Industrial Responsiveness

FProcurementFully Reconciled000073
What it is
Industrial Responsiveness — a procurement program run by Air Force.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$18.9M
FY25 Total
FY26 Request
$20.0M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $18.9MFY26: $20.0MFY24FY26
FY24
$18.9M
FY26
$20.0M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$18.1M$35.3M$18.9M
Enacted$35.3M$18.9M$20.0M
Request$18.9M$20.0M$20.0M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Industrial Responsiveness

1. The Air Force (AF) Industrial Preparedness program element combines the resources of several appropriations (Aircraft Procurement, Missile Procurement, and Operation and Maintenance) to create a comprehensive program that aids in ensuring the defense industry can supply reliable, secure, safe, affordable systems to operational commanders. The Aircraft Procurement part of Industrial Preparedness support 1) management and upkeep of government-owned industrial plants; 2) management of industrial base assessments; 3) environmental compliance and pollution prevention at government-owned industrial plants. 2. Four basic activities are funded in this appropriation: Industrial Facilities (3000), Industrial Base Assessments (6000), Environmental Compliance (7000), and Pollution Prevention (6044). Industrial Facility Capital Type Rehabilitation cost element (MPC 3000) provides for repair and expansion, major capital rehabilitation, construction, demolition, equipment, real property directives (appraisals, easements, physical condition reports, etc.) and energy conservation to ensure AF government-owned, contractor-operated (GOCO) industrial facilities remain operationally safe, secure, suitable and effective to meet the nation's weapon system industry needs. These plants are the backbone of defense weapon system assembly and maintenance for the B-2, B-21, U-2, C-130J, RQ-4 Global Hawk, F-35 Joint Strike Fighter and classified programs and it is the intent of Congress (10USC 2535) to provide an essential nucleus of government owned industrial plants. Industrial Base Assessment cost element (MPC 6000) provides for the identification, analysis and assessment of industrial base concerns dealing with aircraft research and development, production, and sustainment. These assessments provide timely and accurate industrial base information to support AF decisions on 1) aircraft weapon system acquisition risks; 2) budget allocation investments; 3) weapon system sustainment and logistics support; and 4) defense industry mergers, acquisitions, and divestitures. Supports Joint and Service industrial base planning on shared commodities, technologies, and facilities. Environmental Compliance cost element (MPC 7000) provides for the efforts needed to maintain environmental compliance with federal, state, and local regulatory requirements regarding operation of the AF government-owned contractor-operated (GOCO) industrial facilities. The environmental compliance program includes efforts to enhance compliance through pollution prevention reducing controlled emissions and use of hazardous materials. Environmentally compliant industrial facilities enable production to continue and grow to meet our nation's weapon system needs and avoid the risk of shutdown due to non-compliance, cleanup costs and penalties from Federal, State and Local regulators. Pollution Prevention (P2) cost element (MPC 6044) at AF government-owned, contractor-operated (GOCO) facilities implements the Pollution Prevention program that reduces emissions to air, land, and water, reduces AF cost as facility owner. Implements Environmental, Safety and Occupational Health (ESOH) risk management that reduces weapon systems' risk impacts and life cycle costs. Includes qualification of improved processes, materials and equipment; energy conservation initiatives; P2 opportunity assessments; and recovery/recycling to minimize hazardous waste. Activities support Federal and AF Pollution Prevention goals and policies. Funding for this exhibit is contained in PE 0708011F.

Justification

Justification Industrial Responsiveness

FY26 Requirements are for MPC 3000 Capital Type Rehabilitation, MPC 6000 Industrial Base Assessment, MPC 7000 Environmental Compliance and MPC 6044 Pollution Prevention.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY24 Actuals$18.9M
Aircraft Procurement, Air ForceFFY25 Enacted$20.0M
Aircraft Procurement, Air ForceFFY26 Disc. Request$20.0M
Aircraft Procurement, Air ForceFFY26 Total$20.0M

Budget Details(R-2/P-40 facts)

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$18.9M$20.0M$20.0M$20.0M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →