Skip to content
Fiscal Receipts

B-1B Squadrons

FRDT&EPartial Reconciliation0101126F
What it is
B-1B Squadrons — a research & development program run by Air Force.
What changed
+$98.7M FY25→26
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$12.3M
FY25 Total
$17.9M
FY26 Request
$116.6M
FY25→26 Change
$98.7M

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $12.3MFY25: $17.9MFY26: $116.6MFY24FY25FY26
FY24
$12.3M
FY25
$17.9M
FY26
$116.6M
Decade view — each figure cites its own President's Budget edition
FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$4.21M$2.17M$4.56M$60.4M$58.2M$1.00M$15.3M$38.0M$19.5M$12.3M
Enacted$2.25M$5.83M$62.5M$60.3M$1.00M$15.7M$39.1M$20.0M$12.6M$17.9M
Request$5.83M$62.5M$76.0M$1.00M$15.8M$29.1M$13.1M$12.6M$17.9M$116.6M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2019 book requested $76.0M for FY2019; the PB2021 book reports $58.2M actually spent — $17.9M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission B-1B Modernization

The B-1B Lancer is a swing-wing, supersonic, long-range conventional bomber. It carries the largest payload of both guided and unguided weapons in the AF inventory. The multi-mission B-1B is the backbone of America's long-range conventional bomber force and can rapidly deliver massive quantities of precision (and non-precision) weapons against any adversary, anywhere in the world, at any time. The B-1B modernization projects alleviate aircraft obsolescence issues due to Diminishing Manufacturing Sources and Material Shortages (DMSMS) while at the same time providing improved capabilities to the B-1B weapon system that require significant hardware and software development and testing. RADIO-CRYPTO MODERNIZATION: The B-1B Radio Crypto program originates from JROCM 040-11, VACM Cease Key CED-026-11, UHF SATCOM (Ultra-High Frequency Satellite Communication) Decommission and Cease Key for Demand Assigned Multi Access (DAMA) Orderwire, HAVE QUICK II Cease use date, and DoD CIO Mobile User Objective System (MUOS) transition directive. If the requirements/directives are not met, B-1B will lose its secure line of sight, beyond line of sight, and anti-jam communication with ground and air forces. The initiative will replace the existing ARC-210 (Gen 3/4) with ARC-210 (Gen 6) next generation radios. Additionally, the program will provide MUOS Satellite Communication capability that supports the DoD Chief Information Officer (CIO) directive to move all DoD assets to MUOS constellation (70% by FY26). This effort will lay in Ethernet cable required by MUOS Data (J-REAP C), install MUOS ancillaries High Power Amplifier/Low Noise Amplifier (HPA/LNA) and additional software to execute MUOS capability on the aircraft. The B-1B Radio Crypto program received an updated Acquisition Decision Memorandum (ADM) in March 2023 approving an updated acquisition strategy that combined the program increments into one technical baseline and accelerated the schedule. A further updated ADM signed January 2024 accelerated the full production lot buys. Preliminary Design Review (PDR) was completed in Q4 FY23, Critical Design Review (CDR) approval was completed Q1 FY24, and Ground / Flight Testing is currently ongoing and is expected to conclude Q3 FY25. EXTERNAL HEAVY-STORES PYLON: This is a FY26 New Start. External Heavy-Stores Pylon program expands on the accomplishments of the Hypersonic Integration Program, a Congressional Add, by providing increased carriage capacity of standoff munition on B-1B aircraft. Maximum carriage of existing standoff munitions on the B-1B provides near-term increased volume of fires from standoff ranges and serves to mitigate transition risk of the Air Force bomber fleet prior to the emergence of the B-21 as a combat bomber. - HYPERSONIC INTEGRATION: -- The FY22 and FY23 Conference Appropriations, detailed in the Congressional Conference Reports of Interest, added 20.0M (10.0M in FY22 and 10.0M in FY23) RTD&E appropriation for B-1B hypersonic weapon integration. This funding developed an external carry-enabled testbed facilitating rapid integration of priority hypersonic weapons in support of national security objectives, leading to potential investment opportunities for weapon programs. This program provides an opportunity to significantly reduce risk for an operational external carry capability on the B-1B if directed. The Hypersonic Integration Program successfully demonstrated the B-1's ability to execute a captive carry of a 5,000-pound class store and the release of a proven weapon shape from a Load Adaptable Modular (LAM) pylon. LONG-RANGE ANTI-SHIP MISSILE (LRASM) C-3 INTEGRATION: This is a FY26 New Start. The Long-Range