Skip to content
Fiscal Receipts

MQ-1 PAYLOAD

ArmyProcurementReconciledBLI0023A01001
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
MQ-1 PAYLOAD (0023A01001) is an Army procurement line funded in the Aircraft Procurement, Army account.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No single contractor is published as this line's leader. 2 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$13.7MP-1 TOA · PB2026
FY25 Enacted
$14.1MP-1 TOA · PB2026
FY26 Request
Not in the FY2026 J-books we ingested
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2025. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 2 summary figures for FY24 to FY25, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 2 summary figures for FY24 to FY25, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $13.7MFY25: $14.1MFY24FY25
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$13.7M
FY25$14.1M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY22FY23FY24FY25

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25
Actuals$0$72.7M$13.7M
Enacted–$72.7M$13.7M$14.1M
Request––$13.7M$14.1M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — MQ-1 PAYLOAD

The MQ-1 Payload (A01001) budget line supports procurement of Intelligence, Surveillance and Reconnaissance (ISR) payload systems for Divisions and Echelons Above Division Unmanned Aircraft Systems (UAS). Funding in this budget line supports a Sensor Centric approach for sensors onboard the Gray Eagle MQ-1C UAS. Funding in this budget line also supports, but is not limited to, emerging UAS sensor requirements such as Electro Optic/Infrared/Laser Designator (EO/IR/LD), Signals Intelligence (SIGINT), Hyper Spectral Imagery (HSI), and Synthetic Aperture Radar (SAR). The Common Sensor Payload (CSP) is an EO/IR/LD sensor that provides an advanced state-of-the-art sensor suite that can be used to collect critical information across the visible and infrared portions of the electromagnetic spectrum for Battlefield Commanders. The CSP is required for MQ-1C Gray Eagle (GE) Unmanned Aircraft System (UAS) operation and serves as the "eyes" of the UAS by providing high-definition imagery in day or night conditions for detection and classification of targets/threats. The CSP also provides a targeting capability for laser-guided munitions, to include air-to-ground AGM-114 Hellfire missiles. The Target Location Accuracy (TLA) capability inherent to CSP Version 3 (v3) enables precision, near-real time engagements with Coordinate Seeking Weapons (CSWs) by reducing the sensor-to-shooter process from minutes to seconds. Electronics Intelligence (ELINT) and Electronic Support Measures (ESM) capabilities provide high precision direction finding and geolocation with 360-degree instantaneous field of view coverage from the nose, tail, port, and starboard sides of the UAS. FY 2026 funding was transferred from Budget Activity (BA) 2, A01001 MQ-1 PAYLOAD to BA 6, I48000 FUTURE UNMANNED AERIAL SYSTEMS (UAS) FAMILY in support of Agile Portfolio Management.

Justification

Justification — MQ-1 PAYLOAD

FY 2026 funding was transferred from Budget Activity (BA) 2, A01001 MQ-1 PAYLOAD to BA 6, I48000 FUTURE UNMANNED AERIAL SYSTEMS (UAS) FAMILY in support of Agile Portfolio Management. All Quantities are for the Active component. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, ArmyAFY24 Actuals$13.7M
Aircraft Procurement, ArmyAFY25 Enacted$14.1M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 Total
Program Element$321.3M$13.7M$14.1M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the A appropriation, program element 0023A01001 (MQ-1 PAYLOAD), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the A appropriation, program element 0023A01001 (MQ-1 PAYLOAD), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSAProcurement appropriation0023A01001MQ-1 PAYLOADN0016418CJQ40RAYTHEON COMPANY39.6MRaytheon Company registra…TX-03

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
TX-03$39.6M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
RAYTHEON COMPANYN0016418CJQ40high
RAYTHEON COMPANYW56KGY15D0005high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not MQ-1 PAYLOAD. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.