Skip to content
Fiscal Receipts

Heaters and ECU's

AProcurementPartial Reconciliation0100MF9000
What it is
Heaters and ECU's — a procurement program run by Army.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$7.17M
FY25 Total
FY26 Request
$14.3M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $7.17MFY26: $14.3MFY24FY26
FY24
$7.17M
FY26
$14.3M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$6.12M$7.67M$7.17M
Enacted$7.67M$7.62M$14.4M
Request$7.62M$14.4M$14.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $7.62M for FY2024; the PB2026 book reports $7.17M actually spent — $447.0K below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Heaters and ECU's

This budget line represents the Army's family of Improved Environmental Control Units (IECUs), commonly known as Air Conditioners. IECUs provide cooling and supplemental heating for Army tents and shelters. Systems range in size from 9,000 to 60,000 British Thermal Units/hour (BTU/hr) and are powered by common electrical currents supplied by both mobile electric power systems and standard commercial facilities. IECUs also provide dehumidification and filtering of air in support of environmentally sensitive electronic equipment in mobile shelters and vans. IECUs support critical electronic equipment that would not support the Army mission without proper environmental control. IECUs support numerous major tactical weapon systems. The majority of the supported weapon systems are command, control, and communication items. Other applications include medical facilities, expeditionary basing, support equipment, satellite communications, intelligence gathering systems, petroleum and water logistics laboratories, electronic shop sets, Test Measurement and Diagnostic Equipment (TMDE), aviation shop sets and topographic support sets. The IECU program will provide a new generation of Environmental Control Units (ECUs) that use environmentally approved refrigerants, with zero ozone-depleting chemicals (ODCs), to replace the current Military Standard (MIL-STD) Family of ECUs. IECUs are required to replace currently fielded environmental control units in order to comply with statutory and regulatory restrictions on the use of Class II Ozone Depleting Chemicals (ODCs) and to increase the performance of military ECUs. IECUs operate at wider operating temperatures, are more ruggedized than commercial ECUs, and employ embedded diagnostics and automatic safety controls. Technical improvements over existing military-standard ECUs will yield significant fuel and weight savings, reduction in scheduled maintenance, and increased reliability. 60,000 (3 phase / 50-60 hertz) BTUH (British Thermal Units per Hour) Army Acquisition Objective (AAO) = 3,630 9,000 (single phase / 60 hertz) BTUH AAO = 223 18,000 (3 phase / 60 hertz / 208V) BTUH AAO = 3,573 18,000 (single phase / 60 hertz / 230V) BTUH AAO= 440 36,000 (3 phase / 60 hertz) BTUH AAO= 874 Note: Requirement is to fill existing shortages or provide replacement for assets that are over age, non-supportable, and non-repairable. The IECUs are critical to the systems they support. Additionally, IECUs are required to fill urgent shortages on new fielding of high priority weapon systems. They are used in select shelters which house critical life-saving operations in Combat Support Hospitals and storage of perishable supplies in Brigade Support Battalions. The IECUs provide an EPA compliant capability to the force structure before commercial/military stocks of previously used refrigerant are exhausted and no longer available. IECUs provide essential air conditioning, dehumidification and filtering of air in support of environmentally sensitive electronic equipment in mobile shelters and vans critical to the CP mission and are a critical component of multiple mobile weapons systems. Present and emerging command, control, communications, computers, intelligence, surveillance, and reconnaissance (C4ISR) systems require environmental control to moderate the environmental temperatures in which these systems operate.

Justification

Justification Heaters and ECU's

FY2026 base procurement dollars in the amount of $14.288 million supports the family of Improved Environmental Control Units (IECU) and Base requirements. Funding will support procurement of First Article production assets and an additional delivery order. FY2026 funding also continues to fund technical and logistics support documentation for 10 year IDIQ. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$7.17M
Other Procurement, ArmyAFY25 Enacted$14.4M
Other Procurement, ArmyAFY26 Disc. Request$14.3M
Other Procurement, ArmyAFY26 Total$14.3M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY25 Enacted$1.11M
Other Procurement, ArmyAFY 2026 request$8.94M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$172.0M$7.17M$14.4M$14.3M$14.3M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →