NProcurementPartial Reconciliation0131
What it is
Surface Power Equipment — a procurement program run by Navy.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$12.9M
FY25 Total
FY26 Request
$9.98M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $12.9MFY26: $9.98MFY24FY26
FY24
$12.9M
FY26
$9.98M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$41.4M$46.5M$12.9M
Enacted$46.5M$14.0M$20.8M
Request$14.0M$20.8M$9.98M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $14.0M for FY2024; the PB2026 book reports $12.9M actually spent — $1.15M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Surface Power Equipment

Surface Power Equipment budget line provides life-cycle support for the following Marine Gas Turbine systems: The General Electric LM2500 Marine Gas Turbine provides main propulsion for the Navy's surface combatants including the CG 47 TICONDEROGA Class, DDG 51 ARLEIGH BURKE Class, and LCS-2 (Austal) Class. The LM2500 is composed of two major sub-assemblies: the gas generator and power turbine sections. It is coupled to the ship drive-train by a high speed coupling shaft. The LM2500+ Marine Gas Turbine and its associated Engineering Control Systems provide main propulsion power for the Navy's amphibious assault ships including the LHD-8 USS MAKIN ISLAND, LHA-6 USS AMERICA and LHA-7 USS TRIPOLI. The LM2500+ is composed of two major sub-assemblies: the gas generator and power turbine sections. It is coupled to the ship drive-train by a high speed coupling shaft. The control system for both engines provides for both local and remote engine operations. The Rolls Royce (Allison) 501-K Series Gas Turbines are used to drive electrical generators in Ship Service Gas Turbine Generators (SSGTG). The 501-K17 is used on the CG-47 Class ships. The 501-K34 is an upgraded version used on the DDG-51 Class ships and is not interchangeable with the 501-K17. The MT5S is a higher-power derivative of the 501-K engine family (utilizing Rolls Royce's new "Marine Trent" or "MT" naming convention vice the older "501-K" naming convention) used for auxiliary electrical generation on DDG-1000 class ships; the MT5S is not interchangeable with the 501-K17 or 501-K34. The MT5S is used within the RR4500 auxiliary turbine generator (ATG) aboard DDG-1000 Class ships. The MT5S-HE+ is used within the AG9160RF SSGTG aboard DDG-51 Flight III ships. Based on the MT5S design, the MT5S-HE+ includes several material changes designed to improve fuel efficiency and increase AG9160RF electrical power output when compared to the RR4500. The Rolls Royce MT-30 is used on LCS-1 (Lockheed) Class for main propulsion and DDG 1000 for electrical generation. Rolls Royce 250-KS4 is used as a starter gas turbine for the 501-K34 on DDG 79 and follow. The Rolls Royce MT7 gas turbine is used for both lift and propulsion fan power on the next generation of LCAC landing craft. Digital Fuel Control (DFC) procurement quantities are based upon the DDG modernization schedule and quantities are procured one year in advance of the scheduled availabilities due to long material lead times. The Surface Power Equipment budget line may also be used to procure spare waterborne shafting (propeller shafts and stern tube shafts) and controllable pitch propeller (CPP) system end items such as propeller blades, hubs and oil distribution (OD) boxes used on DDG 51 class ships. [P40A / PE009 GE Readiness Improvement Upgrade Kits]: PE009 - MODIFICATION KIT PROGRAM: This cost element procures modification kits listed below for the GE Gas Turbine Engine. These modifications increase reliability and fleet readiness through component upgrades which improves the Mean Time Between Failure (MTBF). The modification kits are procured based on historical usage rates, re-packaged into individual kits, and sent to either a depot to be installed during engine overhauls or to Regional Maintenance Centers for installation. Procurement quantities are not shown because these funds are used to procure a variety of modification kits, with specific kit quantities and prices varying from one year to the next. The kits included in the cost code are as follows: --Accelerometers (Vibration Monitor) -- Compressor Rear Frame Mid-flange Fastener installation -- C-Sump Lubrication Supply Line -- Power Turbine Upgraded Speed Sensor -- Improved Drain Shutoff Valve -- Turbine Mid-Frame Modification -- 7B Piping Modification -- 5-Element to 6-Element Pump Conversion -- T5.4 Flexible Thermo Harness -- Mid Flange Fastener [P40A / PE010 Stock Rotating Spares]: PE010 - GAS GENERATOR: This cost element procures the LM2500 and LM2500+ single shank propulsion gas turbines to support surface combatant and amphibious assault class surface ships. The programs projected in-service population of single shank propulsion gas turbine engines is estimated to be 382 due to new construction. Breakdown of ship class spare procurement is listed below. The procurement of these engines includes all required shipping/storage containers. DDG LM2500 Single Shank Based on experience with 35 years of usage demand data on the LM2500 Engine and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 36 spares are required to support the fleet requirements. LCS 2 LM2500 Single Shank. Based on experience with 35 years of usage demand data on the LM2500 Engine and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 3 spares are required to support the fleet requirements. As of FY21 no requirement to procure LM2500 Single Shanks. LHD8/LHA6/LHA7 LM2500+ Single Shank Gas Generator Assembly (SST GGA) and Power Turbine Assembly (PTA) Based on experience with 35 years of usage demand data on the LM2500 Engine and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 2 spares are required to support the fleet requirements. Based on sparing requirement procurement of 2 additional LM2500+ engines are required. Total of 4 engines are required. LM2500 Hot Section Kits Are procured as required from the below list per quarterly failure analysis and maintained to replace High Pressure Turbine (HPT) components beyond repairable limits. Shortages of replacement blades increase engine repair turn-around time (RTAT) during engine refurbishment/repair as a result of material shortages. Procurement quantities are a result of procuring various kits of various costs. The kits included in the cost code are as follows: --HPT Shrouds --HPT Seal Assembly --HPT Blades --HPT Nozzles --Compressor Blades [P40A / PE014 Special Support Equipage]: PE014 Special Support Equipage - This cost element procures Special Support Equipment for all marine gas turbines to support gas turbine changeouts and to allow for increased I-level (intermediate level) repair capability, thereby reducing the number of engine change outs required and stabilizing or reducing the cost to overhaul engines at the depot. No installation cost is associated with this cost element. [P40A / PE015 LM2500 DIGITAL FUEL CONTROL]: PE015 - LM2500 DIGITAL FUEL CONTROL (DFC)- This cost element procures the Digital Fuel Control (DFC) shipsets, ancillary equipment and install material to support the CG/DDG modernization schedules. Procurement and installations are budgeted to correspond with CNO ship availabilities. One DFC kit is required to update each of the four LM2500 engines, which makes one DFC shipset. The DFC upgrade is a mandatory portion of DDG-51 modernizations; the modernized machinery control system (MCS)is incapable of interfacing with LM2500 engines not equipped with DFC. The DFC is the most significant change to the LM2500 engine since its inception into the USN that addresses obsolete components which accounted for approximately 40% of all engine failures. In summary, this modification is estimated to be 75% more reliable than the old system. This upgrade also replaces the Hydro-mechanical main fuel control (MFC) system, which was designed for aircraft, with a DFC system designed for a military marine environment. This modification increases engine reliability, decreases periodic maintenance, enhances operational functions, and provides an automatic stall detection and shutdown capability. PE6IN - INSTALLATION FOR DIGITAL FUEL CONTROL (DFC)- This cost element funds the installation of Cost element PE015, LM2500 Digital Fuel Control (DFC) shipsets, as part of the CG/DDG HM&E modernization program. This includes pre-assembly at NSWCPD (Philadelphia), shipping to installation location, shipboard installation, training, post installation operational testing and associated travel cost. [P40A - 2 / PE001 STOCK ROTATING SPARES]: PE001 - STOCK ROTATING SPARES This cost element procures the MT-30 for DDG1000 Zumwalt Class and Littoral Combat Ship (LCS) Independence Variant, MT-5 series gas turbines for the DDG 1000 Zumwalt Class and DDG-51 Flight III program, the 250-KS4 SSGTG starter engines for the DDG 79 and follow, and the 501-K34 gas turbines DDG 51 class ships. The procurement of these engines includes all required shipping/storage containers and necessary hardware to allow for installation of the MT30 gas turbine into DDG1000 or LCS5AF hull types. MT-30 Gas Turbines Based on experience with similar turbines and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 6 spares are required to support the fleet. MT-5 Gas Turbines Based on experience with similar turbines and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 4 MT-5 spares are required to support the fleet. The in-service population of MT-5S gas turbine engines is six (6) due to new construction of DDG1000 and thirty (30) of the higher efficiency MT5S-HE+ units for DDG-51 Flight III. 250-KS4 SSGTG Starter Engines Based on experience with similar turbines and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 12 spares are required to support the fleet requirements. Current spares on-hand is twelve (12) which achieves the baseline sparing requirement. The projected FY-19 in-service population of starter engines is 103 due to new construction, but would be 169 if Flight IIA and Flight III were included. Operation Tomodachi has resulted in the radiological contamination of twelve (12) 250-KS4 Marine Gas Turbines, which created an unplanned requirement to replace the twelve (12) affected engines beginning in FY13. Completion of procurement of 12 replacement engines in FY23. 501-K34 Gas Turbines Based on experience with similar turbines and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 26 spares are required to support the fleet requirements. [P40A - 2 / PE007 MODIFICATION PROGRAM]: PE007 - MODIFICATION PROGRAM This cost element procures modification kits listed below for the Rolls Royce Marine Gas Turbines (MGT). Analysis of Rolls Royce MGT engineering performance data, metrics, the SEA 21 Top Tech Issues and the component improvement program has identified necessary improvements to correct Rolls Royce MGT deficiencies. The modifications addresses the Fleet's top maintenance and reliability issues by reducing failure rates of system components, and improve Rolls Royce MGT readiness. The modification kits are packaged and shipped to the ship for installation during schedule CNO availability by a team of NSWCPD (Philadelphia) and Alteration Installation Team (AIT) personnel. Procurement quantities are not shown because these funds are used to procure a variety of modification kits, with specific kit quantities and prices varying from one year to the next. The kits included in the cost code are as follows: --FADC upgrade conversion --MT30 variant conversion kits [P40A - 3 / PE830 PRODUCTION ENGINEERING]: PE830 PRODUCTION ENGINEERING The review and approval of any production contract technical documentation, or the separate development of this documentation to include: - Technical Manuals - Signal Flow Diagrams - PMS - Level III Production Drawings - Provisioning Technical Documentation (PTD) - Program Support Data - Allowance Parts Lists (APL's) - Engineering in support of final design reviews. This includes efforts associated with tracking and updating Navy Data Environment (NDE), Marine Gas Turbine Information System (MGTIS) and Weblog to reflect completed installations and ensure consistent documentation for engine configuration management. [P40A - 4 / PE110 Propellers and Shafts]: PE110- VARIOUS PROPELLERS AND SHAFTS - This funding procures controllable pitch propeller (CPP) system end items such as propeller blades, hubs and oil distribution (OD) boxes used on DDG 51, LHD 8 and following (AF), LPD, LHA 6 AF, LSD 41, and DDG1000 class ships. These spares are required to DDG 51, LHD 8 and following (AF), LPD, LHA 6 AF, LSD 41, and DDG1000 Fleet demand due to scheduled replacement caused by lifecycle wear and unscheduled replacements caused by Casualty Reports (CASREPs). The component has long repair turn-around times (1-2 years) and thus cannot be repaired and reused during the same availability. The technical requirements and drydocking constraints drives the program to establish a rotatable pool to support replacements. The growing size of the fleet and insufficiency of the current number of DDG 51, LHD 8 and following (AF), LPD, LHA 6 AF, LSD 41, and DDG1000 spares to meet upcoming change-out demand per CNO availability schedules is driving the requirement to increase the number of spares to support a rotatable pool and ensure readiness. A malfunctioning propeller or shaft may result in excessive vibration, which could lead to damage of ship structures and equipment (bearings, main reduction gears, and bulkhead seal), increase of ship cavitation/noise, loss of speed or loss of motion. [P40A - 5 / PE130 - Steam Propulsion Items]: PE130 - STEAM PROPULSION ITEMS - This provides for several initiatives oriented to upgrading boiler efficiency and safety with downstream maintenance effectiveness. In particular, the items procured include: Upgraded Stack Gas Analyzer (SGA) , Optimization Trim Loop Material including fuel oil meters, stack gas temperature sensors, electronic automatic boiler controls interface software/schema to improve steam plant efficiency, Upgraded electronic automatic boiler control (E-ABC) system process controllers/smart transmitters, Upgraded Boiler Water/Feedwater (BW/FW) Chemistry Analysis/Carbohydrazide Implementation Equipment., Upgraded SSTG Protective Devices (Overspeed Trips), and Upgrades to Boiler Igniter System (BIS) (Fuel Valve and Insert/Retract Air Actuators). The Steam Propulsion Improvement Program provides safe and reliable power for ship movement through the water, and, in addition, provides power to ships combat and habitability systems, whether electrical or steam dependent. At any given time, due to propulsion plant casualties, ship propulsion systems may be operating at reduced capability, adversely affecting the ship's mission(s). The Steam Propulsion improvement program encompasses steam and diesel propulsion surface ships in the Fleet, and provides for material upgrades to propulsion systems resulting in increased readiness, safety and reliability. Items can be installed during a scheduled or unscheduled availability by a shipyard, tender/Intermediate Maintenance Activity or Alteration Installation Team (AIT).

Justification

Justification Surface Power Equipment

The decrease in FY 2026 funding is due to the changes to the Full Authority Digital Control (FADC) procurement and installation schedule. FY 2026 funding of $9.978M is required to support procurement of DDG51 Gas Turbine Generator Engine Controller procurements and installations, procurement of non-nuclear surface ship controllable pitch propeller assets, and lesser cost gas turbine parts for depot overhaul kits. Procurements are scheduled to ensure on time delivery of assets for dry dock availabilities, combat obsolescence of specific parts, and maintain up to date configuration of all engines going through overhauls. The FY 2026 request was reduced by $.009 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$12.9M
Other Procurement, NavyNFY25 Enacted$20.8M
Other Procurement, NavyNFY26 Disc. Request$9.98M
Other Procurement, NavyNFY26 Total$9.98M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$188.1M$12.9M$20.8M$9.98M$9.98M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →