Printed from https://fiscalreceipts.com/program/0145-PANMC/ — data as of September 1, 2026. Every figure is citation-backed; see the page online for per-number provenance.
General Purpose Bombs
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
| Fiscal year | Amount |
|---|---|
| FY24 | $42.4M |
| FY25 | $23.3M |
| FY26 | $30.9M |
All series figures: P-1 TOA · PB2026
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $43.4M | $35.2M | $42.4M | ||
| Enacted | – | $35.2M | $43.5M | $23.3M | |
| Request | – | – | $43.5M | $33.2M | $30.9M |
blank = series not published for this year; – = absent from that edition.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — General Purpose Bombs
The General Purpose (GP) bombs budget sustains munition component inventory levels as defined in the Navy Munitions Requirement Process (NMRP) model. This model produces inventory requirements based on fleet operational scenarios and the number of weapons required to engage defined target sets. The budget also procures on-going technology integration to optimize the production and capability of products within the Direct Attack Weapons (DAW) portfolio. Inventory levels fluctuate year to year based on changes to the model as tactical targets are reassessed and weapons are expended in tactical operations and training. This variable requirement is assessed and a mean average is used to buffer out the most extreme changes. The GP Bombs Budget procures several different categories of munition components. The bomb bodies procured vary in size, construction and explosive fill to provide the desired effect when employed against their targets. The fuzes, aero components, sensors and guidance kits procured provide a variety of detonation options for optimal lethality and flight control options to deliver the weapon to its intended target. A family of fuzes, when installed into the weapon, provides a controlled initiation of the explosive fill when commanded through impact with a target or at a predetermined time. This predetermined time may occur above the ground for a detonation above the target or below the ground after impact to engage deeply buried hardened targets. A basic fixed fin stabilizes the bomb and allows the weapon to travel on a ballistic line of fall as controlled by forward movement imparted by the aircraft and gravity. Laser guided components control the fall of the bomb using movable surfaces and a laser-detecting device to guide the bomb to a location on the ground illuminated by a laser designator. There is also funding included in this budget to address a myriad of subcomponents that are used in the assembly of the various weapon configurations, including arming wires, adapters, lugs, nose plugs, aero surfaces, mechanical interfaces, cables and other components required for All Up Round (AUR) configurations. Lastly, this budget funds production engineering, integrated logistics, and product improvement efforts to sustain production and ongoing enhancements to ensure the weapons remain relevant in the environments they are used. FY 2024 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50). DON has received $7.201 million for the procurement of BLU-111 (Qty 257), BLU-110 (Qty 6), BLU-117 (Qty 17), BLU-109 (Qty 68), BLU-126 (Qty 4), DSU-38 (Qty 50) and FMU-139D/B (Qty 257) for the replacement of Navy stock. In FY 2024, DON has received $1.753 million for the procurement of BLU-111 (Qty 257) for the replacement of Navy stock. This results in an increase in FY 2024 quantities from 0 to 257 BLU-111s. In FY 2024, DON has received $0.064 million for the procurement of BLU-110 (Qty 6) for the replacement of Navy stock. This results in an increase in FY 2024 quantities from 0 to 6 BLU-110s. In FY 2024, DON has received $0.469 million for the procurement of BLU-117 (Qty 17) for the replacement of Navy stock. This results in an increase in FY 2024 quantities from 55 to 72 BLU-117s. In FY 2024, DON has received $2.669 million for the procurement of BLU-109 (Qty 68) for the replacement of Navy stock. This results in an increase in FY 2024 quantities from 0 to 68 BLU-109s. In FY 2024, DON has received $0.044 million for the procurement of BLU-126 (Qty 4) for the replacement of Navy stock. This results in an increase in FY 2024 quantities from 0 to 4 BLU-126s. In FY 2024, DON has received $0.909 million for the procurement of DSU-38 (Qty 50) for the replacement of Navy stock. This results in an increase in FY 2024 quantities from 0 to 50 DSU-38s. In FY 2024, DON has received $1.291 million for the procurement of FMU-139D/B Fuzes (Qty 257) for the replacement of Navy stock. This results in an increase in FY 2024 quantities from 3,780 to 4,037 FMU-139D/B Fuzes. FY 2025 matches the Base for Reprogramming Actions, DD 1414 and does not include supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50). DON has received $1.436 million for the procurement of BLU-117 (Qty 8), BLU-109 (Qty 28), and FMU-139D/B (Qty 36) for the replacement of Navy stock. In FY 2025, DON has received $0.220 million for the procurement of BLU-117 (Qty 8) for the replacement of Navy stock. This results in an increase in FY 2025 quantities from 41 to 49 BLU-117s. In FY 2025, DON has received $1.100 million for the procurement of BLU-109 (Qty 28) for the replacement of Navy stock. This results in an increase in FY 2025 quantities from 0 to 28 BLU-109s. In FY 2025, DON has received $0.116 million for the procurement of FMU-139D/B Fuzes (Qty 36) for the replacement of Navy stock. This results in an increase in FY 2025 quantities from 2,661 to 2,697 FMU-139D/B Fuzes.