Anti-Ship Missile (LRASM) C-3 is increment 1 of the Offensive Anti-Surface Warfare (OASuW) weapon development program. LRASM (AGM-158C-3) addresses an air-launch capability gap by providing flexible, long-range, advanced, anti-surface capability against high-threat maritime targets. The LRASM AGM-158C-3 variant will be a forward fit Engineering Change Proposal (ECP) to the AGM-158C, to enhance long range strike and existing OASuW capability. Beginning in FY26 through the outyears, the USAF will procure AGM-158C-3 missiles only until the missile inventory objective is met. The first USAF LRASM C-3 missile deliveries are targeted in Q4 CY27. LRASM is highly leveraged on the design of the Joint Air-to-Surface Standoff Missile-Extended Range (JASSM-ER, AGM-158B). LRASM and JASSM-ER have over 70% hardware commonality and share the same production assembly line. The USN is the lead service for the LRASM program, and the B-1 is a threshold platform. The USAF and USN jointly procure LRASMs via a USAF contract that benefits from cost savings when aligned with JASSM-ER procurements. B-1B HYBRID SATCOM: This is a FY26 New Start. Hybrid-SATCOM provides resilient pLEO in contested environments. INDOPACOM has an urgent requirement to interface and exchange classified data with B-1 in support of INDOPACOM activities in CY26. Securing alternate network connectivity and pathways will restore long-range integration capability and increase combat effectiveness through a modern, resilient, and reliable construct. Without this capability, there is a risk of isolating combat air forces from the Air Operations Center and the Combatant Commander. B-1B TEST JET MAINTENANCE (MX): This is a FY26 New Start. The B-1B AFMC Test Jet maintenance project will provide funding for the test aircraft, manpower, and facilities at the Air Force Test Center located at Edwards Air Force Base (AFB), California. This will support the developmental testing and sustainment needs of the B-1B weapon system. It funds support for maintenance activities for test aircraft, which is performed at Tinker AFB, Oklahoma. Funds also support analysis, documentation, and related activities necessary to establish a program of record and support the B-1B weapon system. Additionally, other costs include Program Management Administration (PMA) and centralized support as well as initiatives for anticipated weapon system enhancements (to include efforts to improve weapon system operational capabilities, safety, supportability, maintainability, reliability, digital engineering and total cost of ownership). GAP AND INTEGRATION ANALYSIS: Program funds cover engineering/planning studies, related engineering efforts, and the auxiliary equipment needed for development projects that have not yet been fielded. Funds may be used to resolve emerging safety of flight and DMSMS issues, accommodate technology insertion, and fulfill FAA (or other) mandates necessary to ensure continued aircrew safety and mission effectiveness. Costs include PMA costs, total ownership cost, as well as initiatives for anticipated weapon system enhancements (to include efforts for improving weapon system operational capabilities, safety, supportability, maintainability, reliability, digital engineering and total cost of ownership). B-1B funding also supports innovation activities to include studies, analyses, requirements definition, digital engineering initiatives and quick-reaction capability prototypes/demonstrations to accelerate planning for technology transition, technology insertion, and future acquisition programs. Funds may be used to resolve emerging safety of flight and DMSMS accommodating technology insertion and fulfilling FAA or other mandates necessary to ensure continued aircrew safety and mission effectiveness. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY 2024 1.4 million was expended for civilian pay expenses in this program element, and in FY 2025 0.8 million is forecasted for civilian pay expenses in this program element. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Justification

Accomplishments & Planned Programs (5)

HYBRID SATCOM

This is a FY26 New Start. Hybrid-SATCOM provides resilient pLEO in contested environments. INDOPACOM has an urgent requirement to interface and exchange classified data with B-1 in support of INDOPACOM activities in CY26. Securing alternate network connectivity and pathways will restore long-range integration capability and increase combat effectiveness through a modern, resilient, and reliable construct. Without this capability, there is a risk of isolating combat air forces from the Air Operations Center and the Combatant Commander.

RADIO-CRYPTO

The B-1B Radio Crypto program originates from JROCM 040-11, VACM Cease Key CED-026-11, UHF SATCOM (Ultra-High Frequency Satellite Communication) Decommission and Cease Key for Demand Assigned Multi Access (DAMA) Orderwire, HAVE QUICK II Cease use date, and DoD Chief Information Officer (CIO) Mobile User Objective System (MUOS) transition directive. If the requirements/directives are not met, B-1B will lose its secure line of sight, beyond line of sight, and anti-jam communication with ground and air forces. The initiative will replace the existing ARC-210 (Gen 3/4) with ARC-210 (Gen 6) next generation radios. Additionally, the program will provide MUOS Satellite Communication capability that supports the DoD (CIO) directive to move all DoD assets to MUOS constellation (70% by FY26). This effort will lay in Ethernet cable required by MUOS Data (J-REAP C), install MUOS ancillaries (HPA/LNA) and additional software to execute MUOS capability on the aircraft. The B-1B Radio Crypto program received an updated Acquisition Decision Memorandum (ADM) in March 2023 approving an updated acquisition strategy that combined the program increments into one technical baseline and accelerated the schedule. A further updated ADM signed January 2024 accelerated the full production lot buys. Preliminary Design Review (PDR) was completed in Q4 FY23, Critical Design Review (CDR) approval was completed Q1 FY24, and Ground / Flight Testing is currently ongoing and is expected to conclude Q3 FY25.

LRASM C-3

LONG RANGE ANITSHIP MISSILE (LRASM) C-3 INTEGRATION: This is a FY26 New Start. The Long-Range Anti-Ship Missile (LRASM) C-3 is increment 1 of the Offensive Anti-Surface Warfare (OASuW) weapon development program. LRASM (AGM-158C-3) addresses an air-launch capability gap by providing flexible, long-range, advanced, anti-surface capability against high-threat maritime targets. The LRASM AGM-158C-3 variant will be a forward fit Engineering Change Proposal (ECP) to the AGM-158C, to enhance long range strike and existing OASuW capability. Beginning in FY26 through the outyears, the USAF will procure AGM-158C-3 missiles only until the missile inventory objective is met. The first USAF LRASM C-3 missile deliveries are targeted in Q4 CY27. LRASM is highly leveraged on the design of the Joint Air-to-Surface Standoff Missile-Extended Range (JASSM-ER, AGM-158B). LRASM and JASSM-ER have over 70% hardware commonality and share the same production assembly line. The USN is the lead service for the LRASM program, and the B-1 is a threshold platform. The USAF and USN jointly procure LRASMs via a USAF contract that benefits from cost savings when aligned with JASSM-ER procurements.

EXTERNAL HEAVY-STORES PYLON:

This is a FY26 New Start. External Heavy-Stores Pylon program expands on the accomplishments of the Hypersonic Integration Program, a Congressional Add, by providing increased carriage capacity of standoff munition on B-1B aircraft. Maximum carriage of existing standoff munitions on the B-1B provides near-term increased volume of fires from standoff ranges and serves to mitigate transition risk of the Air Force bomber fleet prior to the emergence of the B-21 as a combat bomber.

B-1B Test Jet Maintenance (MX)

The B-1B AFMC Test Jet MX project will provide funding for the test aircraft, manpower, and facilities at the Air Force Test Center located at Edwards Air Force Base (AFB), California. This will support the developmental testing and sustainment needs of the B-1B weapon system. It funds support for maintenance activities for test aircraft, which is performed at Tinker AFB, Oklahoma. Funds also support analysis, documentation, and related activities necessary to establish a program of record and support the B-1B weapon system. Additionally, other costs include Program Management Administration (PMA) and centralized support as well as initiatives for anticipated weapon system enhancements (to include efforts to improve weapon system operational capabilities, safety, supportability, maintainability, reliability, digital engineering and total cost of ownership).

Budget Line Items(workbook-cited)

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY24 Actuals$12.3M
Research, Development, Test and Evaluation, Air ForceFFY25 Enacted$17.9M
Research, Development, Test and Evaluation, Air ForceFFY25 Total$17.9M
Research, Development, Test and Evaluation, Air ForceFFY26 Disc. Request$116.6M
Research, Development, Test and Evaluation, Air ForceFFY26 Total$116.6M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
675344: B-1B Modernization$0$12.3M$17.9M$116.6M$116.6M
Program Element$0$12.3M$17.9M$116.6M$116.6M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →