Skip to content
Fiscal Receipts

Industrial Responsiveness

Air ForceProcurementReconciledBLI000073
What it is
Industrial Responsiveness (000073) is an Air Force procurement line funded in the Aircraft Procurement, Air Force account.
What changed
-$6.00K FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$18.9MP-1 TOA · PB2026
FY25 Enacted
$20.0MP-1 TOA · PB2026
FY26 Request
$20.0MP-1 TOA · PB2026
FY25→26 Change
-$6.00KP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $18.9MFY25: $20.0MFY26: $20.0MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$18.9M
FY25$20.0M
FY26$20.0M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$18.1M$35.3M$18.9M
Enacted–$35.3M$18.9M$20.0M
Request––$18.9M$20.0M$20.0M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Industrial Responsiveness

1. The Air Force (AF) Industrial Preparedness program element combines the resources of several appropriations (Aircraft Procurement, Missile Procurement, and Operation and Maintenance) to create a comprehensive program that aids in ensuring the defense industry can supply reliable, secure, safe, affordable systems to operational commanders. The Aircraft Procurement part of Industrial Preparedness support 1) management and upkeep of government-owned industrial plants; 2) management of industrial base assessments; 3) environmental compliance and pollution prevention at government-owned industrial plants. 2. Four basic activities are funded in this appropriation: Industrial Facilities (3000), Industrial Base Assessments (6000), Environmental Compliance (7000), and Pollution Prevention (6044). Industrial Facility Capital Type Rehabilitation cost element (MPC 3000) provides for repair and expansion, major capital rehabilitation, construction, demolition, equipment, real property directives (appraisals, easements, physical condition reports, etc.) and energy conservation to ensure AF government-owned, contractor-operated (GOCO) industrial facilities remain operationally safe, secure, suitable and effective to meet the nation's weapon system industry needs. These plants are the backbone of defense weapon system assembly and maintenance for the B-2, B-21, U-2, C-130J, RQ-4 Global Hawk, F-35 Joint Strike Fighter and classified programs and it is the intent of Congress (10USC 2535) to provide an essential nucleus of government owned industrial plants. Industrial Base Assessment cost element (MPC 6000) provides for the identification, analysis and assessment of industrial base concerns dealing with aircraft research and development, production, and sustainment. These assessments provide timely and accurate industrial base information to support AF decisions on 1) aircraft weapon system acquisition risks; 2) budget allocation investments; 3) weapon system sustainment and logistics support; and 4) defense industry mergers, acquisitions, and divestitures. Supports Joint and Service industrial base planning on shared commodities, technologies, and facilities. Environmental Compliance cost element (MPC 7000) provides for the efforts needed to maintain environmental compliance with federal, state, and local regulatory requirements regarding operation of the AF government-owned contractor-operated (GOCO) industrial facilities. The environmental compliance program includes efforts to enhance compliance through pollution prevention reducing controlled emissions and use of hazardous materials. Environmentally compliant industrial facilities enable production to continue and grow to meet our nation's weapon system needs and avoid the risk of shutdown due to non-compliance, cleanup costs and penalties from Federal, State and Local regulators. Pollution Prevention (P2) cost element (MPC 6044) at AF government-owned, contractor-operated (GOCO) facilities implements the Pollution Prevention program that reduces emissions to air, land, and water, reduces AF cost as facility owner. Implements Environmental, Safety and Occupational Health (ESOH) risk management that reduces weapon systems' risk impacts and life cycle costs. Includes qualification of improved processes, materials and equipment; energy conservation initiatives; P2 opportunity assessments; and recovery/recycling to minimize hazardous waste. Activities support Federal and AF Pollution Prevention goals and policies. Funding for this exhibit is contained in PE 0708011F.

Justification

Justification — Industrial Responsiveness

FY26 Requirements are for MPC 3000 Capital Type Rehabilitation, MPC 6000 Industrial Base Assessment, MPC 7000 Environmental Compliance and MPC 6044 Pollution Prevention.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY24 Actuals$18.9M
Aircraft Procurement, Air ForceFFY25 Enacted$20.0M
Aircraft Procurement, Air ForceFFY26 Disc. Request$20.0M
Aircraft Procurement, Air ForceFFY26 Total$20.0M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$18.9M$20.0M$20.0M$20.0M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Industrial Responsiveness. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.