Description — FA-18E/F
The F/A-18E/F Naval Strike Fighter is a twin-engine, mid-wing, multi-mission tactical aircraft. F/A-18E/F can be missionized through selected use of external equipment to accomplish specific fighter or attack missions. This capability allows the Operational Commander more flexibility in employing his tactical aircraft in a dynamic scenario. The primary design mission for the F/A-18E/F is a strike fighter which includes the traditional applications, such as fighter escort and fleet air defense, combined with the attack applications, such as interdiction and close air support. Since the same airframe systems are used on attack missions as well as fighter missions, excellent fighter and self defense capability is retained.
Justification
Justification — General Purpose Bombs
This budget supports critical Navy Title 10 war reserve/operational, training and test requirements IAW DoD Instruction 3000.04 (Munitions Requirements Process) and OPNAV INST 8011.9 (Navy Munitions Requirements Process). War reserve requirements support OSD-approved Combatant Commander Operational Plans, Homeland Defense, and other OSD-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces. Test requirements support the verification, fielding, safety and quality assurance of Navy weapons and equipment throughout their life cycle. FY 2026 baseline funding is required to meet Naval Munitions Requirements Process (NMRP) inventory requirements. This model produces inventory requirements based on fleet operational scenarios and the number of weapons required to engage defined target sets. The budget also procures on-going technology integration to optimize the production and capability of products within the Direct Attack Weapons (DAW) portfolio. Inventory requirements fluctuate year to year based on changes to the model as tactical targets are reassessed and weapons are expended in tactical operations and training. This variable requirement is assessed and a mean average is used to buffer out the most extreme changes. Annual Non-Combat Expenditure Allowance (NCEA) prepares Naval Aviation units for deployment and is the largest cause of current and future General Purpose (GP) bombs procurement. Unlike procurement of capital assets, NCEA consumes GP bombs in support of Fleet readiness every year. Procurements are primarily designed to replenish the weapons used each year to achieve required readiness levels. Barring a reduction in fleet training expenditures and the correlating readiness degradation, any reductions in GP bombs procurements in a given year will have to be addressed with increased procurements in the out years to restore inventory to a level adequate to support NCEA and fleet readiness. The FY 2026 request was reduced by $0.083 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Justification — FA-18E/F
The FY 2026 request is for Integrated Logistics Support for government production-related logistics operations support through delivery of the final Lot 47/FY2023 aircraft. FY 2026 Production Line Shutdown funds costs associated with Aircraft Contractor Furnished Equipment (CFE), Government Furnished Equipment/Government Furnished Property (GFE/GFP) which includes planning and administration of the physical disposition of tools and equipment, data transition, supplier close-out, government and contractor labor. FY 2023 is the last year of procurement of the E/F aircraft. Last aircraft delivery of LOT 47 currently scheduled for April 2027.
Budget Line Items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Ammunition, Navy and Marine Corps | N | FY24 Actuals | $42.4M |
| Procurement of Ammunition, Navy and Marine Corps | N | FY25 Enacted | $23.3M |
| Procurement of Ammunition, Navy and Marine Corps | N | FY26 Disc. Request | $30.9M |
| Procurement of Ammunition, Navy and Marine Corps | N | FY26 Total | $30.9M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget Figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $2.85B | $42.4M | $23.3M | $30.9M | $30.9M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 149 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
5 mentions from the Senate LDA disclosure database.
Legislative & Regulatory Issues Related to Technology Policy, including R&D, Cybersecurity, Privacy, Health IT…
Legislative & Regulatory Issues Related to Technology Policy, including R&D, Cybersecurity, Privacy, Health IT…
Legislative & Regulatory Issues Related to Technology Policy, including R&D, Cybersecurity, Privacy, Health IT…
Legislative & Regulatory Issues Related to Technology Policy, including R&D, Cybersecurity, Privacy, Health IT…
Legislative & Regulatory Issues Related to Technology Policy, including R&D, Cybersecurity, Privacy, Health IT…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not General Purpose Bombs. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →