enable resilient and agile logistics thru additive manufacturing (AM). Investing in AM enhances the fleet's ability to conduct operational logistics in a contested environment and ensures logistics supportability across the austere distributed battlespace. AM technology results in increased operational availability, on demand production of critical systems, and supply chain cost savings. This effort will identify critical parts suitable for AM production in the field; identify AM systems appropriate to produce and certify critical parts in the field; analyze and identify AM system implications across doctrine, organization, training, materiel, leadership and education, personnel, facilities and policy (DOTMLPF-P); conduct end-user training, field experimentation, and fleet exercise technology insertion to validate AM system capability and systems integration issues.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $1.98M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $2.24M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $2.24M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Reconciliation | $1.71M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $1.71M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| 2477: NECC Additive Manufacturing | $1.48M | $517.0K | $527.0K | $0 | $0 |
| 2231: LCAC / LCU 1700 | $37.6M | $1.47M | $1.71M | $0 | $0 |
| Program Element | $39.1M | $1.98M | $2.24M | $0 | $0 |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →