Msl Sprs/Repair Parts (Replen)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $76.9M |
| FY25 | $103.5M |
| FY26 | $108.2M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $71.8M | $70.5M | $76.9M | ||
| Enacted | – | $63.0M | $75.2M | $103.5M | |
| Request | – | – | $75.2M | $103.5M | $108.2M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $75.2M for FY2024; the PB2026 book reported $76.9M as actual total obligation authority — $1.68M above the request. 76.9 − 75.2 = 1.7 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Msl Sprs/Repair Parts (Replen)
Program Description: MISSILE REPLENISHMENT SPARES. The Missile Replenishment Spares program funds all ballistic and non-ballistic missile replenishment spares. The replenishment and repair spare parts are needed to support and maintain ballistic and non-ballistic missile systems. Replenishment spares include such items as rocket motors, cables, telemetry packages, and electronic components. Procurements will include spares with long production lead items. The following Major Defense Acquisition Programs (MDAP) have funding in this line: AMRAAM, 185 SDB II, 439 AIM-9X Blk II, 442 This program has associated Research Development Test and Evaluation funding in PEs 11120F, 11213F, 27161F, 11122F, and 27163F.
Justification
Justification — Msl Sprs/Repair Parts (Replen)
AGM-86 Air Launched Cruise Missile (ALCM): The FY 2026 ALCM funding request for initial spares supports multiple on-going Service Life Extension Programs (SLEPs) to ensure ALCM remains viable until replaced by the Long Range Stand Off (LRSO) missile. ALCM SLEP projects include SLEP 1 and component SLEPs for the Rotary Switch, Warhead Arming Device, Guided Missile Flight Control, W-10 cable, Fuze Assembly, Inertial Navigation Element, Flight Data Transmitter, Voltage Regulator and Elevon Actuator Controller. MM III Modifications: FY2026 replenishment spares funding will specifically procure items such as batteries ordnance, cables, antenna kits, telemetry packages, torque motors, and other electronic components supporting weapons system operations and operational test launches. The flight test, telemetry, and termination system enables Minuteman Flight tests to provide aging surveillance data, operational test for modernizations/upgrades, and demonstrated nuclear deterrence. Funding increase enables the continued ability to flight test ICBMs. Higher than expected costs were identified in the Production proposal received 26 May 23. The root cause of the increase in cost is tied to inflation in the cost of supply chain materials/components and services as well as stringent time based component requalification requirements for range certification. AIM-9 Sidewinder/AIM-9X: FY 2026 funding for Missile Replenishment Spares program funds repairs for CATMs and AURs. These repairs include items such as live and inert batteries, Control Actuation System (CAS) and Inert Measurement Units. HARM - FY 2026 funding is critical to the procurement of High-speed Anti-Radiation Missile (HARM) spare parts in support of Raytheon Missiles Defense System Factory repair of the Control and Guidance Sections for the AGM-88B/C/F All-Up-Rounds. AGM-88 missile is critical for the Suppression of Enemy Air Defenses. Additionally, funding is used for the procurement of Telemetry Sections used in Combat Air Forces Pilot Training and New Threat Analysis. SDB I - FY2026 Spares funds are required to support SDB I Guided Test Vehicles (GTV) modernization for the Weapon System Evaluation Program (WSEP). Spares funding will procure major sub-components such as flight termination and telemetry kits, and flight test recorders, to replace obsolete parts and convert GBU-39/B's into SDB I GTVs. Hellfire - No FY2026 Replenishment Spares being requested. AIM-120 Advanced Medium Range Air to Air Missile: The FY2026 Missile Replenishment Spares program funds AMRAAM field unit repairs and intermediate level repairs on Captive Air Training Missiles (CATM). These repairs include such items as filter rectifiers, harness assemblies, wings and fins.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Missile Procurement, Air Force | F | FY24 Actuals | $76.9M |
| Missile Procurement, Air Force | F | FY25 Enacted | $103.5M |
| Missile Procurement, Air Force | F | FY26 Disc. Request | $108.2M |
| Missile Procurement, Air Force | F | FY26 Total | $108.2M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $0 | $76.9M | $103.5M | $108.2M | $108.2M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
2 mentions from the Senate LDA disclosure database.
Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…
Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Msl Sprs/Repair Parts (Replen). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O983
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O946
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1000
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Missile Procurement · www.saffm.hq.af.mil
PDF page 257