Skip to content
Fiscal Receipts

Integrated Surveillance System

NavyRDT&EReconciledPE0204311N
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
Integrated Surveillance System (0204311N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 4 projects.
What changed
-$673.0K FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$80.2MR-1 TOA · PB2026
FY25 Total
$72.5MR-1 TOA · PB2026
FY26 Request
$71.8MR-1 TOA · PB2026
FY25→26 Change
-$673.0KR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $80.2MFY25: $72.5MFY26: $71.8MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$80.2M
FY25$72.5M
FY26$71.8M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$72.3M$76.2M$57.0M$55.2M$68.3M$103.4M$112.6M$83.3M$98.4M$80.2M
Enacted$49.6M$58.5M$50.6M$72.0M$103.4M$112.6M$84.0M$98.4M$76.3M$72.5M
Request$58.5M$50.6M$37.0M$88.4M$103.0M$84.3M$68.4M$76.3M$72.5M$71.8M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2019 book requested $37.0M for FY2019; the PB2021 book reported $68.3M as actual total obligation authority — $31.4M above the request. 68.33 − 36.96 = 31.37 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Integrated Surveillance System

The Deployable Surveillance Systems (DSS) project (0344), complementing the Fixed Surveillance System (FSS) and Surveillance Towed Array Sensor System (SURTASS), provides flexible and responsive wide area surveillance to the Theater Anti-Submarine Warfare (TASW) commanders worldwide. DSS will operate as adjunct systems to meet the established FSS and SURTASS missions and to meet additional missions as articulated in the OPNAV Top Level Requirements document and follow-on Course of Action Analysis (COAA) and as dictated by TASW commanders evolving and emergent operational requirements. DSS is comprised of the following systems: Deep Water Passive (DWP), Deep Water Active (DWA), and Mobile Passive Active System (MPAS). Informed by TASW Offset operations and the tailored requirements process, the DSS Middle Tier Acquisition (MTA) Rapid Fielding. Program will focus initially on the DWP increment and associated spiral development updates. Spiral developments to meet the evolving submarine threat will leverage on-going Navy, Defense Advanced Research Projects Agency (DARPA), and small business research efforts including processing and sensor technology. Follow-on increments will be focused on DWA and MPAS, of which MPAS is currently outside the Future Years Defense Program (FYDP). FY26 includes funds for DWA that will provide a rapidly deployable sustained surveillance capability in response to emergent Fleet Undersea Warfare (USW) coverage gaps to include mitigating array outages or platform shortages. The FY 2026 cost of the DSS Middle Tier of Acquisition effort is $12.362 million, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission. The Deployable Surveillance Systems (DSS) project (C384), this project funds further development and prototyping of a candidate for a potential future follow-on DWP program. Project 0766 provides for Integrated Undersea Surveillance Systems (IUSS) Research and Development Projects under the Maritime Surveillance Systems (MSS) Program Office (PEO UWS PMS 485). IUSS provides the Navy with its primary means of submarine detection, both nuclear and diesel. A portion of project 0766 Fixed Surveillance System (FSS) is classified, with details available at a higher classification level. The IUSS Research and Development project (0766) funds Surveillance Towed Array Sensor System (SURTASS) Passive and SURTASS Low Frequency Active (LFA) developments. SURTASS provides the mobile, tactical arm of the Integrated Undersea Surveillance System, providing long range detection and cueing for tactical weapons platforms or other vessels of interest. SURTASS LFA provides an active adjunct capability for IUSS passive and tactical sensors to assist in countering the quieter diesel and nuclear threats of the 2000s and beyond. The LFA tasks are directed at detection of slow quiet threats in harsh littoral waters. Development and improvement continues on the common IUSS processor based on NAVSEA's Acoustic Rapid Commercial Off The Shelf (COTS) Insertion (ARCI) program with a cyclical tech refresh of hardware and software in conjunction with the submarine Advanced Processor Build (APB) process. The IUSS Integrated Common Processor (ICP) has the capability to process and display data from all fixed and mobile underwater systems. The IUSS ICP is used for all new system installations and replaces the legacy systems as they reach end of life and require upgrading. Additionally, SURTASS consolidated on the TB-29A Twin-line array, a variant of the Submarine TB-29A Long line array. This reduced the number of array variants employed by SURTASS from 3 to 1, and enabled development and logistics cost savings by leveraging off the submarine TB-29A program. SURTASS-E provides a SURTASS passive capability packaged into ISO-Vans for mobilization on Vessels of Opportunity (VOOs). It was developed as a CNO Rapid Prototyping, Experimentation, and Demonstration (RPED) program to provide a SURTASS variant that addresses emergent Theater ASW Commander requirements for SURTASS capability. The Surveillance Towed Array Sensor System (SURTASS) Team Trainer (STT) provides SURTASS crews with high fidelity synthetic and live playback training capabilities to support Home Port Training Periods (HPTP) and Pre-Deployment Certification Periods (PDCP). Project 1768 T-ARC(X) is a candidate replacement program for U.S. Navy's only organic undersea cable laying and repair ship, USNS ZEUS (T-ARC 7), which is approaching the end of her extended service life. The ship's main mission is to deploy, repair, and retrieve undersea cables and equipment, with a secondary mission of conducting acoustic, hydrographic and bathymetric surveys.

Mission — Deployable Surveillance Systems

The Deployable Surveillance Systems (DSS) project (0344), complementing the Fixed Surveillance System (FSS) and Surveillance Towed Array Sensor System (SURTASS), provides flexible and responsive wide area surveillance to the Theater Undersea Warfare (TUSW) commanders worldwide. DSS will operate as adjunct systems to meet the established FSS and SURTASS missions and to meet additional missions as articulated in the OPNAV Top Level Requirements documents and follow-on Course of Action Analysis (COAA) and as dictated by TUSW commanders evolving and emergent operational requirements. DSS is comprised of the following systems: Deep Water Passive (DWP) and Deep Water Active (DWA). Informed by TUSW Offset operations and the tailored requirements process, the DSS Middle Tier Acquisition (MTA) Rapid Fielding Program focused initially on the DWP increment and associated spiral development updates. Spiral developments to meet the evolving submarine threat will leverage on-going Navy, Defense Advanced Research Projects Agency (DARPA), and small business research efforts including processing and sensor technology. The follow-on increment is on DWA where FY23-26 includes funds that will provide a rapidly deployable sustained surveillance capability in response to emergent Fleet Undersea Warfare (USW) coverage gaps to include mitigating array outages or platform shortages. FY24 funding will be used to refurbish and update DWA clusters procured in previous years and conduct a fleet demonstration. FY24 funded efforts will be used to (1) prepare the rationale for using a MTA Program for a future DWA program; (2) conduct Fleet demonstrations to validate Top-Level Requirements; and (3) identify full DWA MTA funding requirements. FY25 initiated funding for the DWA MTA Rapid Prototyping Program. FY26 continues funding for DWA MTA Rapid Prototyping Program. The FY 2026 cost of the Deployable Surveillance Systems Middle Tier of Acquisition effort is $12.362 million, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission.

Mission — IUSS Detect/Classif System

A. This project includes efforts for SURTASS, Expeditionary SURTASS (SURTASS-E), Theater Anti-submarine Warfare (ASW) Offset Initiative, and Fixed Surveillance System (FSS). The SURTASS project comprises the mobile, tactical arm of the Integrated Undersea Surveillance System (IUSS), providing long range detection and cueing for tactical weapons platforms against both diesel and nuclear powered submarines. SURTASS also provides the undersea surveillance necessary to support regional conflicts and sea-lane protection. SURTASS has experienced recent passive and active success against diesel submarines operating in shallow water. SURTASS is leveraging existing developments and reducing costs by using Non-Developmental Items and commercial hardware, supporting common Navy Undersea Warfare processing and towed array developments, and increasing operator efficiency through computer-aided detection and classification processing. SURTASS development efforts include Low Frequency Active (LFA)/Compact Low Frequency Active (CLFA) improvements, common IUSS processing, twin-line array development and processing, improved detection and classification/passive automation to counter quieter threats, additional signal processing, integrated active and passive operations, improved Battle Group support, and improved information processing. LFA provides an active adjunct capability for IUSS passive and tactical sensors to counter the quieter diesel and nuclear threats of the 1990s and beyond. The LFA tasks are directed at detection of slow, quiet threats in harsh littoral waters. Improvements include TL-29A/LFA integration enhancements, advanced waveforms for littoral/shallow water operations including Doppler sensitive waveforms, and processing algorithms to reduce clutter and reverberation false alarms in shallow water. The Integrated Common Processor (ICP) is a derivative of the Naval Sea Systems Command (NAVSEA) Submarine Acoustic Rapid Commercial Off the Shelf (COTS) Insertion (ARCI) program and is being augmented for IUSS requirements. Together, the LFA/CLFA improvements, TL-29A, and the ICP support the SURTASS Active Improvement Program. Functional improvements to ICP are delivered to the Fleet in software "builds" while hardware improvements are delivered through the Tech Insertion (TI) process. Software improvements are delivered via the DevSecOps process. Each software update will introduce new capabilities into SURTASS systems. SURTASS participates in the process by contributing algorithms for consideration, supplying peer group members for review of candidate algorithms, participating in test evolutions, and incorporating improved algorithms into operational systems. The TI process, modeled after the NAVSEA Submarine Undersea Warfare (USW) hardware improvement program, delivers processing technology improvements to platforms on roughly a 4-6 year cycle. Hardware upgrades for active and passive arrays and communications systems will also be provided during TI upgrades, but not on a regular planned development cycle as for the processing upgrades. SURTASS-E provides a SURTASS passive capability packaged into ISO-Vans for mobilization on Vessels of Opportunity (VOOs). It was developed as a CNO Rapid Prototyping, Experimentation, and Demonstration (RPED) program to provide a SURTASS variant that addresses emergent Theater ASW Commander requirements for SURTASS capability. The Surveillance Towed Array Sensor System (SURTASS) Team Trainer (STT) provides SURTASS crews with high fidelity synthetic and live playback training capabilities to support Home Port Training Periods (HPTP) and Pre-Deployment Certification Periods (PDCP). B. PEO UWS is involved with the development and maintenance of various IUSS systems. These systems include Fixed Distributed systems (FDS), Fixed Distributed Systems-Commercial (FDS-C), and SURTASS. The existing system architectures, signal processing, contact management, and reporting requirements will be evaluated as well as the requirements for future systems. The cyclical development of the ICP will take advantage of automation advancement, array technology improvements, along with IUSS, submarine, and surface USW system commonality to address these requirements. The FSS portion of 0766 is classified with details available at a higher classification level.

Mission — Ship Plan Development and Design

T-Auxiliary, Repair, Cable (T-ARC) is a candidate replacement program for U.S. Navy's only organic undersea cable laying and repair ship, USNS ZEUS (T-ARC 7), which is approaching the end of her extended service life. The ship's main mission is to deploy, repair, and retrieve undersea cables and equipment, with a secondary mission of towing projectors.

Mission — Congressional Adds

The Deployable Surveillance Systems (DSS) project (C384), complementing the Fixed Surveillance System (FSS) and Surveillance Towed Array Sensor System (SURTASS), provides flexible and responsive wide area surveillance to the Theater Undersea Warfare (TUSW) commanders worldwide. DSS operates as adjunct systems to meet the established FSS and SURTASS missions and to meet additional missions as articulated in the OPNAV Top Level Requirements documents and follow-on Course of Action Analysis (COAA) and as dictated by TUSW commanders evolving and emergent operational requirements. DSS is comprised of the following systems: Deep Water Passive (DWP) and Deep Water Active (DWA). This project funds further development and prototyping of a candidate for a potential future follow-on DWP program.

Justification

Accomplishments & Planned Programs (1)

Classified Effort

The FSS portion of 0766 is classified with details available at a higher classification level.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$80.2M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$72.5M
Research, Development, Test and Evaluation, NavyNFY25 Total$72.5M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$71.8M
Research, Development, Test and Evaluation, NavyNFY26 Total$71.8M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$794.7M$80.2M$72.5M$71.8M$71.8M
0344: Deployable Surveillance Systems$63.5M$10.5M$16.3M$12.4M$12.4M
0766: IUSS Detect/Classif System$692.9M$63.9M$52.1M$59.4M$59.4M
1768: Ship Plan Development and Design$38.3M$1.74M$4.10M$0$0
9999: Congressional Adds$0$4.00M$0$0$0

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 0204311N (Integrated Surveillance System), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 0204311N (Integrated Surveillance System), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNRDT&E appropriation0204311N71.8M FY26N0003923C9000LOCKHEED MARTIN CORPORATION80.7MLockheed Martin CorpVA-10

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
VA-10$80.7M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
LOCKHEED MARTIN CORPORATIONN0003923C9000high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

11 mentions from the Senate LDA disclosure database.

LOCKHEED MARTIN CORPORATIONIntegrated|Surveillance2026matched 2+ title words

S 4874/HR 8800 - National Defense Authorization Act for Fiscal Year 2027 including issues related to aircraft…

MICROSOFT CORPORATIONIntegrated|Surveillance2026matched 2+ title words

S. 4784, H.R. 8880, National Defense Authorization Act. S. 4615, H.R. 9624, Intelligence Authorization Act. Defense…

MICROSOFT CORPORATIONIntegrated|Surveillance2026matched 2+ title words

National Defense Authorization Act (No Bill Number). Intelligence Authorization Act (No Bill Number). Defense…

MICROSOFT CORPORATIONIntegrated|Surveillance2025matched 2+ title words

S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…

MICROSOFT CORPORATIONIntegrated|Surveillance2025matched 2+ title words

S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…

MICROSOFT CORPORATIONIntegrated|Surveillance2025matched 2+ title words

S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…

MICROSOFT CORPORATIONIntegrated|Surveillance2025matched 2+ title words

National Defense Authorization Act (no bill number). Intelligence Authorization Act (no bill number) Defense…

MICROSOFT CORPORATIONIntegrated|Surveillance2024matched 2+ title words

H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…

MICROSOFT CORPORATIONIntegrated|Surveillance2024matched 2+ title words

H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…

MICROSOFT CORPORATIONIntegrated|Surveillance2024matched 2+ title words

H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…

MICROSOFT CORPORATIONIntegrated|Surveillance2024matched 2+ title words

H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Integrated Surveillance System. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.