| Fiscal year | Amount |
|---|---|
| FY24 | $84.2M |
| FY25 | $57.2M |
| FY26 | $87.8M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $75.4M | $84.3M | $84.2M | ||
| Enacted | – | $70.0M | $67.4M | $57.2M | |
| Request | – | – | $67.4M | $58.2M | $87.8M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $67.4M for FY2024; the PB2026 book reported $84.2M as actual total obligation authority — $16.8M above the request. 84.2 − 67.4 = 16.8 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Airborne Rockets, All Types
Combat and training inventory requirements for rocket and rocket components establish the Total Munitions Requirement (TMR) in accordance with the Naval Munitions Requirements process (NMRP). Production is for complete units/operationally configured units to satisfy the requirement of applicable specifications of Airborne Rockets, All types. Airborne Rockets supports both Navy and Marine Corps. The 2.75-inch rocket motor variant can be employed by both rotary and fixed wing platforms in the Close Air Support (CAS), Military Operations in Urban Terrain (MOUT), and counter-Fast Attack Craft/Fast Inshore Attack Craft (counter-FAC/FIAC) mission areas. The 2.75-inch rocket configured with Advanced Precision Kill Weapon System (APKWS) Guidance Sections enable a resilient and precise weapon in support of close combat lethality in complex terrain. The variety of warheads enable fleet users to maintain operational flexibility, better target-mission matching for specific applications and effects, and permit logistic agility. Warheads include the Mk-152 Insensitive Munitions (IM) compliant warhead for shipboard operations with APKWS guidance sections and the M282 Multi-Purpose Penetrator (MPP)warhead. Inert warheads are used extensively when range restrictions preclude live applications. The Smokey Sam Simulator System is a pyrotechnic visual cueing device primarily utilized in aircrew training to mimic a Surface to Air Missile threat. The system is currently qualified for land and at sea use. Rocket Launchers provide guided and unguided rocket launch capability for 2.75 Inch Rockets including the LAU-61 G/A Digital Rocket Launcher (DRL), LAU-61 C/A, and LAU-68 F/A. APKWS is a low-cost Semi Active Laser (SAL) guidance section to enhance the precision of 2.75-inch unguided rockets. APKWS is a small, lightweight, mid-body guidance section that can be assembled with existing unguided rocket components and can be fired from 2.75-inch rocket launchers. Compared to unguided rockets, APKWS sustains Joint Force military advantage by offering greater precision, increased stored kills per aircraft sortie, reduces collateral damage, improves effectiveness against soft and lightly armored targets, Counter Unmanned Aerial Systems (C-UAS) targets utilizing Proximity Fuze, and enhances close combat lethality and crew survivability through increased standoff ranges for platforms both air and afloat. A variety of containers are required to support shipping, handling and storage of all up round rockets and rocket components. The program re-manufactures existing containers and procures new containers as needed. Miscellaneous Items provides for procurement of various rocket components not to exceed a total cost of $0.500M per year per component. Product Improvement (PIP) provides for rapid iterative modifications and upgrades to products within Airborne Rockets, All types. Efforts include configuration changes involving production, engineering, manufacturing, installation and testing that increases system or combat effectiveness to extend the useful military life of an item, and/or to improve the item within the current performance envelope.
Justification
Justification — Airborne Rockets, All Types
FY 2026 baseline funding is required to procure 2.75-inch rocket components - to include rocket motors, warheads, Advanced Precision Kill Weapon System (APKWS) guidance sections, rocket launchers and containers - to enable low-cost area suppression as well as precision engagements from US Marine Corps (USMC) H-1, AV-8B, and F/A-18A-D aircraft in low collateral damage Close Air Support (CAS) operations, and from US Navy (USN) H-60 aircraft to neutralize Fast Attack Craft/Fast Inshore Attack Craft (FAC/FIAC) threats. In addition, FY 2026 Funding is required to address product improvements needed for obsolete components designed and produced over 40 years ago as well as the production engineering and integrated logistics support efforts needed for all 2.75-inch rocket components. Airborne Rockets product improvement efforts are required to reduce production cost, extend component life and to improve Combat effectiveness on pace with platform Combat system improvements. Specific efforts in FY 2026 include but are not limited to launcher improvements, APKWS Multi-Mode Seeker midbody design, longer range motor, MK-706 Container redesign, MK-706 Container refurbishment, and M648 All Up Round container multi-warhead configuration development. The FY 2026 request was reduced by $0.231 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." OOC: FY 2024 includes $8.212M for the OOC budget request: MK-706 Containers $8.212M.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Ammunition, Navy and Marine Corps | N | FY24 Actuals | $84.2M |
| Procurement of Ammunition, Navy and Marine Corps | N | FY25 Enacted | $57.2M |
| Procurement of Ammunition, Navy and Marine Corps | N | FY26 Disc. Request | $87.8M |
| Procurement of Ammunition, Navy and Marine Corps | N | FY26 Total | $87.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.64B | $84.2M | $57.2M | $87.8M | $87.8M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| NH-02 | $239.0M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| BAE SYSTEMS INFORMATION & ELECTRONIC SYSTEMS INTEGRATION INC | N0001917D5517 | high |
| BAE SYSTEMS INFORMATION & ELECTRONIC SYSTEMS INTEGRATION INC | N0001919F2701 | high |
| BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. | N0001914C0044 | high |
| BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. | N0001919F0019 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Airborne Rockets, All Types. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O455
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O454
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O465
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.